TWM341064U - Spacer strip structure for pebble washing operation - Google Patents

Spacer strip structure for pebble washing operation Download PDF

Info

Publication number
TWM341064U
TWM341064U TW97205680U TW97205680U TWM341064U TW M341064 U TWM341064 U TW M341064U TW 97205680 U TW97205680 U TW 97205680U TW 97205680 U TW97205680 U TW 97205680U TW M341064 U TWM341064 U TW M341064U
Authority
TW
Taiwan
Prior art keywords
stone
groove
spacer
spacer body
construction
Prior art date
Application number
TW97205680U
Other languages
Chinese (zh)
Inventor
Hong-Tu Wu
Original Assignee
Hong-Tu Wu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hong-Tu Wu filed Critical Hong-Tu Wu
Priority to TW97205680U priority Critical patent/TWM341064U/en
Publication of TWM341064U publication Critical patent/TWM341064U/en

Links

Landscapes

  • Finishing Walls (AREA)

Description

M341064 八、新型說明: 【新型所屬之技術領域j 本創作係有關於一藉冰石本# 是指-種於隔條本體a槽卡吉 作所產生之峨積於溝槽内二 洗石子施工狀隔條結構。 、&工而加速作業之 【先前技術】 種,ί中處理之工法有洗石子與抿石子等數 中之洗石子係於細石子與水 牆面或其他素材之表面,在水呢去=择後用鏝刀固者於 洗,使細石子微露表面之用以細:: 面水泥,使細^γ/表:處理^海料水輕輕抹去表 工抿石子工法,請參照第六圖所示,該 =糸在建桌物水泥粉刷打底後,於建築物上標出中心點 將木條⑵依照水平、垂直基準線,並 =及f私物傾人木條⑵簡叙格子内而形成 面=if木條⑵係埋設固定於木條⑵二侧之石子 面I二石子工作時再視需要將木條⑵自石子 面(3)中移除。 然而’上述之洗石子與抿石子工法在實際使用的時候 會有下列之缺失: 1·上述之洗石子與抿石子卫法在卫作中往往必須先將木 條自石子面中移除’但由於木條係埋設固定於石子面 M341064 中,導致於移除作業之困難。 2·上述之洗石子與抿石子工法在木條自石子面中移除之 後,將在石子面留下格子狀之縫隙,使得工作所產^之 渣滓等容易累積於缝隙中而難以清理,造成施工上之困 擾。 【新型内容】M341064 VIII, new description: [New type of technology field j This creation department has a description of a borrowing ice stone ## refers to the kind of shovel in the groove Spacer structure. [Pre-technical] for speeding up work, and the method of processing in ί is to wash the stone in the number of stone and stone, etc. on the surface of the stone and water wall or other materials. After the selection, use the trowel to clean the surface, so that the fine stone surface is used for fine:: Face cement, make fine ^ γ / table: treatment ^ sea water gently wipe off the table 抿 stone sub-work, please refer to In the six figures, the = 糸 after the foundation of the building material is painted, the center point is marked on the building, and the wooden strip (2) is in accordance with the horizontal and vertical reference lines, and = and f private objects are poured into the wooden strip (2). The forming surface =if wood strip (2) is embedded in the stone surface I of the two sides of the wooden strip (2). When the work is done, the wooden strip (2) is removed from the stone surface (3). However, the above-mentioned washed stone and meteorite sub-work methods will have the following shortcomings in actual use: 1. The above-mentioned washed stone and sapphire method often have to remove the wooden strip from the stone face in the work. Since the wood strip is embedded in the stone face M341064, it is difficult to remove the work. 2. The above-mentioned washing stone and pebbles sub-work method will leave a grid-like gap in the stone surface after the wood strip is removed from the stone surface, so that the residue produced by the work is easily accumulated in the gap and is difficult to clean, resulting in Trouble in construction. [New content]

