CN102685776A - Method for reducing cell load through CoMP technology and cell - Google Patents

Method for reducing cell load through CoMP technology and cell Download PDF

Info

Publication number
CN102685776A
CN102685776A CN201110054652XA CN201110054652A CN102685776A CN 102685776 A CN102685776 A CN 102685776A CN 201110054652X A CN201110054652X A CN 201110054652XA CN 201110054652 A CN201110054652 A CN 201110054652A CN 102685776 A CN102685776 A CN 102685776A
Authority
CN
China
Prior art keywords
cell
load
comp
coordinated
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110054652XA
Other languages
Chinese (zh)
Other versions
CN102685776B (en
Inventor
李子帅
樊荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110054652.XA priority Critical patent/CN102685776B/en
Priority to PCT/CN2011/082245 priority patent/WO2012119461A2/en
Publication of CN102685776A publication Critical patent/CN102685776A/en
Application granted granted Critical
Publication of CN102685776B publication Critical patent/CN102685776B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • H04W28/086Load balancing or load distribution among access entities
    • H04W28/0861Load balancing or load distribution among access entities between base stations
    • H04W28/0864Load balancing or load distribution among access entities between base stations of different hierarchy levels, e.g. Master Evolved Node B [MeNB] or Secondary Evolved node B [SeNB]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/022Site diversity; Macro-diversity
    • H04B7/024Co-operative use of antennas of several sites, e.g. in co-ordinated multipoint or co-operative multiple-input multiple-output [MIMO] systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

本发明揭示了一种通过CoMP技术降低小区负荷的方法,包括:当小区负荷达到一预设值时,选择一用户设备UE;当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;删除所述UE。本发明提供的一种通过CoMP技术降低小区负荷的方法和小区,在避免UE发生切换或者掉话的同时,有效的降低小区的负荷,减少UE的掉话率和发生切换的几率,提高了系统的关键性能指标。

Figure 201110054652

The present invention discloses a method for reducing the load of a cell through CoMP technology, including: when the load of the cell reaches a preset value, selecting a user equipment UE; when the cell is the primary cell of the CoMP cell set of the UE, changing a coordinated cell of the UE to be the primary cell; when the cell is a coordinated cell of the CoMP cell set of the UE, withdrawing from the CoMP cell set of the UE; and deleting the UE. The method and the cell for reducing the load of the cell through the CoMP technology provided by the present invention can effectively reduce the load of the cell while avoiding the handover or call drop of the UE, reduce the call drop rate of the UE and the probability of handover, and improve the system key performance indicators.

Figure 201110054652

Description

通过CoMP技术降低小区负荷的方法及小区Method and cell for reducing cell load through CoMP technology

技术领域 technical field

本发明涉及到通信领域,特别涉及到一种通过CoMP技术降低小区负荷的方法和小区。The present invention relates to the communication field, in particular to a method and a cell for reducing cell load through CoMP technology.

背景技术 Background technique

在现有移动通信系统的负荷管理场景中,通常使用切换或者掉话来降低小区的负荷。对于长期演进(Long Term Evolution,LTE)系统,当小区的负荷达到设置的门限时,通常使用负荷均衡和负荷控制的方法来降低小区负荷,即选定本小区的一个用户设备(User Equipment,UE),使之切换到目标小区;或者发生业务掉话。通过这两种方式来保证小区所提供的业务质量,但这两种切换都会影响被切换UE或发生业务掉话UE的业务服务质量,降低用户体验。In the load management scenario of the existing mobile communication system, handover or call drop is usually used to reduce the load of the cell. For the Long Term Evolution (LTE) system, when the load of the cell reaches the set threshold, the method of load balancing and load control is usually used to reduce the load of the cell, that is, a User Equipment (UE) of the cell is selected. ), so that it is handed over to the target cell; or a service call drop occurs. These two methods are used to ensure the quality of service provided by the cell, but these two handovers will affect the service quality of the UE being handed over or the UE where a service call is dropped, and reduce user experience.

发明内容 Contents of the invention

本发明的主要目的为提供一种通过CoMP技术降低小区负荷的方法和小区,在不影响UE业务服务质量的情况下降低小区负荷。The main purpose of the present invention is to provide a method and a cell for reducing cell load through CoMP technology, and reduce cell load without affecting UE service quality.

本发明提出一种通过CoMP技术降低小区负荷的方法,包括:The present invention proposes a method for reducing cell load through CoMP technology, including:

当小区负荷达到一预设值时,选择一用户设备UE;When the cell load reaches a preset value, select a user equipment UE;

当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;When the cell is the primary cell of the CoMP cell set of the UE, changing a coordinated cell of the UE to the primary cell;

当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;When the cell is a coordinated cell of the CoMP cell set of the UE, withdraw from the CoMP cell set of the UE;

删除所述UE。Delete the UE.

