CN102740360A - Cell load control method and apparatus thereof - Google Patents

Cell load control method and apparatus thereof Download PDF

Info

Publication number
CN102740360A
CN102740360A CN2011100911839A CN201110091183A CN102740360A CN 102740360 A CN102740360 A CN 102740360A CN 2011100911839 A CN2011100911839 A CN 2011100911839A CN 201110091183 A CN201110091183 A CN 201110091183A CN 102740360 A CN102740360 A CN 102740360A
Authority
CN
China
Prior art keywords
cell
load
service
comp
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100911839A
Other languages
Chinese (zh)
Other versions
CN102740360B (en
Inventor
姬广锋
樊荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110091183.9A priority Critical patent/CN102740360B/en
Priority to PCT/CN2011/084351 priority patent/WO2012139400A1/en
Publication of CN102740360A publication Critical patent/CN102740360A/en
Application granted granted Critical
Publication of CN102740360B publication Critical patent/CN102740360B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a cell load control method and an apparatus thereof. The method comprises the following steps that: when a first cell is overloaded, the first cell selects one or more UE from the UE which is served by the first cell to carry out service transfer; a service of the UE in the selected first cell is transferred to the other cell where cooperative multi-point (CoMP) cells are concentrated, wherein the CoMP cells serve the selected UE. By using the scheme of the invention, even if the UE does not generate switching or drop calls, the load of the cell can be effectively reduced so as to reduce a drop-call rate of the UE, reduce a switching rate of the UE and increase a KPI index of a system.

Description

一种小区负荷控制方法及装置Method and device for controlling load in a residential area

技术领域 technical field

本发明涉及移动通信领域,具体涉及在CoMP(Cooperative Multi-Point,多点协作)传输系统中的负荷控制方法及装置。The present invention relates to the field of mobile communication, in particular to a load control method and device in a CoMP (Cooperative Multi-Point, coordinated multi-point) transmission system.

背景技术 Background technique

在现有移动通信系统的负荷管理场景中,通常使用切换或者掉话来降低小区的负荷。对于LTE系统,当小区的负荷达到预设置的门限时,通常使用负荷均衡和负荷控制的方法来降低小区负荷,即选定本小区的一个UE,使之切换到目标小区;或者发生业务掉话。通过这两种方式来保证小区所提供的业务质量。而切换的流程比较复杂,掉话会严重影响网络的KPI指标,这两种降低小区负荷的方式都有各自很难克服的固有缺点。In the load management scenario of the existing mobile communication system, handover or call drop is usually used to reduce the load of the cell. For the LTE system, when the load of the cell reaches the preset threshold, the method of load balancing and load control is usually used to reduce the load of the cell, that is, to select a UE in the cell and switch it to the target cell; or a call drop occurs . These two methods are used to ensure the quality of service provided by the cell. The handover process is relatively complicated, and call drop will seriously affect the KPI index of the network. These two methods of reducing the load of the cell have their own inherent shortcomings that are difficult to overcome.

在LTE-A中,已经正式将CoMP传输技术作为一种备选技术进行研究。其基本原理是对边缘用户干扰较强的多个小区通过联合调度降低对小区边缘用户的干扰,通过联合传输进一步地提高小区边缘用户的接收功率,从而改善小区边缘用户的感受。多点协作传输技术特点在于:In LTE-A, CoMP transmission technology has been formally studied as a candidate technology. The basic principle is that multiple cells with strong interference to edge users reduce the interference to cell edge users through joint scheduling, and further increase the receiving power of cell edge users through joint transmission, thereby improving the experience of cell edge users. The characteristics of coordinated multi-point transmission technology are:

1)多个小区在相同的无线资源上协作,共同为一个UE服务;1) Multiple cells cooperate on the same radio resource and jointly serve a UE;

2)每个小区在相同的无线资源上同时为一个或多个UE服务。2) Each cell serves one or more UEs simultaneously on the same radio resource.

在LTE_A中引入CoMP传输技术后,小区负荷管理的方式将发生改变。目前,已有公开专利还未有在CoMP传输技术下对小区负荷管理的方法。After the CoMP transmission technology is introduced in LTE_A, the way of cell load management will change. At present, there is no method for cell load management under the CoMP transmission technology in the existing published patents.

发明内容 Contents of the invention

本发明提供一种小区负荷控制方法及装置,以解决如何在CoMP传输系统中实现小区负荷管理的问题。为解决上述技术问题,本发明提供了如下技术方案:The present invention provides a cell load control method and device to solve the problem of how to realize cell load management in a CoMP transmission system. In order to solve the problems of the technologies described above, the present invention provides the following technical solutions:

一种小区负荷控制方法,包括:A cell load control method, comprising:

当第一小区负荷过载时,所述第一小区从其所服务的用户设备UE中选择一个或多个UE进行业务转移;When the load of the first cell is overloaded, the first cell selects one or more UEs from the user equipment UEs it serves to perform service transfer;

将所选UE在所述第一小区中的业务转移到服务于所选UE的CoMP小区集中的其他小区中。Transferring the service of the selected UE in the first cell to other cells in the CoMP cell set serving the selected UE.

优选的,将所选UE在所述第一小区中的业务转移到服务于所选UE的CoMP小区集中的其他小区中,包括:Preferably, transferring the service of the selected UE in the first cell to other cells in the CoMP cell set serving the selected UE includes:

若所述第一小区是所述CoMP小区集中的主小区,所述第一小区将所选UE的业务转移到所述CoMP小区集中的辅小区中;If the first cell is a primary cell in the CoMP cell set, the first cell transfers the service of the selected UE to a secondary cell in the CoMP cell set;

若所述第一小区是所述CoMP小区集中的辅小区,所述第一小区向CoMP小区集中的主小区发送负荷过载指示,通知所述主小区转移所选UE在所述第一小区中的业务。If the first cell is a secondary cell in the CoMP cell set, the first cell sends a load overload indication to the primary cell in the CoMP cell set, notifying the primary cell to transfer the selected UE in the first cell business.

优选的,从所述第一小区所服务的UE中选择一个或多个UE进行业务转移,包括:Preferably, selecting one or more UEs from UEs served by the first cell for service transfer includes:

所述第一小区根据其所服务的UE的业务吞吐量和/或优先级选择一个或多个UE组成备选UE队列,依次对备选UE队列中的UE的业务进行转移直到所述第一小区的负荷正常。The first cell selects one or more UEs to form a candidate UE queue according to the service throughput and/or priority of the UEs it serves, and sequentially transfers the services of the UEs in the candidate UE queue until the first cell The load of the community is normal.