是故,本創作鑑於上述之缺點,以提供一種洗石子施 工用之隔條結構,該隔條結構係於隔條本體之前端面形成 有溝槽,溝槽卡固有蓋板,可避免洗石子工作所產生之涪 滓堆積於溝槽内,待洗石子工作完畢之後,使用者可輕^ 的將蓋板自溝槽卸除,以達到便於施工而加速作業之^ 效0 不創作&况石于施工用之隔條結構較佳實施例的特 徵在於’其主要係具有-隔條本體,隔條本 二 侧分別沿著周緣延伸形成有-凸緣,且隔條本體之前㈣ 形成有-溝槽^槽之開口處卡固有—蓋板,以封閉隔條 本體前端面之溝槽’於洗石子施卫時係 工製造關設成格子狀後以純錢㈣定,^體 侧之凸緣係埋設於隔條本體二側之 k 工作完畢再將隔條本體之蓋板自涛槽纟®中’待洗石子 【實施方式】 *^除 創作目的及其達成之 詳細說明之,並請一 為令本創作所運用之技術内容、 功效有更完整且清楚的揭露,茲於下 併參閱所揭之圖式及圖號: 首先’請參照第一圖所示,本舍 隔條結構係具有-隔條本體⑴,㉟之洗石子施工用之 ⑹條本體(1)後端面之二 6 M341064 侧分別沿著周緣延伸形成有一凸緣(11),且隔條本體(1) 之前端面形成有一溝槽(12),溝槽(12)之開口處卡固有一 蓋板(13),以封閉隔條本體(1)前端面之溝槽(12),以避 免溝槽(12)於洗石子施工時受到污染。 於實施使用時,請參閱第二圖〜第五圖Therefore, in view of the above-mentioned shortcomings, the present invention provides a spacer structure for washing stone construction, the spacer structure is formed with a groove on the front end surface of the spacer body, and the groove card has an inherent cover plate to avoid the work of washing stones. The generated sputum is accumulated in the groove, and after the stone washing work is completed, the user can lightly remove the cover plate from the groove to achieve the convenience of construction and accelerate the operation. 0 No creation & The preferred embodiment of the spacer structure for construction is characterized in that it mainly has a spacer body, and the two sides of the spacer are respectively formed with a flange along the circumference, and the spacer body is formed with a groove before (4). The groove of the groove is intrinsically-covered to close the groove on the front end of the body of the spacer. When the stone is repaired, it is made into a grid shape and then fixed in pure money (4). The flange on the body side is embedded in After the work on both sides of the spacer body is completed, the cover of the spacer body is removed from the shovel 纟®. [Implementation] *^ In addition to the purpose of creation and the detailed description thereof, please The technical content and efficacy of the creation Complete and clear disclosure, please refer to the drawings and drawings below: First, please refer to the first figure, the structure of the partition has a spacer body (1), 35 for the construction of stone washing (6) The second body of the strip body (1) has a flange (11) extending along the circumference of the two sides, and a groove (12) is formed on the front end surface of the spacer body (1), and the opening of the groove (12) is formed. The card has a cover plate (13) to close the groove (12) of the front end surface of the spacer body (1) to prevent the groove (12) from being contaminated during the construction of the stone. For implementation, please refer to the second figure to the fifth figure.