优选地,在执行所述删除UE之后,还包括:Preferably, after performing the deleting UE, it further includes:

所述UE的主小区根据该UE的业务服务质量决定是否增加协作小区。The primary cell of the UE decides whether to add a coordinated cell according to the service quality of the UE.

优选地,在执行所述当小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区之后,还包括:Preferably, after performing said changing a coordinated cell of the UE to the primary cell when the cell is the primary cell of the CoMP cell set of the UE, the method further includes:

将变更后的主小区通知所述UE的其它协作小区。Notifying other coordinated cells of the UE of the changed primary cell.

优选地,所述当小区负荷达到一预设值时,选择一用户设备UE包括:Preferably, when the cell load reaches a preset value, selecting a user equipment UE includes:

根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel.

优选地,所述当小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区包括:Preferably, when the cell is the primary cell of the UE's CoMP cell set, changing a coordinated cell of the UE to the primary cell includes:

获取各协作小区的负荷和业务服务质量信息;Obtain the load and business service quality information of each cooperative cell;

根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。According to the load and service quality information of each coordinated cell, select a coordinated cell as the changed primary cell, and withdraw from the CoMP cell set of the UE.

本发明还提出一种通过CoMP技术降低小区负荷的小区,包括:The present invention also proposes a cell that reduces cell load through CoMP technology, including:

选择UE模块,用于当小区负荷达到一预设值时,选择一用户设备UE;A UE selection module, configured to select a user equipment UE when the cell load reaches a preset value;

变更模块,用于当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;A change module, configured to change a coordinated cell of the UE to the primary cell when the cell is the primary cell of the CoMP cell set of the UE;

退出模块,用于当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;An exit module, configured to exit the UE's CoMP cell set when the cell is a coordinated cell of the UE's CoMP cell set;

删除模块,用于删除所述UE。A deletion module, configured to delete the UE.

优选地,所述通过CoMP技术降低小区负荷的小区还包括:Preferably, the cell that reduces the load of the cell through the CoMP technology further includes:

新增模块,用于根据所述UE的业务服务质量决定是否增加协作小区。A newly added module is used to decide whether to add a coordinated cell according to the service quality of the UE.

优选地,所述通过CoMP技术降低小区负荷的小区还包括:Preferably, the cell that reduces the load of the cell through the CoMP technology further includes:

通知模块,用于将变更后的主小区通知所述UE的其它协作小区。A notification module, configured to notify other coordinated cells of the UE of the changed primary cell.

优选地,所述选择UE模块还用于:Preferably, the UE selection module is also used for:

根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel.

优选地,所述变更模块包括:Preferably, the change module includes:

获取单元,用于获取各协作小区的负荷和业务服务质量信息;An acquisition unit, configured to acquire load and business service quality information of each coordinated cell;

选择单元,用于根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。The selection unit is configured to select a coordinated cell as the changed primary cell according to the load and service quality information of each coordinated cell, and withdraw from the CoMP cell set of the UE.

本发明提供的一种通过CoMP技术降低小区负荷的方法和小区,在避免UE发生切换或者掉话的同时,有效的降低小区的负荷,减少UE的掉话率和发生切换的几率,提高了系统的关键性能指标(Key Performance Index,KPI)。The method and the cell for reducing the load of the cell through the CoMP technology provided by the present invention can effectively reduce the load of the cell while avoiding the handover or call drop of the UE, reduce the call drop rate of the UE and the probability of handover, and improve the system The key performance indicators (Key Performance Index, KPI).

附图说明 Description of drawings

图1为本发明通过CoMP技术降低小区负荷的方法一实施例的流程示意图;FIG. 1 is a schematic flow diagram of an embodiment of a method for reducing cell load through CoMP technology in the present invention;

图2为本发明通过CoMP技术降低小区负荷的方法又一实施例的流程示意图;FIG. 2 is a schematic flow diagram of another embodiment of the method for reducing cell load through CoMP technology in the present invention;

图3为本发明通过CoMP技术降低小区负荷的方法一实施例中变更过程的流程示意图;FIG. 3 is a schematic flow chart of the change process in an embodiment of the method for reducing cell load by CoMP technology in the present invention;

图4为本发明通过CoMP技术降低小区负荷的小区一实施例的流程示意图;FIG. 4 is a schematic flowchart of an embodiment of a cell that reduces cell load through CoMP technology in the present invention;

图5为本发明通过CoMP技术降低小区负荷的小区又一实施例的流程示意图;FIG. 5 is a schematic flowchart of another embodiment of a cell that reduces cell load through CoMP technology in the present invention;

图6为本发明通过CoMP技术降低小区负荷的小区一实施例中变更模块的流程示意图。Fig. 6 is a schematic flow diagram of a changing module in an embodiment of a cell in which the cell load is reduced by the CoMP technology in the present invention.