优选的,preferred,

若所述第一小区是所述CoMP小区集中的主小区,所述第一小区将所选UE的业务转移到所述CoMP小区集中的辅小区中,包括:If the first cell is the primary cell in the CoMP cell set, the first cell transfers the service of the selected UE to the secondary cell in the CoMP cell set, including:

所述第一小区根据所选UE的辅小区的负荷情况,将所选UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,并将接收或者发送所选UE的业务数据的物理资源告知所述一个或多个辅小区。The first cell transfers the service of the selected UE to one or more secondary cells in the CoMP cell set according to the load condition of the secondary cell of the selected UE, and transmits or receives service data of the selected UE. The physical resource informs the one or more secondary cells.

优选的,preferred,

所述负荷过载指示包括:所述第一小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;The load overload indication includes: the ID of the first cell, the ID of the selected UE, the service information to be transferred by the selected UE, and the bearer information to be transferred by the selected UE;

所述主小区接收到所述负荷过载指示之后,根据自身负荷情况和其他辅小区的负荷情况将所选UE在所述第一小区中的业务转移到所述主小区和/或其他辅小区中;若转移到其他辅小区中,则所述主小区还将接收或者发送所选UE的业务数据的物理资源告知所述其他辅小区。After the primary cell receives the load overload indication, it transfers the service of the selected UE in the first cell to the primary cell and/or other secondary cells according to its own load conditions and load conditions of other secondary cells ; If transferred to another secondary cell, the primary cell will also notify the other secondary cell of the physical resource for receiving or sending the service data of the selected UE.

为解决上述技术问题,本发明还提供一种小区负荷控制装置,包括UE选择模块和业务转移模块;In order to solve the above technical problems, the present invention also provides a cell load control device, including a UE selection module and a service transfer module;

所述UE选择模块,用于在检测到第一小区的负荷过载时,从所述第一小区所服务的UE中选择一个或多个UE发送给负荷转移模块;The UE selection module is configured to select one or more UEs from the UEs served by the first cell to send to the load transfer module when the load overload of the first cell is detected;

所述负荷转移模块,用于将所述UE选择模块选择的UE在所述第一小区中的业务转移到服务于所述UE的CoMP小区集中的其他小区中。The load transfer module is configured to transfer the service of the UE selected by the UE selection module in the first cell to other cells in the CoMP cell set serving the UE.

优选的,若所述第一小区是服务于所述CoMP小区集中的主小区,所述负荷转移模块,是用于将所述UE选择模块所选UE的业务转移到所述CoMP小区集中的辅小区中;Preferably, if the first cell is the primary cell serving the CoMP cell set, the load transfer module is used to transfer the service of the UE selected by the UE selection module to the secondary cell in the CoMP cell set in the community;

若所述第一小区是服务于所述UE选择模块所选UE的CoMP小区集中的辅小区,所述负荷转移模块,是用于向CoMP小区集中的主小区发送负荷过载指示,通知所述主小区转移所述UE选择模块所选UE在所述第一小区中的业务。If the first cell is a secondary cell in the CoMP cell set serving the UE selected by the UE selection module, the load transfer module is configured to send a load overload indication to the primary cell in the CoMP cell set to notify the primary cell The cell transfers the service of the UE selected by the UE selection module in the first cell.

优选的,所述UE选择模块,是用于根据所述第一小区所服务的UE的业务吞吐量和/或优先级选择一个或多个UE组成备选UE队列,依次将备选UE队列中的UE发送给负荷转移模块,直到检测到所述第一小区的负荷在所述门限值之下。Preferably, the UE selection module is configured to select one or more UEs to form a candidate UE queue according to the service throughput and/or priority of the UEs served by the first cell, and sequentially select the UEs in the candidate UE queue sent to the load transfer module by the UE until it is detected that the load of the first cell is below the threshold.

优选的,若所述第一小区是服务于其所选UE的CoMP小区集中的主小区,所述负荷转移模块,是用于根据所述UE选择模块所选UE的辅小区的负荷情况,将所选UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,并将接收或者发送所选UE的业务数据的物理资源告知所述一个或多个辅小区。Preferably, if the first cell is the primary cell in the CoMP cell set serving the selected UE, the load transfer module is configured to transfer the load of the secondary cell of the UE selected by the UE selection module The service of the selected UE is transferred to one or more secondary cells in the CoMP cell set, and the physical resources for receiving or sending the service data of the selected UE are notified to the one or more secondary cells.

优选的,所述负荷转移模块发送的负荷过载指示包括:所述第一小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;Preferably, the load overload indication sent by the load transfer module includes: the ID of the first cell, the ID of the selected UE, the service information to be transferred by the selected UE, and the bearer information to be transferred by the selected UE;

所述负荷转移模块,还用于接收第二小区的发送的负荷过载指示,根据第一小区的负荷情况和所述第二小区所选UE的其他辅小区的负荷情况将第二小区所选UE在所述第二小区中的业务转移到所述第一小区和/或所述第二小区所选UE其他辅小区中;若转移到所述第二小区所选UE其他辅小区中,还用于将接收或者发送所述第二小区所选UE的业务数据的物理资源告知所述第二小区所选UE其他辅小区。The load transfer module is further configured to receive a load overload indication sent by the second cell, and select the UE selected by the second cell according to the load condition of the first cell and the load condition of other secondary cells of the UE selected by the second cell The service in the second cell is transferred to the first cell and/or another secondary cell of the UE selected by the second cell; if the service is transferred to another secondary cell of the UE selected by the second cell, it is also used To inform other secondary cells of the UE selected by the second cell of the physical resource for receiving or sending the service data of the UE selected by the second cell.

采用本发明的方案,即使不使UE发生切换或者掉话,也可以有效的降低小区的负荷,减少了UE的掉话率,减少UE切换的几率,提高了系统的KPI指标。By adopting the scheme of the present invention, even if the UE is not switched or called dropped, the load of the cell can be effectively reduced, the dropped call rate of the UE is reduced, the probability of UE switched is reduced, and the KPI index of the system is improved.

附图说明 Description of drawings

图1为本发明的CoMP小区集的示意图;FIG. 1 is a schematic diagram of a CoMP cell set in the present invention;

图2为本发明实施例的小区负荷控制流程图;Fig. 2 is the flow chart of cell load control of the embodiment of the present invention;

图3为本发明应用实例一的示意图;Fig. 3 is the schematic diagram of application example 1 of the present invention;

图4为本发明应用实例二的示意图;Fig. 4 is the schematic diagram of the second application example of the present invention;

图5为本发明应用实例三的示意图;Fig. 5 is the schematic diagram of the third application example of the present invention;

图6为本发明应用实例四的示意图;Fig. 6 is a schematic diagram of application example 4 of the present invention;

图7为本发明应用实例五的示意图;Fig. 7 is a schematic diagram of the fifth application example of the present invention;

图8为本发明应用实例六的示意图。Fig. 8 is a schematic diagram of application example 6 of the present invention.

