Loomis et al., 1997 - Google Patents
Acid Pit Stabilization Project (Volume 1-Cold Testing) and (Volume 2-Hot Testing)Loomis et al., 1997
View PDF- Document ID
- 16474363593694023478
- Author
- Loomis G
- Zdinak A
- Ewanic M
- Jessmore J
- Publication year
External Links
Snippet
During the summer and fall of Fiscal Year 1997, a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Treatability Study was performed at the Idaho National Engineering and Environmental Laboratory. The study involved …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2273897C (en) | In situ construction of containment vault under a radioactive or hazardous waste site | |
| US7114880B2 (en) | Process for the excavation of buried waste | |
| US5860907A (en) | Method for in situ remediation of waste through multi-point injection | |
| Pearlman | Subsurface containment and monitoring systems: Barriers and beyond | |
| Loomis et al. | Acid Pit Stabilization Project (Volume 1-Cold Testing) and (Volume 2-Hot Testing) | |
| Stare et al. | Contemporary drilling and grouting methods | |
| Gerber et al. | In Situ Remediation Integrated Program: Evaluation and Assessment of Containment Technology | |
| Davidson et al. | Design and construction of a plastic concrete cutoff wall for the Island Copper Mine | |
| Treat et al. | Feasibility study of tank leakage mitigation using subsurface barriers | |
| Aldridge et al. | In situ mixing of dry and slurried reagents in soil and sludge using shallow soil mixing | |
| Batista | A case study on the performance of embankments on treated soft ground | |
| WO2026085502A1 (en) | Delivery methods and processes for encapsulating waste in situ | |
| Carrillo-Sheridan et al. | Passive NAPL Barrier Design and Construction | |
| Thompson | Innovative Grout/Retrieval Demonstration Final Report | |
| Thompson et al. | Wonderwall | |
| Loomis et al. | In-Situ Grouting Treatability Study for the Idaho National Engineering and Environmental Laboratory Subsurface Disposal Area-Transuranic Pits and Trenches | |
| Riggsbee et al. | Review of potential subsurface permeable barrier emplacement and monitoring technologies | |
| Yang et al. | Mix-in-place technologies | |
| Bell et al. | Quality Control of Slurry Cutoff Wall Installations | |
| Bennett et al. | Recommendations to the NRC for Soil Cover Systems Over Uranium Mill Tailings and Low-Level Radioactive Wastes: Construction Methods and Guidance for Sealing Penetrations in Soil Covers (Vol. 3) | |
| Owens | Seismic Evaluation, Soil-Cement Mix Wall and Outlet Pipe Installation, Ivins Bench Dam, Utah | |
| DnHmlfd | Rocky Mountain Arsenal Information Center Commerq&City, Colorado | |
| Collier et al. | The Design and Construction of a Secure Landfill for the Storage of Hazardous and Long Life Chemical Wastes at New Plymouth | |
| Katsukura et al. | Mix-in-place technologies | |
| Dmitriev et al. | Characteristics of organization and execution of groundwater protection for elimination of failure consequences at the chernobyl nuclear power plant |