本发明目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization of the purpose of the present invention, functional characteristics and advantages will be further described in conjunction with the embodiments and with reference to the accompanying drawings.

具体实施方式 Detailed ways

应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

参照图1,提出本发明一种通过CoMP技术降低小区负荷的方法一实施例,包括:Referring to FIG. 1, an embodiment of a method for reducing cell load through CoMP technology in the present invention is proposed, including:

步骤S10、当小区负荷达到一预设值时,选择一用户设备UE;Step S10, when the cell load reaches a preset value, select a user equipment UE;

当小区的负荷超过一预设值时认为该小区负荷过载,则该小区从CoMP小区集的UE实例中选择一UE作为负荷控制的UE,目的是减少小区内UE个数,在短时间内迅速降低小区负荷。When the load of the cell exceeds a preset value, it is considered that the cell is overloaded, and the cell selects a UE from the UE instances in the CoMP cell set as the UE for load control. The purpose is to reduce the number of UEs in the cell and quickly Reduce community load.

步骤S11、当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;Step S11, when the cell is the primary cell of the UE's CoMP cell set, changing a coordinated cell of the UE to the primary cell;

UE选定后,判断负荷过载的小区是否属于该UE的CoMP小区集中的主小区,如果是则触发主小区迁移负荷控制流程:主小区即负荷过载的小区首先与UE的各协作小区通信,从各协作小区中选择一个协作小区,然后与该协作小区协商,将主小区迁移至该协作小区。After the UE is selected, it judges whether the overloaded cell belongs to the primary cell in the CoMP cell set of the UE, and if so, triggers the primary cell migration load control process: the primary cell, that is, the cell with overloaded load, first communicates with each cooperative cell of the UE, and then Select a cooperating cell among the coordinating cells, and then negotiate with the cooperating cell to migrate the primary cell to the cooperating cell.

步骤S12、当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;Step S12, when the cell is a cooperating cell of the CoMP cell set of the UE, withdraw from the CoMP cell set of the UE;

如果负荷过载的小区是该UE的协作小区,则触发协作小区迁移负荷控制流程:协作小区向主小区发送负荷过载指示,通知主小区其即将删除该UE,消息的内容包括但不限于以下信息:该协作小区ID,UE的ID,UE业务服务质量信息等。If the overloaded cell is the coordinated cell of the UE, the coordinated cell migration load control process is triggered: the coordinated cell sends a load overload indication to the primary cell, notifying the primary cell that it is about to delete the UE. The content of the message includes but is not limited to the following information: The coordinated cell ID, the ID of the UE, the service quality information of the UE service, and the like.

步骤S13、删除所述UE。Step S13, delete the UE.

当负荷过载的小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区后,该小区本地删除该UE。或者,当负荷过载的小区为UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集后,同样本地删除该UE。When the overloaded cell is the primary cell of the CoMP cell set of the UE, after changing a cooperating cell of the UE to the primary cell, the cell locally deletes the UE. Or, when the overloaded cell is a cooperating cell of the UE's CoMP cell set, after exiting the UE's CoMP cell set, the UE is also deleted locally.

本实施例中,负荷过载的小区在避免UE发生切换或者掉话的同时,有效的降低小区的负荷,减少UE的掉话率和发生切换的几率,提高了系统的关键性能指标。In this embodiment, the load-overloaded cell effectively reduces the load of the cell while avoiding UE handover or call drop, reduces the UE call drop rate and the probability of handover, and improves the key performance index of the system.

参照图2,提出本发明一种通过CoMP技术降低小区负荷的方法又一实施例,在执行步骤S11之后,还包括:Referring to FIG. 2 , another embodiment of the method for reducing the load of a cell through the CoMP technology of the present invention is proposed. After step S11 is performed, it further includes:

步骤S14、将变更后的主小区通知UE的其它协作小区。Step S14 , notifying other coordinated cells of the UE of the changed primary cell.

负荷过载的小区从协作小区中选择一个协作小区作为变更后的主小区,与该协作小区协商,将主小区迁移至该协作小区后,再向其他协作小区发送主小区变更通知。The overloaded cell selects a coordinated cell from the coordinated cells as the changed primary cell, negotiates with the coordinated cell, migrates the primary cell to the coordinated cell, and then sends a primary cell change notification to other coordinated cells.

在执行步骤S13之后,还包括:After step S13 is performed, it also includes:

步骤S15、所述UE的主小区根据该UE的业务服务质量决定是否增加协作小区。Step S15, the primary cell of the UE decides whether to add a coordinated cell according to the service quality of the UE.