具体实施方式 Detailed ways

为使本发明的目的、技术方案和优点更加清楚明白,下文中将结合附图对本发明的实施例进行详细说明。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互任意组合。In order to make the purpose, technical solution and advantages of the present invention more clear, the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined arbitrarily with each other.

本发明基于CoMP技术,一个CoMP小区集服务于一个UE,如图1所示,小区1、2、3和7构成一个CoMP小区集同时服务于UE。其中,小区1为主小区,执行CoMP小区集中所有小区资源的统一调度,且与UE存在信令交互;如附图1小区2、3和7为辅小区,协助主小区为UE服务。The present invention is based on the CoMP technology. One CoMP cell set serves one UE. As shown in FIG. 1 , cells 1, 2, 3 and 7 form a CoMP cell set to serve the UE at the same time. Among them, cell 1 is the primary cell, which performs unified scheduling of all cell resources in the CoMP cell set, and has signaling interaction with the UE; as shown in Figure 1, cells 2, 3 and 7 are secondary cells, assisting the primary cell to serve the UE.

本发明提供一种小区负荷控制方法,包括:The present invention provides a cell load control method, comprising:

当第一小区负荷过载时,所述第一小区从其所服务的用户设备UE中选择一个或多个UE进行业务转移;When the load of the first cell is overloaded, the first cell selects one or more UEs from the user equipment UEs it serves to perform service transfer;

将所选UE在所述第一小区中的业务转移到服务于所选UE的CoMP小区集中的其他小区中。Transferring the service of the selected UE in the first cell to other cells in the CoMP cell set serving the selected UE.

本发明的小区负荷控制装置,包括UE选择模块和业务转移模块;The cell load control device of the present invention includes a UE selection module and a service transfer module;

所述UE选择模块,用于在检测到第一小区的负荷过载时,从所述第一小区所服务的UE中选择一个或多个UE发送给负荷转移模块;The UE selection module is configured to select one or more UEs from the UEs served by the first cell to send to the load transfer module when the load overload of the first cell is detected;

所述负荷转移模块,用于将所述UE选择模块选择的UE在所述第一小区中的业务转移到服务于所述UE的CoMP小区集中的其他小区中。The load transfer module is configured to transfer the service of the UE selected by the UE selection module in the first cell to other cells in the CoMP cell set serving the UE.

优选的,若所述第一小区是服务于所述CoMP小区集中的主小区,所述负荷转移模块,是用于将所述UE选择模块所选UE的业务转移到所述CoMP小区集中的辅小区中;Preferably, if the first cell is the primary cell serving the CoMP cell set, the load transfer module is used to transfer the service of the UE selected by the UE selection module to the secondary cell in the CoMP cell set in the community;

若所述第一小区是服务于所述UE选择模块所选UE的CoMP小区集中的辅小区,所述负荷转移模块,是用于向CoMP小区集中的主小区发送负荷过载指示,通知所述主小区转移所述UE选择模块所选UE在所述第一小区中的业务。If the first cell is a secondary cell in the CoMP cell set serving the UE selected by the UE selection module, the load transfer module is configured to send a load overload indication to the primary cell in the CoMP cell set to notify the primary cell The cell transfers the service of the UE selected by the UE selection module in the first cell.

优选的,所述UE选择模块,是用于根据所述第一小区所服务的UE的业务吞吐量和/或优先级选择一个或多个UE组成备选UE队列,依次将备选UE队列中的UE发送给负荷转移模块,直到检测到所述第一小区的负荷在所述门限值之下。Preferably, the UE selection module is configured to select one or more UEs to form a candidate UE queue according to the service throughput and/or priority of the UEs served by the first cell, and sequentially select the UEs in the candidate UE queue sent to the load transfer module by the UE until it is detected that the load of the first cell is below the threshold.

优选的,若所述第一小区是服务于其所选UE的CoMP小区集中的主小区,所述负荷转移模块,是用于根据所述UE选择模块所选UE的辅小区的负荷情况,将所选UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,并将接收或者发送所选UE的业务数据的物理资源告知所述一个或多个辅小区。Preferably, if the first cell is the primary cell in the CoMP cell set serving the selected UE, the load transfer module is configured to transfer the load of the secondary cell of the UE selected by the UE selection module The service of the selected UE is transferred to one or more secondary cells in the CoMP cell set, and the physical resources for receiving or sending the service data of the selected UE are notified to the one or more secondary cells.

优选的,所述负荷转移模块发送的负荷过载指示包括:所述第一小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;Preferably, the load overload indication sent by the load transfer module includes: the ID of the first cell, the ID of the selected UE, the service information to be transferred by the selected UE, and the bearer information to be transferred by the selected UE;

所述负荷转移模块,还用于接收第二小区的发送的负荷过载指示,根据第一小区的负荷情况和所述第二小区所选UE的其他辅小区的负荷情况将第二小区所选UE在所述第二小区中的业务转移到所述第一小区和/或所述第二小区所选UE其他辅小区中;若转移到所述第二小区所选UE其他辅小区中,还用于将接收或者发送所述第二小区所选UE的业务数据的物理资源告知所述第二小区所选UE其他辅小区。The load transfer module is further configured to receive a load overload indication sent by the second cell, and select the UE selected by the second cell according to the load condition of the first cell and the load condition of other secondary cells of the UE selected by the second cell The service in the second cell is transferred to the first cell and/or another secondary cell of the UE selected by the second cell; if the service is transferred to another secondary cell of the UE selected by the second cell, it is also used To inform other secondary cells of the UE selected by the second cell of the physical resource for receiving or sending the service data of the UE selected by the second cell.

如图2所示为本发明的小区符合控制方法实施例的具体流程图。FIG. 2 is a specific flow chart of an embodiment of the cell compliance control method of the present invention.