本體(1)依照施工製造圖鋪設成格子狀後以純水泥漿固 定,且隔條本體(1)二側之凸緣(11)係埋設於隔條本體(1) 一侧之水泥面中’而隔條本體(1)之蓋板(13 )係與水泥面 切齊,並將石粒及水泥以2 : 1之混合比例乾拌後加適量 清水而成適當稠度之水泥混合物,且將該水泥混合物傾入 隔條本體(1)所隔成之格子内後,以較重之石滾或金屬滾 筒滾壓密實,直至多餘之水泥及水份擠出為止,並以鏝刀 拍壓該洗石子面使與隔條本體(1)之蓋板(丨3)齊平,該洗 石子面應露出大部分之石粒並應均勻分布,待所有洗石子 面凝固半乾後,再用清水將表面沖洗清除一些水泥而令石 粒裸露附著於表面,且由於隔條本體(1)之溝槽(12)&口 處卡固有蓋板(13),玎避免洗石子工作所產生之渣滓二S 於隔條本體(1)之溝槽(12)内,待洗石子工作完畢之後二 即可將隔條本體(1)之蓋板(13)自溝槽(12)之開口處告 除’以達到便於施工而加速作業之功效。 P 構相件組1實施說明可知,本創作與現有結 構相k之下,本創作具有以下之優點: 1·本創作之隔條本體係先鋪設成格子狀,以 後續施工,且由於隔條本體之溝槽開口處卡^^之 =免洗石子工作所產生之渣滓堆積於隔條本體之溝 M341064 2.本創作之隔條本體僅係將蓋板卡固於溝槽,待洗石子工 作完畢之後,使用者可輕鬆的將蓋板自溝槽卸除,以達 到便於施工而加速作業之功效。 綜上所述,本創作實施例確能達到所預期之使用功 效,又其所揭露之具體構造,不僅未曾見諸於同類產品 中,亦未曾公開於申請前,誠已完全符合專利法之規定與 要求,爰依法提出新型專利之申請,懇請惠予審查,並賜 准專利,則實感德便。 M341064 【圖式簡單說明】 第一圖:本創作之結構立體圖 第二圖:本創作之蓋板卸除前狀態立體圖 第三圖:本創作之蓋板卸除前狀態側視剖視圖 第四圖:本創作之蓋板卸除後狀態立體圖 第五圖:本創作之蓋板卸除後狀態側視剖視圖 弟六圖·現有之侧視剖視圖 【主要元件符號說明】 <本創作 > (1) 隔條本體 (11) 凸緣 (12) 溝槽 (13) 蓋板 <現 有 > (2) 木條 (3) 石子面The body (1) is laid in a lattice shape according to the construction drawing, and then fixed by pure cement slurry, and the flanges (11) on both sides of the spacer body (1) are embedded in the cement surface on one side of the spacer body (1)' The cover plate (13) of the spacer body (1) is flush with the cement surface, and the stone particles and the cement are dry-mixed in a mixing ratio of 2:1, and then an appropriate amount of water is added to form a cement mixture of a suitable consistency, and the cement mixture is After the cement mixture is poured into the grid separated by the partition body (1), it is rolled and compacted with a heavier stone roll or a metal drum until the excess cement and water are squeezed out, and the washing is performed with a file. The stone surface is flush with the cover plate (丨3) of the spacer body (1). The stone surface should be exposed to most of the stone particles and should be evenly distributed. After all the stone surface has been solidified and dried, the water will be treated with water. The surface is rinsed to remove some cement and the stone is barely attached to the surface, and due to the groove (12) & the groove at the mouth of the spacer body (1), the inherent cover plate (13) is used to avoid the residue generated by the washing work. S in the groove (12) of the spacer body (1), after the stone is finished working, the spacer body can be (1) The cover plate (13) is removed from the opening of the groove (12) to achieve the effect of facilitating construction and accelerating the operation. The implementation of the P-phase component group 1 shows that the creation has the following advantages under the existing structure: 1. The spacer system of the creation is laid in a lattice shape for subsequent construction, and due to the spacer The groove opening of the body is ^^= The dross generated by the work of the disposable stone is deposited on the groove of the spacer body M341064. 2. The spacer body of the present invention only fixes the cover plate in the groove, and the stone is to be washed. After the completion, the user can easily remove the cover from the groove to achieve the effect of facilitating construction and accelerating the operation. In summary, the present embodiment can achieve the expected use efficiency, and the specific structure disclosed therein has not been seen in similar products, nor has it been disclosed before the application, and has fully complied with the provisions of the Patent Law. And the request, the application for a new type of patent in accordance with the law, please forgive the review, and grant the patent, it is really sensible. M341064 [Simple description of the diagram] The first picture: the perspective view of the structure of the creation. The second picture: the perspective view of the front cover of the creation. The third picture: The front view of the cover of the creation is removed. The third view of the state of the cover after the cover is removed: the side view of the cover after the creation of the cover is removed from the side view of the six-figure view of the existing side view [the main component symbol description] <this creation> (1) Spacer body (11) Flange (12) Groove (13) Cover <Existing> (2) Wood strip (3) Stone surface

