Peterson, 1994 - Google Patents
Design of a bottom impermeable barrier in conjunction with a contaminated site containment structurePeterson, 1994
View PDF- Document ID
- 7621538812423217802
- Author
- Peterson N
- Publication year
External Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Patel | Geotechnical investigations and improvement of ground conditions | |
| EP1015141B1 (en) | In situ construction of containment vault under a radioactive or hazardous waste site | |
| US5980446A (en) | Methods and system for subsurface stabilization using jet grouting | |
| Evans | Vertical cutoff walls | |
| Kazemian et al. | Assessment and comparison of grouting and injection methods in geotechnical engineering | |
| Bell | Methods of treatment of unstable ground | |
| Pearlman | Subsurface containment and monitoring systems: Barriers and beyond | |
| Bhuiyan et al. | An overview of soil improvement through ground grouting | |
| Munfakh | Ground improvement engineering–the state of the US practice: part 1. Methods | |
| Ryan | Slurry cutoff walls: Applications in the control of hazardous wastes | |
| Bruce et al. | Glossary of grouting terminology | |
| Peterson | Design of a bottom impermeable barrier in conjunction with a contaminated site containment structure | |
| KR100384688B1 (en) | Hydrophobic poly-urethane injection method to stop water flow through the crack of the rock bed at the bottom of vertical deep mixing wall | |
| Boyes | USES OF BENTONITE IN CIVIL ENGINEERING. | |
| Cassani et al. | Auxiliary methods technology: Ground reinforcing, ground improving and pre-support technology | |
| Pellegrino et al. | Soil Improvement Technologies for Tunnelling: Selected Case Histories | |
| Abdulrazzaq Azeez et al. | Soil Strengthening by Using Cement and Binders for Concrete Constructions at Mudar Al-Janabi’s school in Kufa | |
| Mathieu et al. | Deep cement mixing solution for underpinning existing construction | |
| Guimond-Barrett et al. | Deep mixing for reinforcement of railway platforms with a spreadable tool | |
| Treat et al. | Feasibility study of tank leakage mitigation using subsurface barriers | |
| Boscardin et al. | Barrier Walls to Contain Contaminated Soils | |
| Cross | The application of geotechnical engineering techniques for the prevention and control of pollution | |
| Ikuta et al. | Development and Application of Ground Improvement Machinery Chain Conveyor Cutter | |
| Bruce et al. | A First for Kidd Creek | |
| Riggsbee et al. | Review of potential subsurface permeable barrier emplacement and monitoring technologies |