步骤201,小区A检测到自身负荷过载;Step 201, cell A detects that its own load is overloaded;

步骤202,根据小区A所服务的UE的业务吞吐量和/或优先级选择N个(N为正整数)UE组成备选UE队列;Step 202, select N (N is a positive integer) UEs to form a candidate UE queue according to the service throughput and/or priority of UEs served by cell A;

步骤203,判断小区A是否备选UE队列中队首UE的CoMP小区集中的主小区,若是,执行步骤204,若否,执行步骤210;Step 203, judging whether cell A is the primary cell in the CoMP cell set of the first UE in the candidate UE queue, if yes, execute step 204, if not, execute step 210;

步骤204,小区A将该队首UE的业务转移到CoMP小区集中的辅小区中;Step 204, cell A transfers the service of the head UE to the secondary cell in the CoMP cell set;

小区A根据辅小区的负荷情况,将UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,将接收或者发送UE的业务数据的物理资源告知所述一个或多个辅小区;Cell A transfers the service of the UE to one or more secondary cells in the CoMP cell set according to the load condition of the secondary cell, and notifies the one or more secondary cells of the physical resource for receiving or sending the service data of the UE;

可选的,小区A可选择负荷最小的辅小区,也可选择负荷较小的多个辅小区来接收或发送该UE的业务数据;Optionally, cell A may select the secondary cell with the least load, or select multiple secondary cells with relatively small load to receive or send the service data of the UE;

可选的,小区A可通过MAC调度指示将接收或者发送UE的业务数据的物理资源告知所述一个或多个辅小区。Optionally, cell A may notify the one or more secondary cells of the physical resource for receiving or sending service data of the UE through a MAC scheduling instruction.

步骤205,辅小区接收到MAC调度指示,接受调度后向小区A发送调度成功响应;Step 205, the secondary cell receives the MAC scheduling instruction, and sends a scheduling success response to cell A after accepting the scheduling;

步骤206,小区A释放该UE的业务;Step 206, cell A releases the service of the UE;

步骤207,小区A检测小区负荷是否正常,若是,结束流程,若否,执行步骤208;Step 207, cell A detects whether the cell load is normal, if so, end the process, if not, execute step 208;

步骤208,在备选UE队列中将已进行业务转移的UE删除,并将N的值减1;Step 208, delete the UE that has performed service transfer in the candidate UE queue, and decrement the value of N by 1;

步骤209,判断N的值是否等于0,若是,执行步骤202;若否,执行步骤203;Step 209, judge whether the value of N is equal to 0, if so, execute step 202; if not, execute step 203;

步骤210,小区A向队首UE的主小区发送负荷过载指示,通知主小区需要将该UE的业务转移;Step 210, cell A sends a load overload indication to the primary cell of the first UE, informing the primary cell that the service of the UE needs to be transferred;

可选的,所述负荷过载指示可包括本小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;Optionally, the load overload indication may include the ID of the current cell, the ID of the selected UE, service information to be transferred by the selected UE, and bearer information to be transferred by the selected UE;

步骤211,主小区判断自身负荷是否可以承载该UE要转移的业务,若是,执行步骤212;若不是执行步骤214;Step 211, the primary cell judges whether its own load can carry the service to be transferred by the UE, if so, execute step 212; if not, execute step 214;

步骤212,主小区将要转移的业务转移到主小区中;Step 212, the main cell transfers the service to be transferred to the main cell;

步骤213,主小区向小区A发送调度成功响应,执行步骤206;Step 213, the primary cell sends a scheduling success response to cell A, and executes step 206;

步骤214,主小区将要转移的业务转移到该UE的其他辅小区中;Step 214, the primary cell transfers the service to be transferred to other secondary cells of the UE;

步骤215,接收到调度指示的其他辅小区向主小区发送调度成功响应,主小区转发给小区A,执行步骤206。In step 215, other secondary cells that have received the scheduling instruction send a scheduling success response to the primary cell, and the primary cell forwards it to cell A, and step 206 is performed.

以下为本发明的应用实例:The following are application examples of the present invention:

应用实例一:小区1上行负荷过载,选择UE1进行业务转移,小区1为UE1的主小区Application example 1: The uplink load of cell 1 is overloaded, UE1 is selected for service transfer, and cell 1 is the main cell of UE1

如图3所示,正常情况下UE1的上行业务由主小区(小区1)和辅小区(小区2)共同承担。UE1上行业务哪部分由主小区承担,哪部分由辅小区承担,都由主小区来统一协调。主小区和辅小区分别接收UE的上行数据,辅小区再将其接收的上行数据传送给主小区,由主小区将UE1的全部上行数据传送给核心网。As shown in FIG. 3 , under normal circumstances, the uplink service of UE1 is shared by the primary cell (cell 1 ) and the secondary cell (cell 2 ). Which part of UE1's uplink service is undertaken by the primary cell and which part is undertaken by the secondary cell is uniformly coordinated by the primary cell. The primary cell and the secondary cell respectively receive uplink data of the UE, and the secondary cell transmits the received uplink data to the primary cell, and the primary cell transmits all uplink data of UE1 to the core network.

小区1检测到自身负荷过载之后,选择UE1进行业务转移,由于小区1为UE1的主小区,这时主小区就会和UE1的辅小区进行资源协调,主小区不再接收UE1的上行业务,由辅小区来承担UE1的全部上行业务,之后再将UE的上行数据通过X2口发给主小区,由主小区发给核心网。After cell 1 detects that its own load is overloaded, it selects UE1 for service transfer. Since cell 1 is the primary cell of UE1, the primary cell will coordinate resources with UE1's secondary cell at this time. The primary cell no longer receives UE1's uplink services. The secondary cell is responsible for all uplink services of UE1, and then sends the UE's uplink data to the primary cell through the X2 port, and the primary cell sends it to the core network.

应用实例二:小区1下行负荷过载,选择UE1进行业务转移,小区1为UE1的主小区Application example 2: The downlink load of cell 1 is overloaded, UE1 is selected for service transfer, and cell 1 is the main cell of UE1

如图4所示,正常情况下核心网将下行数据传送给UE1的主小区(小区1),主小区进行资源协调调度,由主小区和辅小区(小区2)共同承担UE1的下行业务数据,并调度哪些是由辅小区(小区2)传给UE1,哪些由主小区直接传给UE1。As shown in Figure 4, under normal circumstances, the core network transmits downlink data to the primary cell (cell 1) of UE1, and the primary cell performs resource coordination and scheduling, and the primary cell and the secondary cell (cell 2) share the downlink service data of UE1. And schedule which ones are transmitted to UE1 by the secondary cell (cell 2 ), and which ones are directly transmitted to UE1 by the primary cell.

当小区1检测到自身负荷过载,选定UE1进行业务转移,由于小区1为UE1的主小区,此时,核心网传到主小区的下行数据由主小区全部调度给UE1的辅小区,主小区不再为备选UE的下行业务服务。When cell 1 detects that its own load is overloaded, UE1 is selected for service transfer. Since cell 1 is the primary cell of UE1, all downlink data transmitted from the core network to the primary cell is dispatched by the primary cell to the secondary cell of UE1. No longer serve the downlink service of the candidate UE.