Claims (1)

M341064 九、申請專利範圍: 一種洗石子施工用之隔條結構,係具有隔條本體,隔 條本體之二侧分別形成有凸緣,且隔條本體之前端面形成 有溝槽,溝槽卡固有蓋板以封閉溝槽,於洗石子施工時係 將隔條本體鋪設成格子狀,且各隔條本體二侧之凸緣係埋 設於洗石子面中’待洗石子工作完畢時,將各隔條本體之 ' 蓋板自溝槽卸除。 10M341064 IX. Patent application scope: A spacer structure for washing stone construction, which has a spacer body. The two sides of the spacer body are respectively formed with flanges, and the front end surface of the spacer body is formed with a groove, and the groove card is inherent The cover plate is closed to the groove, and the partition body is laid in a lattice shape during the construction of the stone washing, and the flanges on the two sides of each of the spacer bodies are embedded in the surface of the stone to be washed. The 'body cover' is removed from the groove. 10
TW97205680U 2008-04-02 2008-04-02 Spacer strip structure for pebble washing operation TWM341064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW97205680U TWM341064U (en) 2008-04-02 2008-04-02 Spacer strip structure for pebble washing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW97205680U TWM341064U (en) 2008-04-02 2008-04-02 Spacer strip structure for pebble washing operation

Publications (1)

Publication Number Publication Date
TWM341064U true TWM341064U (en) 2008-09-21

Family

ID=44333815

Family Applications (1)

Application Number Title Priority Date Filing Date
TW97205680U TWM341064U (en) 2008-04-02 2008-04-02 Spacer strip structure for pebble washing operation

Country Status (1)

Country Link
TW (1) TWM341064U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI860953B (en) * 2024-03-18 2024-11-01 吳鴻圖 Stone washing construction strip

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI860953B (en) * 2024-03-18 2024-11-01 吳鴻圖 Stone washing construction strip

Similar Documents

Publication Publication Date Title
JP2018150792A (en) Concrete finishing method
TWM341064U (en) Spacer strip structure for pebble washing operation
CN106894632A (en) A kind of constructional column dustpan feeding mouth concrete removal method
CN108193862A (en) Building wall plastering construction method
CN101818530A (en) Regenerative masonry wall system and construction method thereof
CN201581323U (en) A sidewalk paving brick made of construction waste
CN201818048U (en) Disposable formwork for building construction
JP6301539B1 (en) Concrete construction method
CN113802786B (en) A kind of water-brushed stone wall construction technology
CN212405769U (en) Anti-slip large-gradient decorative surface layer structure
CN206736662U (en) A kind of job site pin-connected panel precast concrete temporary road
CN116556720A (en) Construction method for repairing historic building raking stone wall
CN219864130U (en) A kind of concrete shoveling device
DE202010015781U1 (en) Wash-concrete contact retarder for concrete formwork with film-forming separation function
CN205771380U (en) One pours uses emission of baiting chute
CN204510237U (en) A kind of diaphragm capsule of graininess impervious material of mating formation
TWI860953B (en) Stone washing construction strip
CN204491637U (en) A kind of mould of graininess impervious material of mating formation
CN105345624B (en) A kind of false bracket milling drum
CN204585490U (en) Combed combination steel wall body limit mould
CN201567676U (en) Hollow block for construction made of construction waste
CN203546760U (en) Waterproof structure of horizontal construction joint of concrete of basement
JP2917835B2 (en) Concrete splicing method
JP2018150701A (en) Concrete construction method
CN207256474U (en) A kind of prefabricated component receives face device

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees