Franco et al., 2024 - Google Patents

A Comprehensive feasibility study of a production technique to lift extra-heavy, high-viscosity oil with an esp system demonstrates improvement of flow assurance and …

Franco et al., 2024

Document ID
570174883727676639
Author
Franco E
Cardenas N
Leon F
Rivadeneira J
Ortiz J
Gomez E
Huaca A
Guerreo X
Carrera J
Izurieta F
Arias E
Preciado F
Publication year
Publication venue
SPE Annual Technical Conference and Exhibition?

External Links

Snippet

An Ecuadorian oil company recorded multiple early failures of electric submersible pumps (ESP) due to harsh fluid conditions. The extra-heavy (9° API) and high-viscosity (10,000) oil at surface stopped production from a new promising reservoir with approximately 400 million …
Continue reading at onepetro.org (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives used in the borehole
    • E21B4/02Fluid rotary type drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives used in the borehole
    • E21B4/04Electric drives
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells

Similar Documents

Publication Publication Date Title
Fleshman et al. Artificial lift for high-volume production
Ahmad et al. Rejuvenating a High GOR, Light Oil Reservoir Using AICD Completion Technology for Gas Control
Franco et al. A Comprehensive feasibility study of a production technique to lift extra-heavy, high-viscosity oil with an esp system demonstrates improvement of flow assurance and oil production
Romer et al. Offshore ESP selection criteria: An industry study
Kazakbayeva et al. Successful implementation of managed pressure drilling and managed pressure cementing techniques in fractured carbonate formation prone to total lost circulation in Far North Region
Vielma et al. Dynamic Modelling for Well Design, Increasing Operational Margins in Challenging Fields
Kommaraju et al. Permanent Magnet Motor-Hydraulically Regulated-PCP PMM-HR-PCP: An Innovative Artificial Lift System for Horizontal and Deviated Wells Producing High Viscous Oil with Gas & Sand
Salim et al. Simulation of liquid unloading from a gas well with coiled tubing using a transient software
Fallah An advanced hydraulic-thermal model for drilling & control of geothermal wells
Bruijnen et al. How to diagnose and solve a tripping ESP caused by multiphase flow behavior in a horizontal well
Mantecon The virtual well: Guidelines for the application of dynamic simulation to optimize well operations, life cycle design, and production
Reid et al. Pump-Friendly Wellbore Design and Case Study from Mississippian Play of Oklahoma/Kansas
Kumar et al. Successful integrated production optimisation from multi-zone infill wells utilising first application of electrical inflow control valve ICV in D-Field, offshore Malaysia
Nguyen et al. Application of Multizone Water Injection Downhole Flow Control Completions with Fibre-Optic Surveillance in Soft Sand Reservoirs
Theuveny et al. Contingency Management During Clean-Up Operations in Deep Water Environments
Mykytiw et al. Practical Use of a Multiphase Flow Simulator for Underbalanced Drilling Applications Design–the Tricks of the Trade
Uvarov Usage of two-sided motors as a part of the simultaneous separate operation technology
Kherroubi et al. Application of Autonomous Inflow Control Valve (AICV) Technology to Enhance Oil Production and Reduce Unwanted Water Production: Case Studies
Dunn et al. Piloting a Cohelical-Axial Multiphase ESP Design in a Sandstone Reservoir Where Rod Pumping Failed
Bakar et al. The First 7-in. Single-Trip Multizone STMZ Gravel Pack Completion Best Practices and Lessons Learned in Malaysia Offshore
Al Manthari et al. Optimizing Well Performance: Leveraging Flow Back Loops for Packer Removal Assessment
Ramkhalawan et al. ESPCP-an economic artificial lift method for an offshore field in Southwest Trinidad
Mogollon et al. Lessons Learned from Extending Run Life for Hundreds of ESPs in a Heavy Oil Environment
Alsayedali et al. Procedures in Unlocking ESP Full Potential and Extending the Run-Life in High Gas-Oil-Ratio Wells
Glaser et al. Multilateral technology with intelligent completions: Challenges and solutions for deepwater subsea well operators