应用实例三:小区2上行负荷过载,选择UE1进行业务转移,小区2为UE1的辅小区Application example 3: The uplink load of cell 2 is overloaded, UE1 is selected for service transfer, and cell 2 is the secondary cell of UE1

如图5所示,正常情况下UE1的上行业务由主小区(小区1)和辅小区(小区2)共同承担。UE1上行业务哪部分由主小区承担,哪部分由辅小区承担,都由主小区来统一协调。主小区和辅小区分别接收UE1的上行数据,辅小区再将其接收的上行数据传送给主小区,由主小区将UE1的全部上行数据传送给核心网。As shown in FIG. 5 , under normal circumstances, the uplink service of UE1 is shared by the primary cell (cell 1 ) and the secondary cell (cell 2 ). Which part of UE1's uplink service is undertaken by the primary cell and which part is undertaken by the secondary cell is uniformly coordinated by the primary cell. The primary cell and the secondary cell respectively receive the uplink data of UE1, and the secondary cell transmits the received uplink data to the primary cell, and the primary cell transmits all the uplink data of UE1 to the core network.

小区2检测到自身负荷过载后,选择UE1进行业务转移,由于小区2是UE1的辅小区,小区2向UE1的主小区(小区1)发送负荷过载指示,告知主小区小区2的ID,UE1的ID,业务承载信息以及业务传输状态等信息,主小区就会根据自身和其它辅小区的负荷情况,来决定是由主小区自身,还是由其它辅小区来承担原来由小区2承担的UE1的上行业务。After Cell 2 detects that its own load is overloaded, it selects UE1 for service transfer. Since Cell 2 is the secondary cell of UE1, Cell 2 sends a load overload indication to the primary cell (Cell 1) of UE1 and informs the primary cell of the ID of Cell 2. UE1's ID, service bearer information, service transmission status and other information, the primary cell will decide whether the primary cell itself or other secondary cells should undertake the uplink of UE1 that was originally undertaken by cell 2 according to the load conditions of itself and other secondary cells. business.

在主小区自身负荷允许的条件下,原来由小区2所承担的UE1的上行业务由主小区来承担,主小区在进行资源协调调度时接收UE1的全部上行业务数据,接收后发到核心网,小区2不再接收UE1的上行业务数据。Under the condition that the main cell’s own load allows, the uplink business of UE1 originally undertaken by cell 2 is assumed by the main cell. When performing resource coordination and scheduling, the main cell receives all the uplink business data of UE1 and sends it to the core network. Cell 2 no longer receives the uplink service data of UE1.

应用实例四:小区2下行负荷过载,选择UE1进行业务转移,小区2为UE1的辅小区Application example 4: The downlink load of cell 2 is overloaded, UE1 is selected for service transfer, and cell 2 is the secondary cell of UE1

如图6所示,正常情况下核心网将下行数据传送给UE1的主小区(小区1),主小区进行资源协调调度,由主小区和辅小区(小区2)共同承担UE1的下行业务数据,并调度哪些是由辅小区(小区2)传给UE1,哪些由主小区直接传给UE1。As shown in Figure 6, under normal circumstances, the core network transmits downlink data to the primary cell (cell 1) of UE1, and the primary cell performs resource coordination and scheduling, and the primary cell and the secondary cell (cell 2) share the downlink service data of UE1. And schedule which ones are transmitted to UE1 by the secondary cell (cell 2 ), and which ones are directly transmitted to UE1 by the primary cell.

当小区2检测到自身负荷过载,选定UE1进行业务转移,由于小区2为UE1的辅小区,小区2向UE1的主小区(小区1)发送负荷过载指示,告知主小区小区2的ID,UE1的ID,业务承载信息以及业务传输状态等信息,主小区就会根据自身和其它辅小区的负荷情况,来决定是原来由小区2承担的UE1的下行数据由主小区自己承担,还是由其它辅小区来承担。When cell 2 detects that its own load is overloaded, it selects UE1 for service transfer. Since cell 2 is the secondary cell of UE1, cell 2 sends a load overload indication to the primary cell (cell 1) of UE1 and informs the primary cell of the ID of cell 2. UE1 ID, service bearer information, service transmission status and other information, the primary cell will decide whether the downlink data of UE1 originally borne by cell 2 should be borne by the primary cell itself or by other secondary cells according to the load conditions of itself and other secondary cells. The community will take care of it.

在主小区自身负荷允许的条件下,原来由小区2所承担的UE1的上行业务由主小区来承担,资源协调调度时不再让小区2来接收UE1的下行数据,主小区从核心网接收到UE1的下行数据后直接传给UE1。。Under the condition that the main cell’s own load allows, the uplink service of UE1 that was originally undertaken by cell 2 is assumed by the main cell. During resource coordination and scheduling, cell 2 is no longer allowed to receive the downlink data of UE1, and the main cell receives from the core network. The downlink data of UE1 is directly transmitted to UE1. .

应用实例五:小区2上行负荷过载,选择UE1进行业务转移,小区2为UE1的辅小区Application example 5: The uplink load of cell 2 is overloaded, UE1 is selected for service transfer, and cell 2 is the secondary cell of UE1

如图7所示,正常情况下UE1的上行业务由主小区(小区1)和辅小区(小区2和小区3)共同承担。UE1上行业务哪部分由主小区承担,哪部分由小区2及小区3承担,都由主小区来统一协调。主小区和辅小区分别接收UE1的上行数据,辅小区再将其接收的上行数据传送给主小区,由主小区将UE1的全部上行数据传送给核心网。As shown in FIG. 7 , under normal circumstances, the uplink service of UE1 is shared by the primary cell (cell 1 ) and the secondary cell (cell 2 and cell 3 ). Which part of UE1's uplink service is undertaken by the primary cell, and which part is undertaken by cell 2 and cell 3, are all coordinated by the primary cell. The primary cell and the secondary cell respectively receive the uplink data of UE1, and the secondary cell transmits the received uplink data to the primary cell, and the primary cell transmits all the uplink data of UE1 to the core network.

小区2检测到自身负荷过载后,选择UE1进行业务转移,由于小区2是UE1的辅小区,小区2向UE1的主小区(小区1)发送负荷过载指示,告知主小区小区2的ID,UE1的ID,业务承载信息以及业务传输状态等信息,主小区就会根据自身和其它辅小区的负荷情况,来决定是由主小区自身,还是由其它辅小区来承担原来由小区2承担的UE1的上行业务。After Cell 2 detects that its own load is overloaded, it selects UE1 for service transfer. Since Cell 2 is the secondary cell of UE1, Cell 2 sends a load overload indication to the primary cell (Cell 1) of UE1 and informs the primary cell of the ID of Cell 2. UE1's ID, service bearer information, service transmission status and other information, the primary cell will decide whether the primary cell itself or other secondary cells should undertake the uplink of UE1 that was originally undertaken by cell 2 according to the load conditions of itself and other secondary cells. business.

主小区判断自身负荷不能再承担所述负荷过载指示中的业务,将该业务调度到其它辅小区(小区3),由小区3来承载该业务,保证该条业务的QoS。主小区将由其将UE1的上行数据发给主小区,主小区将UE1的全部上行数据发送到核心网。The primary cell judges that its own load can no longer undertake the service indicated in the load overload indication, and schedules the service to another secondary cell (cell 3), and the cell 3 carries the service to ensure the QoS of the service. The primary cell will send the uplink data of UE1 to the primary cell, and the primary cell will send all the uplink data of UE1 to the core network.

应用实例六:小区2下行负荷过载,选择UE1进行业务转移,小区2为UE1的辅小区Application example 6: The downlink load of cell 2 is overloaded, UE1 is selected for service transfer, and cell 2 is the secondary cell of UE1

如图8所示,正常情况下核心网将下行数据传送给UE1的主小区(小区1),主小区进行资源协调调度,由主小区和辅小区(小区1和小区2)共同承担UE1的下行业务数据,并调度哪些是由辅小区(小区1和小区2)传给UE1,哪些由主小区直接传给UE1。As shown in Figure 8, under normal circumstances, the core network transmits downlink data to the primary cell (cell 1) of UE1, and the primary cell performs resource coordination and scheduling. Service data, and schedule which ones are transmitted to UE1 by the secondary cell (cell 1 and cell 2), and which ones are directly transmitted to UE1 by the primary cell.

当小区2检测到自身负荷过载,选定UE1进行业务转移,由于小区2为UE1的辅小区,小区2向UE1的主小区(小区1)发送负荷过载指示,告知主小区小区2的ID,UE1的ID,业务承载信息以及业务传输状态等信息,主小区就会根据自身和其它辅小区的负荷情况,来决定是原来由小区2承担的UE1的下行数据由主小区自己承担,还是由其它辅小区来承担。When cell 2 detects that its own load is overloaded, it selects UE1 for service transfer. Since cell 2 is the secondary cell of UE1, cell 2 sends a load overload indication to the primary cell (cell 1) of UE1 and informs the primary cell of the ID of cell 2. UE1 ID, service bearer information, service transmission status and other information, the primary cell will decide whether the downlink data of UE1 originally borne by cell 2 should be borne by the primary cell itself or by other secondary cells according to the load conditions of itself and other secondary cells. The community will take care of it.

主小区判断自身负荷不能再承担所述负荷过载指示中的业务,将该业务调度到其它辅小区(小区3),由小区3来承载该业务。主小区接收到核心网下发的UE1的下行数据后,将之前由小区2承担的下行数据传给小区3,由小区3发给UE1。The primary cell judges that its own load can no longer bear the service indicated in the load overload indication, and schedules the service to another secondary cell (cell 3), and the cell 3 bears the service. After receiving the downlink data of UE1 delivered by the core network, the primary cell transmits the downlink data previously undertaken by cell 2 to cell 3, and then cell 3 sends it to UE1.

可选地,上述实施例的全部或部分步骤也可以使用集成电路来实现,这些步骤可以被分别制作成一个个集成电路模块,或者将它们中的多个模块或步骤制作成单个集成电路模块来实现。这样,本发明不限制于任何特定的硬件和软件结合。Optionally, all or part of the steps in the above embodiments can also be implemented using integrated circuits, and these steps can be fabricated into individual integrated circuit modules, or multiple modules or steps among them can be fabricated into a single integrated circuit module accomplish. As such, the present invention is not limited to any specific combination of hardware and software.

上述实施例中的各装置/功能模块/功能单元可以采用通用的计算装置来实现,它们可以集中在单个的计算装置上,也可以分布在多个计算装置所组成的网络上。The devices/functional modules/functional units in the above embodiments can be realized by general-purpose computing devices, and they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices.

上述实施例中的各装置/功能模块/功能单元以软件功能模块的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。上述提到的计算机可读取存储介质可以是只读存储器,磁盘或光盘等。When each device/functional module/functional unit in the above-mentioned embodiments is realized in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, and the like.

以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以权利要求所述的保护范围为准。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present invention. Should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope described in the claims.

Claims (10)