主小区发生迁移或协作小区退出CoMP小区集后,CoMP小区集中的主小区,根据当前CoMP小区集内各协作小区的负荷、UE业务信道质量、UE业务服务质量等因素,决定是否需要扩充CoMP小区集。若需要增加,则在邻区中查找除协作小区和原来的主小区之外的小区,要求UE上报这些小区的下行信道质量状况,以及要求这些小区反馈自身的负荷、资源使用情况和上行信道质量状况,主小区根据上述信息以及UE的服务质量需求,选择新的协作小区。最后,主小区发送重配消息给该UE,消息中携带最新的CoMP集小区信息,UE接收后,回应重配完成消息,并与最新的CoMP集小区进行数据传输。After the primary cell migrates or the coordinated cell exits the CoMP cell set, the primary cell in the CoMP cell set decides whether to expand the CoMP cell based on factors such as the load of each coordinated cell in the current CoMP cell set, UE service channel quality, and UE service quality. set. If it needs to be added, look for cells other than the coordinated cell and the original primary cell in the neighboring cells, and ask the UE to report the downlink channel quality status of these cells, and ask these cells to feed back their own load, resource usage, and uplink channel quality In this situation, the primary cell selects a new coordinated cell according to the above information and the service quality requirements of the UE. Finally, the primary cell sends a reconfiguration message to the UE. The message carries the latest CoMP set cell information. After receiving the message, the UE responds with a reconfiguration complete message and performs data transmission with the latest CoMP set cell.

本实施例中,当负荷过载的小区通过主小区迁移或退出CoMP小区集的方式降低负荷后,变更后的主小区通知其它协作小区上述变更,且根据UE的业务服务质量决定是否新增协作小区,为后续降负荷作准备。In this embodiment, when the overloaded cell reduces the load by migrating the primary cell or exiting the CoMP cell set, the changed primary cell notifies other cooperating cells of the above changes, and decides whether to add a cooperating cell according to the service quality of the UE , in preparation for subsequent load reduction.

在上述实施例中,步骤S10可包括:In the above embodiment, step S10 may include:

根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel.

当小区的负荷超过一预设值时,该小区从CoMP小区集的UE实例中选择一UE作为负荷控制的UE。选取原则可为:综合考虑各UE的优先级、现有业务的吞吐量和业务信道质量等因素,选取用户优先级较低、业务吞吐量较大和业务信道质量较差的UE作为降负荷的UE。When the load of the cell exceeds a preset value, the cell selects a UE from UE instances in the CoMP cell set as a UE for load control. The selection principle can be: comprehensively consider factors such as the priority of each UE, the throughput of existing services, and the quality of service channels, and select UEs with lower user priority, higher service throughput, and poorer service channel quality as UEs for load reduction .

本实施例中,通过小区内各UE的综合情况选择负荷控制的UE,其它可以用于选择负荷控制UE的方法也适用于本发明。In this embodiment, UEs for load control are selected based on the overall conditions of UEs in the cell, and other methods that can be used for selecting UEs for load control are also applicable to the present invention.

参照图3,在上述实施例中,步骤S11可包括:Referring to FIG. 3, in the above embodiment, step S11 may include:

步骤S111、获取各协作小区的负荷和业务服务质量信息;Step S111, obtaining load and business service quality information of each coordinated cell;

当负荷过载的小区为选定UE的CoMP小区集的主小区时,负荷过载的小区首先与UE的各协作小区通信,获取协作小区的负荷、UE业务信道质量等情况。When the overloaded cell is the primary cell of the CoMP cell set of the selected UE, the overloaded cell first communicates with each cooperating cell of the UE to obtain information such as the load of the cooperating cell and the quality of the service channel of the UE.

步骤S112、根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。Step S112 , according to the load and service quality information of each coordinated cell, select a coordinated cell as the changed primary cell, and withdraw from the CoMP cell set of the UE.

负荷过载的小区从协作小区中选择一个负荷较低、UE业务信道质量较好的小区。与该协作小区协商后,将主小区迁移至该协作小区。也可根据实际情况来进行选择。A cell with an overloaded load selects a cell with a lower load and a better UE service channel quality from the coordinated cells. After negotiating with the coordinated cell, the primary cell is migrated to the coordinated cell. It can also be selected according to the actual situation.

参照图4,提出本发明一种通过CoMP技术降低小区负荷的小区一实施例,包括:Referring to FIG. 4 , an embodiment of the present invention is proposed to reduce the load of the cell through the CoMP technology, including:

选择UE模块10,用于当小区负荷达到一预设值时,选择一用户设备UE;A UE selection module 10, configured to select a user equipment UE when the cell load reaches a preset value;

变更模块20,用于当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;A change module 20, configured to change a coordinated cell of the UE to the primary cell when the cell is the primary cell of the CoMP cell set of the UE;

退出模块30,用于当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;An exit module 30, configured to exit the UE's CoMP cell set when the cell is a coordinated cell of the UE's CoMP cell set;

删除模块40,用于删除所述UE。The deletion module 40 is configured to delete the UE.

