OPTIMIZATION OF THE FEASIBILITY OF MICRO HYDRO POWER PLANT (PLTMH) RAMPUSA SUB DISTRICT OF LEMBANG REGENCY PINRANG Sirad, Mochammad Apriyadi Hadi; Aminuddin, Rosihan
Patria Artha Technological Journal Vol 1, No 2 (2017): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (7.612 KB) | DOI: 10.1234/patjou.v1i2.71

Abstract

Economic growth and basic electrical energy pentarifan (TDL) that is determined by the Government and PLN is the thing that most affect the usage/consumption of electrical energy, as in the theory of microeconomics, the demand for a commodity including energy electricity is influenced by various factors, including the following: the requested prices of goods, the prices of other goods, income, tastes and prosperity. The provision of electricity is not only meant as a tool for tackling poverty, but also dimaksdukan for equitable development and advance the villages as a force for the national economy. Therefore to meet the need for electric lighting for remote areas need to be created a tool that can reach remote places that are cheap and environmentally friendly, that micro hydro power plant. This research aims to know the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency pinrang. This research is the research of ex-post-facto that is descriptive. The sample in this research is to look at the technical aspects of PLTMH. As for side input consists of water discharge (Q) effective falls high (H), the State of the generator, turbine, form the type of pipeline and the turbine House (power house). As for the Power output is generated (P), Village PLTMH rampusadan load Protection installed.The result of the research of the optimization of the feasibility of Micro Hydro power plant Rampusa sub district of Lembang Regency Pinrang, with discharge water 0.17 m3/sec, 23 m high waterfall with a power generator with a capacity of kW 26.04 20 kVA, kVA 32.55 should use by using different types of crossflow turbine the turbine type France should use, type of PVC pipe 12 "which is above the soil surface that is supposed to be planted in the ground, a burdens attached 23980 VA and cable distribution is used. So a descriptive analysis of the results showed that PLTMH rampusa Village sub district of Lembang Regency Pinrang not feasible from a technical point. 
Keandalan Jaringan Distribusi Primer 20KV Pada PT. PLN (Persero) Wilayah Maluku Dan Maluku Utara Cabang Ternate Sirad, Mochammad Apriyadi Hadi
Patria Artha Technological Journal Vol 1, No 1 (2017): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.1234/patjou.v1i1.35

Abstract

Pelayanan dalam penyediaan tenaga listrik bagi masyarakat (Kota Ternate) merupakan hal yang sangat penting, maka hal-hal yang dapat mempengaruhi keandalan saluran distribusi perlu diperhitungkan.Gangguan-gangguan yang terjadi pada jaringan distribusi di Pulau Ternate banyak berupa gangguan permanen, gangguan temporer, gangguan fasa RST sesaat, gangguan fasa ST sesaat, gangguan RS sesaat, dan Black Out (BO), yang menyebabkan kontinuitas pelayanan saluran terganggu sampai gangguan tersebut dapat dipulihkan kembali. Dari data banyaknya gangguan /pemadaman dan data lamanya gangguan/pemadaman yang diperoleh dari hasil penelitian di PT.PLN (Persero) Wilayah Maluku dan Maluku Utara Cabang Ternate untuk, maka dapat diketahui dari data yang ada bahwa banyaknya gangguan dan lamanya gangguan tersebut terjadi serta mempunyai tingkat gangguan paling tinggi terdapat pada feeder Jambula sebanyak 452 kali gangguan dan total waktunya 48120 menit, feeder Sulamadaha sebanyak 255 kali gangguan dan total waktunya 17310 menit, feeder Stadion sebanyak 208 kali gangguan dan total waktunya 15360 menit, feeder Pelabuhan sebanyak 206 kali gangguan dan total waktunya 15919 menit dan yang paling rendah terdapat pada feeder Kota sebanyak 121 kali gangguan dan total waktunya 6833 menit. Nilai indeks SAIFI yang ditargetkan sebesar 17,1 pada Jaringan Distribusi Primer 20 kV memenuhi target.Nilai indeks SAIDI yang ditargetkan sebesar 2,6 menunjukan bahwa dari ke lima feeder hanya satu feeder yang memenuhi target yaitu feeder Kota. Nilai indeks Ketersediaan (ASAI) memiliki nilai lebih besar daripada nilai ketidaktersediaan (ASUI) yang mencapai 0,99. Hal ini menandakan Ketersediaan daya masih tercukupi. Nilai Indeks Keandalan dalam kurun waktu 1 tahun pada umumnya kurang baik
OPTIMASI KINERJA JARINGAN TRANSMISI 150 KV MENGGUNAKAN SIMULASI GEOGRAPHIC INFORMATION SYSTEM AKIBAT BACK FLASHOVER PADA PLTU JENEPONTO Sirad, Mochammad Apriyadi Hadi; Taha, Syamsumarlin
Patria Artha Technological Journal Vol 2, No 2 (2018): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (7.612 KB) | DOI: 10.33857/patjou

Abstract

Penelitian ini membahas geographic information system merupakan suatu sistem berbasis komputer yang yang digunakan untuk memanipulasi serta menyimpan informasi geografis yang  dapat  dianalisa  berdasarkan  lokasi suatu objek  untuk  kepentingan   tertentu. Pemetaan geographic information system Jaringan Transmisi 150 kV merupakan salah satu penerapan GIS yang berfungsi untuk mengetahui lokasi  Tower Transmisi, kapasitas, rasio  trafo  dan resistansi pentanahan di sepanjang jaringan transmisi PLTU JENEPONTO PT. PLN (Persero). Sistem ini menggunakan Quantum GIS version 3.2.3 dalam proses pembuatan peta digitalisasi yang menggunakan metode pengembangan titik koordinat. Dengan adanya GIS pemetaan jaringan transmisi 150 kV yang disajikan dalam bentuk data informasi yang akan  membantu dan mempermudah  pihak  PT PLN (Persero) untuk mendapatkan informasi lokasi tower transmisi, kapasitas, rasio  trafo  dan resistansi pentanahan yang tinggi sehingga penanganan kinerja dari jaringan transmisi dapat minimalisir terjadi gangguan back flash over yang lebih besar sehingga tidak berujung ke black out pada sistem dan membantu dalam mengelola dan memperbaharui data sistem kelistrikan SULSELRABAR sehingga penyampaian informasi menjadi lebih efektif.
IMPLEMENTASI SISTEM PENGONTROLAN SMART PARKING MENGGUNAKAN MIKROKONTROLER ARDUINO UNO DI UNIVERSITAS PATRIA ARTHA Aminuddin, Rosihan; Rais, Muhammad; Sirad, Mochammad Apriyadi Hadi
Patria Artha Technological Journal Vol 2, No 2 (2018): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (7.612 KB) | DOI: 10.33857/patjou

Abstract

Sistem parkir mobil yang digunakan saat ini khususnya pada Universitas Patria Artha masih menggunakan sistem parkir yang bersifat manual, dalam pengertian jika ingin parkir kendaraan harus melewati pos satpam dan menggunakan tenaga manusia untuk membuka palang parkir yang berada di area kampus. Dengan sistem manual tersebut tentunya menyebabkan beberapa kendala baik bagi petugas maupun bagi para pengendara yang akan memakirkan kendaraannya. Sistem smart parking ini dirancang dengan menggunakan sensor ultrasonik yang diletakan pintu di masuk dan keluar kampus, Tujuan dari penggunaan sensor tersebut tentunya sebagai alat yang memberikan data masukan kepada arduino uno sebagai pengolah data yang selanjutnya diproses dengan hasil keluaran sebuah instruksi kepada motor servo dan juga tampilnya suatu informasi melalui sebuah layar LCD yang menunjukan keterangan mengenai jumlah kendaraan yang parkir.  
INVENTORY INFORMATION SYSTEM OF GOODS USING CODEIGNITER FRAMEWORK Azis, Muhammad Rais; Hadi Sirad, Mochammad Apriyadi
Patria Artha Technological Journal Vol 3, No 1 (2019): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (7.612 KB) | DOI: 10.33857/patj.v3i1.228

Abstract

This type of research is experimental, namely by designing, manufacturing and testing the system model. This inventory information system aims to manage inventory data, incoming goods data and item data out at the real store. The testing method on this system uses black box testing which aims to find out functions that do not work well or errors from a system. From the results of testing on the modules in this system, namely logins, units, goods, incoming goods, outgoing goods, incoming goods and reports of outgoing goods can function properly. The inventory system that has been built can help a true store in terms of managing goods data, incoming goods data and outgoing item data
Rancang Bangun Sistem Parkir Dengan Menggunakan Fingerprint Agustiawan, Agustiawan; Hendrawan, Beni; Hadi Sirad, Mochammad Apriyadi
Patria Artha Technological Journal Vol 4, No 2 (2020): Patria Artha Technological Journal
Publisher : Department of Electrical Engineering, University of Patria Artha

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33857/patj.v4i2.378

Abstract

Saat ini lahan parkir untuk kendaraan sudah menjadi kebutuhan masyarakat, sehingga banyak pengelola parkir menerapkan berbagai sistem demi kenyamanan dan keaamanan pengguna, Salah satu Teknologi yang diterapkan pada sistem parkir adalah menggunakan Radio Frequency Identification (RFID). Namun pada penggunaan RFID sebagai akses rentan hilang dan lupa. Oleh karena itu Penelitian ini menerapkan  Fingerprint/Sensor Sidik Jari sebagai akses untuk keluar parkir, sedangkan untuk masukannya menggunakan push button. Sistem ini bekerja dengan scanner sidik jari pengendara yang tersimpan di sensor Fingerprint dan  data tersebut diolah pada Mikrokontroler kemudian memerintahkan motor penggerak palang parkir untuk membuka. Saat melakukan pengujian alat dapat bekerja sesuai dengan yang diinginkan dengan tingkat akurasi sensor Fingerprint 90%.
Analysis of the Potential of Renewable Energy in South Sulawesi as Power Electrical Needs Mochammad Apriyadi Hadi Sirad
Journal of Electrical Technology UMY Vol 1, No 4 (2017)
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jet.1426

Abstract

Abstract - The use of electric energy in Indonesia continue to experience the increase, especially in South Sulawesi. Electric power demand will grow by achieving average 6.5% per year until the year 2022. In this case the researchers refer to the law 30 of 2007 about energy. Renewable energy potential which exists in South Sulawesi very potential so that needs to be held for research potential. This study was carried out in several districts with priority the potential of renewable energy sources is micro hydro energy, solar energy. Research results show that the potential of renewable energy, solar energy has the greatest potential, namely Sun shines of 337 mwe, with the highest temperature i.e. 95.5 ° c, Ph = 8-9 that is located in the Selayar potentially to develop solar power plant where the average energy of the solar electricity produced amounted to 2,450 units.   
Aplikasi Point OF Sales Menggunakan Framework Laravel Tamus Bin Tahir; Muh Rais; Moch Apriyadi Hadi Sirad
JIKO (Jurnal Informatika dan Komputer) Vol 2, No 2 (2019)
Publisher : Journal Of Informatics and Computer

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (531.711 KB) | DOI: 10.33387/jiko.v2i2.1313

Abstract

Di tahun 2019, toko Galaxy Cell  mengalami kesulitan dalam mengolah data barang, pembelian, penjualan dan pembuatan laporan yang mana masih dilakukan secara manual. Hal ini dikarenakan semakin berkembangnya toko tersebut, sehingga transaksi yang dilakukan pun semakin banyak. Dibutuhkan sebuah aplikasi yang membantu toko Galaxy Cell dalam manajemen data tersebut. Point Of Sale merupakan aplikasi yang memanajemen proses transaksi dan laporan. Framemork Laravel dipilih untuk membangun aplikasi ini dikarenakan Laravel memiliki library yang banyak sehingga dapat mempercepat proses pembuatan sebuah aplikasi. Dari hasil pengujian system yang dilakukan dengan menggunakan metode black box, keselurah system dapat berfungsi dengan baik.Kata kunci: aplikasi, point of sale, laravel 
Sosialisasi Penggunaan Listrik Tenaga Surya Di kecamatan Ternate Tengah M. Yunus Hi Abbas; Hafid Saifudin; Rintania E. Nuryaningsih; Mochammad Apriyadi Hadi Sirad
Journal Of Khairun Community Services Vol 2, No 1 (2022): Journal Of Khairun Community Services
Publisher : Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/jkc.v2i1.4459

Abstract

Berdasarkan Rencana Umum Energi Nasional (RUEN), kontribusi energi terbarukan dalam bauran energi nasional ditargetkan sebesar 23% di tahun 2025 dan meningkat menjadi 31% pada tahun 2050. Proses transisi energi ini dilakukan oleh pemerintah sebagai upaya untuk mengurangi ketergantungan pada energi fosil yang ketersediannya diperkirakan semakin berkurang serta untuk mengurangi dampak dari emisi Gas Rumah Kaca (GRK) yang berakibat langsung terhadap intensitas perubahan iklim, dengan melakukan perubahan secara gradual melalui investasi energi terbarukan di sektor pembangkit listrik.Pada sektor kelistrikan, target RUEN yang ingin dicapai yaitu kontribusi energi terbarukan sebagai pembangkit listrik sebesar 45 GW dari total kapasitas terpasang pembangkit listrik nasional yang nilainya mencapai 135 GW pada tahun 2025. Dimana kontribusi pemanfaatan energi matahari ditargetkan sebesar 14% atau 6,5 GW. Untuk mewujudkan target 14% atau 6,5 GW kontribusi energi matahari pada tahun 2025, maka seluruh provinsi di Indonesia mendapatkan porsi untuk mengembangkan Pembangkit Listrik Tenaga Surya (PLTS). Secara empiris, belum maksimalnya pemanfaatan PLTS di Maluku Utara disebabkan oleh masih kurangnya desiminasi, sosialisasi dan edukasi serta faktor regulasi dari pemerintah daerah itu sendiri terkait pemanfaatan teknologi PLTS khususnya PLTS rooftop
ANALISIS DAN SIMULASI TEGANGAN DIP PADA INTERKONEKSI SISTEM KELISTRIKAN 150 KV - PLTMG KASTELA 30 MW Mochammad Apriyadi Hadi Sirad
Journal of Science and Engineering Vol 5, No 1 (2022): Journal Of Science And Engineering (JOSAE)
Publisher : Fakultas Teknik Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/josae.v5i1.4878

Abstract

Berdasarkan hasil simulasi dapat disimpulkan bahwa tegangan dip yang muncul paling besar akibat terjadinya lonjakan beban pada saat interkoneksi awal sistem kelistrikan 150 kV PLTMG Kastela 30 MW.  Tetap tidak berlangsung lama karena dilihat dari hasil simulasi akan kembali normal setelah sistem mulai stabil kembali.