TRAFFIC PLANNING IN KUNINGAN CITY CENTER Pratama, Diky Irdianto Pratama; Anwar, Saihul
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1035

Abstract

This research was conducted to improve the performance of service of Siliwangi Road which decreased. The data obtained from the Department of Transportation brass form LHR data brass city, road length, and the average speed of the vehicle, Then in if the degree of saturation of the Road in order to know the success of the New Planning. To facilitate the research and also because it has different problems Siliwangi road for 2 parts cut off by crossing, Siliwangi Street 1 which starts from Cijoho roundabout Until the intersection near Smpn 1 Kuningan has LHR 2563 smp with degree of saturation 0,97 at level Service E and Jalan Siliwangi 2 starting from intersection of Smpn 1 Kuningan Until the junction of Jalan Veteran has LHR 1761 smp with degree of saturation 0,67 level of service C. After in doing traffic engineering level of road service go up, Siliwangi Street 1 become C with degree of saturation 0.57 also Jalan Siliwangi 2 level service C with degree of saturation 0,51.
ANALYSIS OF CINAPEL BRIDGE PROJECT CONSTRUCTION MANAGEMENT ON THE CISUNDAWU TOLL ROAD Pahlawati, Nopa; Rozy, Nikko; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 3 (2019)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i3.2759

Abstract

ABSTRACTConstruction management is an attempt to use limited resources efficiently, effectively and timly in completing a project that has been palnned. There are 3 kinds of basic functions of construction management including planning, implementation, and control. Of three of these activities to control the resources on aproject that includes worker, equipment, material, money, and method.The research method used was qualitative research, as a way of collecting data on the study is how the study of the literature, interviews and direct observation in field. And this method is a method that is done to get a foundation theory in analyzing data, namely the analysis calculation of the volume of material, analysis of labor, analysis tool, method, method of Bar Chart S Curve and Critical Path Method.The location of the studies reviewed were Analysis Of Cinapel Bridge Project Construction Management On The Toll Cisundawu Road, located on Pamatutan Hamlet Mulyasari ? Pasir Hamlet Margamukti, Sumedang. The results of this research is the budget plan costs ?completed the construction of the Cinapel Bridge Project on Cisundawu Toll Road until the final stage costs less than Rp. 168,020,632,320, - and analysis of the Critical Path Method (CPM) estimates that the completion of the Cinapel Bridge on Cisundawu Toll Road takes 129 weeks (903 days)Keywords: Construction Management, Bar Chart, S Curve, Critical Path Method
ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA N.I.S, Septi Dwi; Anwar, Saihul
Journal of Green Science and Technology Vol 2, No 3 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i3.2142

Abstract

Project implementation is said to be optimal if good project management planning so that it can be done efficiently, qualified, safe, and economical. To produce an optimal project management is required with certain methods adjusted by the project. The purpose of this study is to determine the scheduling of project time to be done by using CPM network method (Critical Path Method) which will result in the length of time of completion of the project and determine the start and end time in each work. The first step is to conduct a field survey, collecting project data such as time schedule, and basic theory. After the data collection is considered enough, then the data is determined again with the method of CPM (Critical Path Method), followed by determining how much the cost to be incurred, and then made barchart and curve S. From the research results obtained, for project implementation can be completed with time work plan 282 days or 47 weeks. But with that time there are some critical work that will affect the duration, so special attention is required on the work. And costs incurred as much as Rp 223,363,901,783.98.Keywords : CPM (Critical Path Method), Duration of Work, Project Cost, Barchart, and Curve S
Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project Aghniya, Shilvy; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2387

Abstract

Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally.Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM).Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00.Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).
ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA Maulana, Cepi; Anwar, Saihul
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1286

Abstract

Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans.This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL Hakim, Zaid Al; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2149

Abstract

Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life.Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeksKeyword: Project Management, Bar Chart, S Curve, Critical Path Method
THE ANALYSIS OF HYDROLOGY IN KUPANG RIVER PEKALONGAN – BATANG Anggriani, Esa; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 3 (2019)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i3.2754

Abstract

ABSTRACTKupang River administratively located in Batang Regency, as well as the District and City of Pekalongan, Central Java Province. The Kupang River irrigates the Kupang Watershed with an area are 194.87 Km2 and the river length are 67.5 km. The Kupang watershed is in the administrative area of 3 regencies and 1 city, that are Pekalongan City, then Batang, Pekalongan, and Banjarnegara districts.In general, semi-monthly rainfall ranges between 16 mm until 299 mm. The dry season go on April until September and the rainy season go on October until March.The purpose of this research is to do a calculation and analysis to get the amount of water potential with available data. In terms of quantity, the problem of water for agriculture especially on dry land, is about the water supply and distribution. Because the water supply is very dependent on the distribution of rainfall throughout the year which is very uneven even in the rainy season. Because of that reason the technology and methods that are effective, efficient, and can be applied in various regional characteristics are needed to meet water needs.Flood control is also very necessary to prevent floods that can occur at any time. Flood dischargeplancalculated using several methods that suitable. With this we can minimize the possibility of flooding and be responsive in an effort to minimize the worst possibilities when the floods take place.Keywords:(Analysis, Hydrology, Water Potential, Flood discharge)
ANALYSIS OF THE SALAMDARMA IRRIGATION AREA PERFORMANCE Rochman, Oky Fajar; Anwar, Saihul
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2150

Abstract

Salamdarma weir is located right in the border area of Indramayu and Subang, belongs to administrative area of Anjatan District, Indramayu Regency.? Managed by PT JasaTirta II Section of Patrol.? This irrigation netwoork has a total service area of 35871 Ha, the service area includes Subang District and Indramayu District. The existence of Salamdarma irrigation network has an important role for the farmers especially during dry season to support the crops? growth.In this research to analyze the performance used parameter from Permen No 11/PRT/M/2015 and calculated using Hydrology regulation from KP 01 Irrigation 2013.The analysis result of this research show that 80,9% of structures and 95,1% of canals are in damaged condition with different various level of damage. Based on the calculation and comparison between potential discharge and water requirement, the potential discharge has fulfilled the irrigation water requirement and the comparison. The water requirement is 29890 lt/s and the potential discharge is 64074 lt/s. The human resources in Salamdarma irrigation there is only deficient in the head of branch position of 12%. For POB, PPA, PPS Personel amount has fulfilled the required amount of personel.? The Operation and Maintenance budget in Salamdarma Irrigation is increased at 30,112% between 2016 to 2017.?Keyword : Irrigation, Salamdarma, Performance, Irrigation water requirement.
MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY Rosdiana, Dian Indra; Anwar, Saihul
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1033

Abstract

Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety.This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow.????????? The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.
ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA Jamaludin, Akhmad; Anwar, Saihul; Bukhori, Bukhori
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1288

Abstract

Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods.Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats.This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research.With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549?Keywords???????? :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)
Co-Authors Abdul Wahid Abdur Rahman Ade Wahab Aghniya, Shilvy Agung Prasetyo Agus Gunawan Ahmad Mansubun Zamanudin Ainun Yusri Akbar Winasis Akhmad Jamaludin Aldi Aldi Andi Darmawan Andri Prabowo Anggriani, Esa Arief Firmanto Arief Ridho Syaepullah Arif Kurnia Nugraha Arip Saepudin Aryati Indah Kusumastuti Asep Agung Awliya Tribhuwana Azi Ibrahim Humaidi Baban Sobana Bagas Ramadhan Bukhori Bukhori Bukhori, Bukhori Cepi Maulana Christhoper Anderson Dea Devira Hidayati Deni Setiaji Dennis Bintang Nugroho Diah Utami, Diah Dian Indra Rosdiana Dikdik Nur Fahmi Diky Irdianto Pratama Pratama Dinni Fitri Fadilah Disty Prasanty Eki Danet Pranata Putra Endah Kurniyaningrum Esa Anggriani Fadhilah, Qalya Fadilah, Dinni Fitri Fahmi Arif Rahman Fani Andriani Faozie Novatrianto Faqih Mubarok Amin Faridah Ilmi Firdan Agustiarsyah Fisti Variandini Senjaya Gunawan Gunawan Gunawan Gunawan Hakim, Zaid Al Hamdan Ali Khapid Handri Wildan Fauzi Harry Harpriyanto Heri Mulyono Ikhwanul Fakhri Mu'afa Ikhwanul Fakhri Mu'afa Iko Prasetio Iwan Rudiawan Iyus Imam Jamaludin, Akhmad Jepry Jepry Karim Karim KHUSNUL HOTIMAH Liani Dwi Utari Mahendra, Bobby Maulana, Cepi Mohamad Azhari Muhamad Faisal Firdaus Muhamad Salman Salahuddin Muhammad Lukie Yudhistira Muhammad Yassin Zubair Pratama Mutamakin Mutamakin N.I.S, Septi Dwi Nikko Rozy Nikko Rozy Nopa Pahlawati Nugroho, Dennis Bintang Nurdiyanto Nurdiyanto Nurfatah Alkarim Ohan Farhan Oky Fajar Rochman Osep Saepul Azhar Pahlawati, Nopa Panangian Situmorang Pebi Mahar Ramadhan Prasanty, Disty Prasetio, Iko Pratama, Diky Irdianto Pratama Recky Dwi Permadi Retno Wulansari Ridlo Hafizh Alim Rizal Pikih Pratama Rochman, Oky Fajar Rosdiana, Dian Indra Roza Legawa Saeful Hadi Salman Alparis Septi Dwi N.I.S Shilvy Aghniya Sigit Hidayat Siti Masitoh Suhadi Suhadi Sujarwadi, Jajang Sulaiman Alizulfiqar Sulistijo Edhy Purnomo TATI NURHAYATI Teguh Santoso Tri Rezki Wahyu Azhari Trisno Adi Saputra Wildan Alfian Wisnu Saefuloh Yanto Heryanto Yudha Prigadi Yudi Sutomo Zaid Al Hakim Zaki, M.