1.一种小区负荷控制方法,其特征在于,包括:1. A cell load control method, characterized in that, comprising: 当第一小区负荷过载时,所述第一小区从其所服务的用户设备UE中选择一个或多个UE进行业务转移;When the load of the first cell is overloaded, the first cell selects one or more UEs from the user equipment UEs it serves to perform service transfer; 将所选UE在所述第一小区中的业务转移到服务于所选UE的多点协作CoMP小区集中的其他小区中。Transferring the service of the selected UE in the first cell to other cells in the set of coordinated multi-point CoMP cells serving the selected UE. 2.如权利要求1所述的方法,其特征在于,将所选UE在所述第一小区中的业务转移到服务于所选UE的CoMP小区集中的其他小区中,包括:2. The method according to claim 1, wherein transferring the service of the selected UE in the first cell to other cells in the CoMP cell set serving the selected UE comprises: 若所述第一小区是所述CoMP小区集中的主小区,所述第一小区将所选UE的业务转移到所述CoMP小区集中的辅小区中;If the first cell is a primary cell in the CoMP cell set, the first cell transfers the service of the selected UE to a secondary cell in the CoMP cell set; 若所述第一小区是所述CoMP小区集中的辅小区,所述第一小区向CoMP小区集中的主小区发送负荷过载指示,通知所述主小区转移所选UE在所述第一小区中的业务。If the first cell is a secondary cell in the CoMP cell set, the first cell sends a load overload indication to the primary cell in the CoMP cell set, notifying the primary cell to transfer the selected UE in the first cell business. 3.如权利要求1或2所述的方法,其特征在于,从所述第一小区所服务的UE中选择一个或多个UE进行业务转移,包括:3. The method according to claim 1 or 2, wherein selecting one or more UEs from the UEs served by the first cell for service transfer comprises: 所述第一小区根据其所服务的UE的业务吞吐量和/或优先级选择一个或多个UE组成备选UE队列,依次对备选UE队列中的UE的业务进行转移直到所述第一小区的负荷正常。The first cell selects one or more UEs to form a candidate UE queue according to the service throughput and/or priority of the UEs it serves, and sequentially transfers the services of the UEs in the candidate UE queue until the first cell The load of the community is normal. 4.根据权利要求2所述的方法,其特征在于,4. The method of claim 2, wherein, 若所述第一小区是所述CoMP小区集中的主小区,所述第一小区将所选UE的业务转移到所述CoMP小区集中的辅小区中,包括:If the first cell is the primary cell in the CoMP cell set, the first cell transfers the service of the selected UE to the secondary cell in the CoMP cell set, including: 所述第一小区根据所选UE的辅小区的负荷情况,将所选UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,并将接收或者发送所选UE的业务数据的物理资源告知所述一个或多个辅小区。The first cell transfers the service of the selected UE to one or more secondary cells in the CoMP cell set according to the load condition of the secondary cell of the selected UE, and transmits or receives service data of the selected UE. The physical resource informs the one or more secondary cells. 5.根据权利要求2所述的方法,其特征在于,5. The method of claim 2, wherein, 所述负荷过载指示包括:所述第一小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;The load overload indication includes: the ID of the first cell, the ID of the selected UE, the service information to be transferred by the selected UE, and the bearer information to be transferred by the selected UE; 所述主小区接收到所述负荷过载指示之后,根据自身负荷情况和其他辅小区的负荷情况将所选UE在所述第一小区中的业务转移到所述主小区和/或其他辅小区中;若转移到其他辅小区中,则所述主小区还将接收或者发送所选UE的业务数据的物理资源告知所述其他辅小区。After the primary cell receives the load overload indication, it transfers the service of the selected UE in the first cell to the primary cell and/or other secondary cells according to its own load conditions and load conditions of other secondary cells ; If transferred to another secondary cell, the primary cell will also notify the other secondary cell of the physical resource for receiving or sending the service data of the selected UE. 6.一种小区负荷控制装置,其特征在于,包括UE选择模块和业务转移模块;6. A cell load control device, comprising a UE selection module and a service transfer module; 所述UE选择模块,用于在第一小区的负荷过载时,从所述第一小区所服务的UE中选择一个或多个UE发送给负荷转移模块;The UE selection module is configured to select one or more UEs from the UEs served by the first cell to send to the load transfer module when the load of the first cell is overloaded; 所述负荷转移模块,用于将所述UE选择模块选择的UE在所述第一小区中的业务转移到服务于所述UE的CoMP小区集中的其他小区中。The load transfer module is configured to transfer the service of the UE selected by the UE selection module in the first cell to other cells in the CoMP cell set serving the UE. 7.如权利要求6所述的装置,其特征在于,7. The apparatus of claim 6, wherein 若所述第一小区是所述CoMP小区集中的主小区,所述负荷转移模块,是用于将所述UE选择模块所选UE的业务转移到所述CoMP小区集中的辅小区中;If the first cell is the primary cell in the CoMP cell set, the load transfer module is configured to transfer the service of the UE selected by the UE selection module to the secondary cell in the CoMP cell set; 若所述第一小区是服务于所述CoMP小区集中的辅小区,所述负荷转移模块,是用于向CoMP小区集中的主小区发送负荷过载指示,通知所述主小区转移所述UE选择模块所选UE在所述第一小区中的业务。If the first cell is a secondary cell serving the CoMP cell set, the load transfer module is configured to send a load overload indication to the primary cell in the CoMP cell set, and notify the primary cell to transfer the UE selection module Traffic of the selected UE in the first cell. 8.如权利要求6或7所述的装置,其特征在于,8. Apparatus as claimed in claim 6 or 7, characterized in that, 所述UE选择模块,是用于根据所述第一小区所服务的UE的业务吞吐量和/或优先级选择一个或多个UE组成备选UE队列,依次将备选UE队列中的UE发送给负荷转移模块,直到检测到所述第一小区的负荷在所述门限值之下。The UE selection module is used to select one or more UEs to form a candidate UE queue according to the service throughput and/or priority of the UEs served by the first cell, and sequentially send UEs in the candidate UE queue to the load transfer module until it is detected that the load of the first cell is below the threshold. 9.根据权利要求7所述的装置,其特征在于,9. The apparatus of claim 7, wherein: 若所述第一小区是服务于所述CoMP小区集中的主小区,所述负荷转移模块,是用于根据所述UE选择模块所选UE的辅小区的负荷情况,将所选UE的业务转移到所述CoMP小区集中的一个或多个辅小区中,并将接收或者发送所选UE的业务数据的物理资源告知所述一个或多个辅小区。If the first cell is the primary cell serving the CoMP cell set, the load transfer module is configured to transfer the service of the selected UE according to the load condition of the secondary cell of the UE selected by the UE selection module to one or more secondary cells in the CoMP cell set, and notify the one or more secondary cells of the physical resource for receiving or sending service data of the selected UE. 10.根据权利要求7所述的装置,其特征在于,10. The apparatus of claim 7, wherein: 所述负荷转移模块发送的负荷过载指示包括:所述第一小区的ID、所选UE的ID、所选UE要转移的业务信息以及所选UE要转移的承载信息;The load overload indication sent by the load transfer module includes: the ID of the first cell, the ID of the selected UE, the service information to be transferred by the selected UE, and the bearer information to be transferred by the selected UE; 所述负荷转移模块,还用于接收第二小区的发送的负荷过载指示,根据第一小区的负荷情况和所述第二小区所选UE的其他辅小区的负荷情况将第二小区所选UE在所述第二小区中的业务转移到所述第一小区和/或所述第二小区所选UE其他辅小区中;若转移到所述第二小区所选UE其他辅小区中,还用于将接收或者发送所述第二小区所选UE的业务数据的物理资源告知所述第二小区所选UE其他辅小区。The load transfer module is further configured to receive a load overload indication sent by the second cell, and select the UE selected by the second cell according to the load condition of the first cell and the load condition of other secondary cells of the UE selected by the second cell The service in the second cell is transferred to the first cell and/or another secondary cell of the UE selected by the second cell; if the service is transferred to another secondary cell of the UE selected by the second cell, it is also used To inform other secondary cells of the UE selected by the second cell of the physical resource for receiving or sending the service data of the UE selected by the second cell.
CN201110091183.9A 2011-04-12 2011-04-12 A kind of cell load control method and device Active CN102740360B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110091183.9A CN102740360B (en) 2011-04-12 2011-04-12 A kind of cell load control method and device
PCT/CN2011/084351 WO2012139400A1 (en) 2011-04-12 2011-12-21 Cell load control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110091183.9A CN102740360B (en) 2011-04-12 2011-04-12 A kind of cell load control method and device

Publications (2)

Publication Number Publication Date
CN102740360A true CN102740360A (en) 2012-10-17
CN102740360B CN102740360B (en) 2016-08-03

Family

ID=46994944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110091183.9A Active CN102740360B (en) 2011-04-12 2011-04-12 A kind of cell load control method and device

Country Status (2)

Country Link
CN (1) CN102740360B (en)
WO (1) WO2012139400A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103828422A (en) * 2012-12-31 2014-05-28 华为技术有限公司 Load balancing method and network control node
CN104170444A (en) * 2013-10-21 2014-11-26 华为技术有限公司 Scheduling method and base station
CN105247941A (en) * 2013-12-30 2016-01-13 华为技术有限公司 Method and device for activating secondary cell, communication system, base station, and user equipment
CN105874845A (en) * 2013-12-19 2016-08-17 华为技术有限公司 Method and apparatus for determining performance indicator of communications network
CN107113116A (en) * 2014-11-13 2017-08-29 高通股份有限公司 Cell handover for discontinuous transmission (DTX) in shared spectrum
CN108271239A (en) * 2017-01-02 2018-07-10 联发科技(新加坡)私人有限公司 The method and apparatus that a kind of electric power is saved
CN108668325A (en) * 2017-12-22 2018-10-16 航天恒星科技有限公司 User-Oriented Energy Efficiency CoMP Handover Method Based on LTE-A System
CN111246531A (en) * 2018-11-28 2020-06-05 中国移动通信集团浙江有限公司 Switching method and base station

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105208602B (en) * 2015-10-16 2018-12-11 中国联合网络通信集团有限公司 A kind of method and device of load balancing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060166677A1 (en) * 2005-01-27 2006-07-27 Lucent Technologies, Inc. Balancing load of cells in inter-frequency handover of wireless communications
CN101080082A (en) * 2006-05-22 2007-11-28 上海贝尔阿尔卡特股份有限公司 Device and method for switching control via joint detection of multiple cell load
CN101772081A (en) * 2008-12-31 2010-07-07 中兴通讯股份有限公司 Method and system for dynamically balancing cell load in wireless network
CN102685776A (en) * 2011-03-08 2012-09-19 中兴通讯股份有限公司 Method for reducing cell load through CoMP technology and cell

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8942165B2 (en) * 2008-08-01 2015-01-27 Qualcomm Incorporated System and method for distributed multiple-input multiple-output (MIMO) in a wireless communication system
CN101415207B (en) * 2008-12-04 2010-08-25 北京邮电大学 Method, apparatus and base station for balancing load of honeycomb collaboration relay network
WO2010124439A1 (en) * 2009-04-27 2010-11-04 华为技术有限公司 Configuring method, device and system for collaboration zone

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060166677A1 (en) * 2005-01-27 2006-07-27 Lucent Technologies, Inc. Balancing load of cells in inter-frequency handover of wireless communications
CN101080082A (en) * 2006-05-22 2007-11-28 上海贝尔阿尔卡特股份有限公司 Device and method for switching control via joint detection of multiple cell load
CN101772081A (en) * 2008-12-31 2010-07-07 中兴通讯股份有限公司 Method and system for dynamically balancing cell load in wireless network
CN102685776A (en) * 2011-03-08 2012-09-19 中兴通讯股份有限公司 Method for reducing cell load through CoMP technology and cell

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103828422A (en) * 2012-12-31 2014-05-28 华为技术有限公司 Load balancing method and network control node
CN104170444A (en) * 2013-10-21 2014-11-26 华为技术有限公司 Scheduling method and base station
CN104170444B (en) * 2013-10-21 2018-07-31 华为技术有限公司 Dispatching method and base station
CN105874845A (en) * 2013-12-19 2016-08-17 华为技术有限公司 Method and apparatus for determining performance indicator of communications network
CN105874845B (en) * 2013-12-19 2019-05-28 华为技术有限公司 Method and apparatus for determining performance indicators of a communication network
CN105247941A (en) * 2013-12-30 2016-01-13 华为技术有限公司 Method and device for activating secondary cell, communication system, base station, and user equipment
CN107113116A (en) * 2014-11-13 2017-08-29 高通股份有限公司 Cell handover for discontinuous transmission (DTX) in shared spectrum
CN107113116B (en) * 2014-11-13 2020-12-11 高通股份有限公司 Method, apparatus and computer readable medium for cell handover with discontinuous transmission (DTX) in shared spectrum
US10993151B2 (en) 2014-11-13 2021-04-27 Qualcomm Incorporated Cell switching for discontinuous transmission (DTX) in shared spectrum
CN108271239A (en) * 2017-01-02 2018-07-10 联发科技(新加坡)私人有限公司 The method and apparatus that a kind of electric power is saved
CN108271239B (en) * 2017-01-02 2021-01-29 联发科技(新加坡)私人有限公司 Power saving method and device
CN108668325A (en) * 2017-12-22 2018-10-16 航天恒星科技有限公司 User-Oriented Energy Efficiency CoMP Handover Method Based on LTE-A System
CN108668325B (en) * 2017-12-22 2020-10-23 航天恒星科技有限公司 User-level-energy-efficiency-oriented CoMP switching method based on LTE-A system
CN111246531A (en) * 2018-11-28 2020-06-05 中国移动通信集团浙江有限公司 Switching method and base station
CN111246531B (en) * 2018-11-28 2021-11-30 中国移动通信集团浙江有限公司 Switching method and base station

Also Published As

Publication number Publication date
CN102740360B (en) 2016-08-03
WO2012139400A1 (en) 2012-10-18

Similar Documents

Publication Publication Date Title
CN102740360B (en) A kind of cell load control method and device
JP6862572B2 (en) A V2X communication execution method performed by a V2X terminal in a wireless communication system and a terminal using the method.
US11184886B2 (en) Method, base station, and user equipment for implementing carrier aggregation
EP3051876B1 (en) Small cell switching method, enb and computer storage medium
CN107820291B (en) Network slice control method and related equipment
EP3035735B1 (en) Handover method, master base station and slave base station
KR101749010B1 (en) Wireless communication system and method therein
US20120040684A1 (en) Load Sharing Method, Device, and System
KR102389742B1 (en) PDCP Redundancy Mechanism Activation Method and Node Device
WO2013155941A1 (en) Dynamic spectrum sharing method and device
CN107306438A (en) Method for generating radio access network slices, radio access network and slice manager
KR20190127854A (en) QoS processing method and device
CN101605385B (en) A method, device and system for indicating discontinuous scheduling data
US20140200011A1 (en) LTE/HSDPA Carrier Aggregation
CN104349483A (en) Resource dispatching method and device in CoMP (coordinated multiple points transmission/reception) scene
CN102685785A (en) Radio resource control (RRC) connection reestablishing method and equipment
CN102056240B (en) A load balancing method among cells and a base station
US10034213B2 (en) Method and network entity for load contribution distribution in a wireless communication system
WO2012097644A1 (en) Bearer processing method, device and system
CN112533254B (en) Cell load balancing method, device and network equipment
CN107302773B (en) Connection establishment method, device and system
US20140162631A1 (en) Load sharing method, base station, user equipment, load sharing node, and system
CN104581827A (en) A load balancing method and device
JP2024045406A (en) Signaling exchange method, base station and device
CN111357321B (en) Method and device for load balancing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant