Table 3 In Table 3, coetticients of predictors revealed that change in one unit of sole predictor could cause change in the construction projects implementation, given that all other variables in the model are held constant. Thus, we would expect a decrease of 0.207 in the extent of the construction projects implementation for every one unit increase in lack of bureaucratic quality holding all other predictors stable in the model. In the same way, a decline of 0.207 in the construction projects implementation score for every one unit amplifies in inefficient and effective bureaucracy in Ethiopia. So, the study finalized that the lack of bureaucratic quality was considerably impaired the construction project activities in Ethiopia. The ANOVA outcome provided that the variance among the variables in the model were statistically significant at F-value of 18.66 and P-value of 0.000. Therefore the model was fitted and properly measured factors influenced construction projects implemented in a country. In the same way, the variance in the model wa constant; its mean value was 4.18 and F value was 18.60. Then, from Table 2, it can be observed that the p-value of F statics is statistically considerable, whic means with a p-value of.000, the model is statistically meaningful.