当小区的负荷超过一预设值时认为该小区负荷过载,则选择UE模块10从CoMP小区集的UE实例中选择一UE作为负荷控制的UE,目的是减少小区内UE个数,在短时间内迅速降低小区负荷。When the load of the cell exceeds a preset value, it is considered that the load of the cell is overloaded, and the UE selection module 10 selects a UE from the UE instances in the CoMP cell set as the UE for load control. The purpose is to reduce the number of UEs in the cell, and in a short time Rapidly reduce the load of the community.

UE选定后,判断负荷过载的小区是否属于该UE的CoMP小区集中的主小区,如果是则触发主小区迁移负荷控制流程:变更模块20首先与UE的各协作小区通信,从各协作小区中选择一个协作小区,然后与该协作小区协商,将主小区迁移至该协作小区。After the UE is selected, it is judged whether the overloaded cell belongs to the primary cell in the UE's CoMP cell set, and if so, the primary cell migration load control process is triggered: the change module 20 first communicates with each coordinated cell of the UE, and selects the UE from each coordinated cell Select a cooperating cell, and then negotiate with the cooperating cell to migrate the main cell to the cooperating cell.

如果负荷过载的小区是该UE的协作小区,则触发协作小区迁移负荷控制流程:退出模块30向主小区发送负荷过载指示,通知主小区其即将删除该UE,消息的内容包括但不限于以下信息:该协作小区ID,UE的ID,UE业务服务质量信息等。If the overloaded cell is the cooperative cell of the UE, the coordinated cell migration load control process is triggered: the exit module 30 sends a load overload indication to the primary cell, notifying the primary cell that it is about to delete the UE, and the content of the message includes but not limited to the following information : The coordinated cell ID, UE ID, UE service quality of service information, etc.

当负荷过载的小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区后,删除模块40删除该UE。或者,当负荷过载的小区为UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集后,同样删除模块40删除该UE。When the overloaded cell is the primary cell of the UE's CoMP cell set, after changing a cooperating cell of the UE to the primary cell, the deletion module 40 deletes the UE. Or, when the overloaded cell is a cooperating cell of the CoMP cell set of the UE, after exiting the CoMP cell set of the UE, the deleting module 40 also deletes the UE.

本实施例中,负荷过载的小区在避免UE发生切换或者掉话的同时,有效的降低小区的负荷,减少UE的掉话率和发生切换的几率,提高了系统的关键性能指标。In this embodiment, the load-overloaded cell effectively reduces the load of the cell while avoiding UE handover or call drop, reduces the UE call drop rate and the probability of handover, and improves the key performance index of the system.

参照图5,提出本发明一种通过CoMP技术降低小区负荷的小区又一实施例,在上一实施例中,还包括:Referring to FIG. 5 , another embodiment of the present invention is proposed to reduce the load of the cell through the CoMP technology. In the previous embodiment, it also includes:

通知模块50,用于将变更后的主小区通知所述UE的其它协作小区。The notification module 50 is configured to notify other coordinated cells of the UE of the changed primary cell.

新增模块60,用于根据所述UE的业务服务质量决定是否增加协作小区。A newly added module 60, configured to decide whether to add a coordinated cell according to the service quality of the UE.

负荷过载的小区从协作小区中选择一个协作小区作为变更后的主小区,与该协作小区协商,将主小区迁移至该协作小区后,再由通知模块50向其他协作小区发送主小区变更通知。The overloaded cell selects a coordinated cell from the coordinated cells as the changed primary cell, negotiates with the coordinated cell, migrates the primary cell to the coordinated cell, and then sends the primary cell change notification to other coordinated cells by the notification module 50 .

主小区发生迁移或协作小区退出CoMP小区集后,新增模块60根据当前CoMP小区集内各协作小区的负荷、UE业务信道质量、UE业务服务质量等因素,决定是否需要扩充CoMP小区集。若需要增加,则在邻区中查找除协作小区和原来的主小区之外的小区,要求UE上报这些小区的下行信道质量状况,以及要求这些小区反馈自身的负荷、资源使用情况和上行信道质量状况,新增模块60根据上述信息以及UE的服务质量需求,选择新的协作小区。最后,发送重配消息给该UE,消息中携带最新的CoMP集小区信息,UE接收后,回应重配完成消息,并与最新的CoMP集小区进行数据传输。After the primary cell migrates or the cooperating cell exits the CoMP cell set, the new module 60 decides whether to expand the CoMP cell set according to factors such as the load of each cooperating cell in the current CoMP cell set, UE traffic channel quality, and UE service quality. If it needs to be added, look for cells other than the coordinated cell and the original primary cell in the neighboring cells, and ask the UE to report the downlink channel quality status of these cells, and ask these cells to feed back their own load, resource usage, and uplink channel quality status, the adding module 60 selects a new coordinated cell according to the above information and the QoS requirement of the UE. Finally, send a reconfiguration message to the UE. The message carries the latest CoMP set cell information. After receiving the message, the UE responds with a reconfiguration complete message and performs data transmission with the latest CoMP set cell.

本实施例中,当负荷过载的小区通过主小区迁移或退出CoMP小区集的方式降低负荷后,通知模块50通知其它协作小区上述变更,且新增模块60根据UE的业务服务质量决定是否新增协作小区,为后续降负荷作准备。In this embodiment, when the overloaded cell reduces its load by migrating the primary cell or exiting the CoMP cell set, the notification module 50 notifies other cooperative cells of the above changes, and the adding module 60 decides whether to add a new one according to the service quality of the UE. Cooperate with the community to prepare for the subsequent load reduction.

在上述实施例中,选择UE模块10还可用于:In the above embodiments, the UE selection module 10 can also be used for:

根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel.

当小区的负荷超过一预设值时,选择UE模块10从CoMP小区集的UE实例中选择一UE作为负荷控制的UE。选取原则可为:综合考虑各UE的优先级、现有业务的吞吐量和业务信道质量等因素,选取用户优先级较低、业务吞吐量较大和业务信道质量较差的UE作为降负荷的UE。When the load of the cell exceeds a preset value, the UE selection module 10 selects a UE from UE instances in the CoMP cell set as a UE for load control. The selection principle can be: comprehensively consider factors such as the priority of each UE, the throughput of existing services, and the quality of service channels, and select UEs with lower user priority, higher service throughput, and poorer service channel quality as UEs for load reduction .

本实施例中,通过小区内各UE的综合情况选择负荷控制的UE,其它可以用于选择负荷控制UE的方法也适用于本发明。In this embodiment, UEs for load control are selected based on the overall conditions of UEs in the cell, and other methods that can be used for selecting UEs for load control are also applicable to the present invention.

参照图6,在上述实施例中,变更模块20可包括:Referring to Fig. 6, in the above embodiment, the change module 20 may include:

获取单元21,用于获取各协作小区的负荷和业务服务质量信息;An acquisition unit 21, configured to acquire load and business service quality information of each coordinated cell;

选择单元22,用于根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。The selection unit 22 is configured to select a coordinated cell as the changed primary cell according to the load and service quality information of each coordinated cell, and withdraw from the CoMP cell set of the UE.

当负荷过载的小区为选定UE的CoMP小区集的主小区时,获取单元21首先与UE的各协作小区通信,获取协作小区的负荷、UE业务信道质量等情况。选择单元22从协作小区中选择一个负荷较低、UE业务信道质量较好的小区。与该协作小区协商后,将主小区迁移至该协作小区,并退出该UE的CoMP小区集。也可根据实际情况来进行选择。When the overloaded cell is the primary cell of the CoMP cell set of the selected UE, the acquiring unit 21 first communicates with each cooperating cell of the UE to acquire the load of the coordinating cell, UE traffic channel quality, and the like. The selection unit 22 selects a cell with a relatively low load and a relatively good UE service channel quality from the coordinated cells. After negotiating with the coordinated cell, the primary cell is migrated to the coordinated cell, and withdraws from the CoMP cell set of the UE. It can also be selected according to the actual situation.

以上所述仅为本发明的优选实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the description of the present invention and the contents of the accompanying drawings, or directly or indirectly used in other related All technical fields are equally included in the scope of patent protection of the present invention.

Claims (10)

1.一种通过CoMP技术降低小区负荷的方法,其特征在于,包括:1. A method for reducing cell load by CoMP technology, characterized in that, comprising: 当小区负荷达到一预设值时,选择一用户设备UE;When the cell load reaches a preset value, select a user equipment UE; 当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;When the cell is the primary cell of the CoMP cell set of the UE, changing a coordinated cell of the UE to the primary cell; 当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;When the cell is a coordinated cell of the CoMP cell set of the UE, withdraw from the CoMP cell set of the UE; 删除所述UE。Delete the UE. 2.如权利要求1所述的通过CoMP技术降低小区负荷的方法,其特征在于,在执行所述删除UE之后,还包括:2. The method for reducing cell load through CoMP technology according to claim 1, further comprising: 所述UE的主小区根据该UE的业务服务质量决定是否增加协作小区。The primary cell of the UE decides whether to add a coordinated cell according to the service quality of the UE. 3.如权利要求1或2所述的通过CoMP技术降低小区负荷的方法,其特征在于,在执行所述当小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区之后,还包括:3. The method for reducing the load of a cell through CoMP technology according to claim 1 or 2, wherein, when the cell is the primary cell of the CoMP cell set of the UE, a coordinated cell of the UE is changed to After the main cell, it also includes: 将变更后的主小区通知所述UE的其它协作小区。Notifying other coordinated cells of the UE of the changed primary cell. 4.如权利要求1或2所述的通过CoMP技术降低小区负荷的方法,其特征在于,所述当小区负荷达到一预设值时,选择一用户设备UE包括:4. The method for reducing cell load through CoMP technology according to claim 1 or 2, wherein when the cell load reaches a preset value, selecting a user equipment UE comprises: 根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel. 5.如权利要求1或2所述的通过CoMP技术降低小区负荷的方法,其特征在于,所述当小区为UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区包括:5. The method for reducing cell load through CoMP technology according to claim 1 or 2, wherein when the cell is the primary cell of the CoMP cell set of the UE, changing a coordinated cell of the UE to the primary cell include: 获取各协作小区的负荷和业务服务质量信息;Obtain the load and business service quality information of each cooperative cell; 根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。According to the load and service quality information of each coordinated cell, select a coordinated cell as the changed primary cell, and withdraw from the CoMP cell set of the UE. 6.一种通过CoMP技术降低小区负荷的小区,其特征在于,包括:6. A cell for reducing cell load by CoMP technology, characterized in that, comprising: 选择UE模块,用于当小区负荷达到一预设值时,选择一用户设备UE;A UE selection module, configured to select a user equipment UE when the cell load reaches a preset value; 变更模块,用于当所述小区为所述UE的CoMP小区集的主小区时,将该UE的一协作小区变更为主小区;A change module, configured to change a coordinated cell of the UE to the primary cell when the cell is the primary cell of the CoMP cell set of the UE; 退出模块,用于当所述小区为所述UE的CoMP小区集的协作小区时,退出该UE的CoMP小区集;An exit module, configured to exit the UE's CoMP cell set when the cell is a coordinated cell of the UE's CoMP cell set; 删除模块,用于删除所述UE。A deletion module, configured to delete the UE. 7.如权利要求6所述的通过CoMP技术降低小区负荷的小区,其特征在于,还包括:7. The cell for reducing cell load by CoMP technology as claimed in claim 6, further comprising: 新增模块,用于根据所述UE的业务服务质量决定是否增加协作小区。A newly added module is used to decide whether to add a coordinated cell according to the service quality of the UE. 8.如权利要求6或7所述的通过CoMP技术降低小区负荷的小区,其特征在于,还包括:8. The cell for reducing cell load by CoMP technology according to claim 6 or 7, further comprising: 通知模块,用于将变更后的主小区通知所述UE的其它协作小区。A notification module, configured to notify other coordinated cells of the UE of the changed primary cell. 9.如权利要求6或7所述的通过CoMP技术降低小区负荷的小区,其特征在于,所述选择UE模块还用于:9. The cell for reducing cell load by CoMP technology as claimed in claim 6 or 7, wherein the UE selection module is also used for: 根据小区内各UE的优先级、现有业务的吞吐量和业务信道质量选择一UE。Select a UE according to the priority of each UE in the cell, the throughput of the existing service and the quality of the service channel. 10.如权利要求6或7所述的通过CoMP技术降低小区负荷的小区,其特征在于,所述变更模块包括:10. The cell for reducing cell load by CoMP technology according to claim 6 or 7, wherein the changing module comprises: 获取单元,用于获取各协作小区的负荷和业务服务质量信息;An acquisition unit, configured to acquire load and business service quality information of each coordinated cell; 选择单元,用于根据各协作小区的负荷和业务服务质量信息,选择一协作小区作为变更后的主小区,并退出该UE的CoMP小区集。The selection unit is configured to select a coordinated cell as the changed primary cell according to the load and service quality information of each coordinated cell, and withdraw from the CoMP cell set of the UE.
CN201110054652.XA 2011-03-08 2011-03-08 The method and device that cell load is reduced by CoMP technology Expired - Fee Related CN102685776B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110054652.XA CN102685776B (en) 2011-03-08 2011-03-08 The method and device that cell load is reduced by CoMP technology
PCT/CN2011/082245 WO2012119461A2 (en) 2011-03-08 2011-11-15 Method for decreasing cell load by way of coordinated multiple point technology and evolved nodeb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110054652.XA CN102685776B (en) 2011-03-08 2011-03-08 The method and device that cell load is reduced by CoMP technology

Publications (2)

Publication Number Publication Date
CN102685776A true CN102685776A (en) 2012-09-19
CN102685776B CN102685776B (en) 2017-03-15

Family

ID=46798589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110054652.XA Expired - Fee Related CN102685776B (en) 2011-03-08 2011-03-08 The method and device that cell load is reduced by CoMP technology

Country Status (2)

Country Link
CN (1) CN102685776B (en)
WO (1) WO2012119461A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102740360A (en) * 2011-04-12 2012-10-17 中兴通讯股份有限公司 Cell load control method and apparatus thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106162884B (en) * 2015-03-25 2019-07-26 电信科学技术研究院 A kind of method for managing resource and equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1717092A (en) * 2004-06-29 2006-01-04 中兴通讯股份有限公司 Method for dynamically regulating auxiliary carrier frequency of multiple carrier frequency small village in radio communication system
US20060166677A1 (en) * 2005-01-27 2006-07-27 Lucent Technologies, Inc. Balancing load of cells in inter-frequency handover of wireless communications
CN1941988A (en) * 2005-09-29 2007-04-04 普天信息技术研究院 Method for allocating multiple carrier-frequency domain
CN101080082A (en) * 2006-05-22 2007-11-28 上海贝尔阿尔卡特股份有限公司 Device and method for switching control via joint detection of multiple cell load
CN101119140A (en) * 2006-08-03 2008-02-06 鼎桥通信技术有限公司 A load balancing method and device in a hierarchical cell structure
CN101415207A (en) * 2008-12-04 2009-04-22 北京邮电大学 Method, apparatus and base station for balancing load of honeycomb collaboration relay network
CN101959171A (en) * 2010-09-30 2011-01-26 中兴通讯股份有限公司 Neighboring cell configuration information updating method and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1278581C (en) * 2003-05-26 2006-10-04 华为技术有限公司 Method for realizing laminated plot interlayer loading balance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1717092A (en) * 2004-06-29 2006-01-04 中兴通讯股份有限公司 Method for dynamically regulating auxiliary carrier frequency of multiple carrier frequency small village in radio communication system
US20060166677A1 (en) * 2005-01-27 2006-07-27 Lucent Technologies, Inc. Balancing load of cells in inter-frequency handover of wireless communications
CN1941988A (en) * 2005-09-29 2007-04-04 普天信息技术研究院 Method for allocating multiple carrier-frequency domain
CN101080082A (en) * 2006-05-22 2007-11-28 上海贝尔阿尔卡特股份有限公司 Device and method for switching control via joint detection of multiple cell load
CN101119140A (en) * 2006-08-03 2008-02-06 鼎桥通信技术有限公司 A load balancing method and device in a hierarchical cell structure
CN101415207A (en) * 2008-12-04 2009-04-22 北京邮电大学 Method, apparatus and base station for balancing load of honeycomb collaboration relay network
CN101959171A (en) * 2010-09-30 2011-01-26 中兴通讯股份有限公司 Neighboring cell configuration information updating method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102740360A (en) * 2011-04-12 2012-10-17 中兴通讯股份有限公司 Cell load control method and apparatus thereof
CN102740360B (en) * 2011-04-12 2016-08-03 中兴通讯股份有限公司 A kind of cell load control method and device

Also Published As

Publication number Publication date
CN102685776B (en) 2017-03-15
WO2012119461A2 (en) 2012-09-13
WO2012119461A3 (en) 2012-11-01

Similar Documents

Publication Publication Date Title
CN115552931B (en) Method, apparatus and medium for adding per-user equipment control to E2 policy
JP6048694B2 (en) Communication system, base station, and communication method
CN101990261B (en) Mobility state transmission method and system
CN103313324B (en) The object cell selection method of LTE system and eNB
CN102857970B (en) The implementation method and device of a kind of inter-cell load balance
CN102457918A (en) Method and device for determining target cell
EP2622898A1 (en) Method and apparatus for providing measurement reporting to reduce drive testing requirements
JP2013518486A (en) Method and system for reporting additional measurement results
KR20160140857A (en) Method for allocating aggregate maximum bit rate of ue, method for allocating aggregate bit rates of non-gbr services and base stations
CN102740360B (en) A kind of cell load control method and device
US9736717B2 (en) Access method, base station, access point and user equipment
WO2023132359A1 (en) Ran node and method
KR20130140159A (en) Method and apparatus for performing cell reselection
CN102685811A (en) Method and system for transmitting community resource status information under network sharing scene
EP2749067B1 (en) Procedure latency based admission control node, method and system
WO2022027659A1 (en) Load balancing method, and related device and system
KR102051851B1 (en) Apparatus for controlling access of terminal and method thereof
US20210377827A1 (en) Mro for 5g networks
CN104704904B (en) A kind of method and user equipment of selection access network
US9282555B2 (en) Resource control method, device and base station
CN102685776B (en) The method and device that cell load is reduced by CoMP technology
CN105307269A (en) Cell resource state information processing method, cell resource state information processing device and base station
CN103874131A (en) Inter-cell load balance method based on quality of service, device and system
CN116489671A (en) Wireless communication method, device, electronic device and storage medium
CN101389127A (en) Redirection method, system, user equipment and wireless network control unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20200308