- Publication number
- DE3241288A1 DE3241288A1 DE19823241288 DE3241288A DE3241288A1 DE 3241288 A1 DE3241288 A1 DE 3241288A1 DE 19823241288 DE19823241288 DE 19823241288 DE 3241288 A DE3241288 A DE 3241288A DE 3241288 A1 DE3241288 A1 DE 3241288A1
- Authority
- DE
- Germany
- Prior art keywords
- station
- molding
- pit
- rectangular
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000465 moulding Methods 0.000 title claims description 88
- 238000001816 cooling Methods 0.000 claims description 31
- 239000004576 sand Substances 0.000 claims description 28
- 239000002699 waste material Substances 0.000 claims description 23
- 238000005266 casting Methods 0.000 claims description 18
- 239000003110 molding sand Substances 0.000 claims description 10
- 238000003780 insertion Methods 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims description 8
- 238000003825 pressing Methods 0.000 claims description 8
- 238000012546 transfer Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 238000012549 training Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000013519 translation Methods 0.000 description 2
- 229910001141 Ductile iron Inorganic materials 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C25/00—Foundry moulding plants
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Casting Devices For Molds (AREA)
Description
NER LICHTI 32 A 1NER LICHTI 32 A 1
DR. ING. HANS LICHTI"·: DIRL. "tNC: H Ε.ΓΝ DIPL.-PHYS. DR. JOST LEMPERT PATENTANWÄLTEDR. ING. HANS LICHTI "·: DIRL." TNC: H Ε.ΓΝ DIPL.-PHYS. DR. JOST LEMPERT PATENTANWÄLTE
TELEFON (0721) 48511TELEPHONE (0721) 48511
6580/82 Lj BMD6580/82 ly BMD
Badische Maschinenfabrik °8· N°v*™ber Badische Maschinenfabrik ° 8 · N ° v * ™ ber
DurI ach GmbH
Pf inztalstraße 90DurI ach GmbH
Pf inztalstrasse 90
7500 Karlsruhe 417500 Karlsruhe 41
Gießerei-FormanlageFoundry molding line
Die Erfindung betrifft eine Gießerei-Formanlage mit einer Formmaschine, in der abwechselnd Ober- und Unterkasten einer Kastenform hergestellt werden, einer die Formmaschine einbeziehenden Rechteckbahn, die eine Wendestation für den abgeformten Unterkasten, eine Kerneinlegestrecke , eine Zulegestation für den abgeformten Ober- und Unterkasten, eine Ausdrückstation für die komplette Form und eine Trennstation, von der der leere Unter- und Oberkasten aufeinander folgend der Formmaschine zugeführt werden, aufweist und mit einer Gieß- und Kühlstrecke.The invention relates to a foundry molding plant with a molding machine, made in the alternating upper and lower box of a box shape are, a rectangular path incorporating the molding machine, the one Turning station for the molded lower case, a core insertion line, a loading station for the molded upper and lower box, a pressing station for the complete mold and a separating station, from which the empty lower and upper boxes are fed one after the other to the molding machine are, has and with a pouring and cooling section.
Formanlagen dieses Aufbaus für den Kastenguß sind in vielen Ausführungsformen bekannt. Ihre spezielle Ausbildung und die Anordnung der diversen Arbeitsstationen richtet sich jeweils nach den räumlichen Gegebenheiten und in Einzelfällen auch nach den speziellen gußtechnischen Anforderungen, die an diese Formanlage gestellt werden. Bei Kastenguß ist man insbesondere bestrebt, die Anzahl der in der Anlage umlaufenden Formkasten so gering wie irgend vertretbar zu halten um damit einerseits die KostenMolding systems of this construction for box casting are in many embodiments known. Your special training and the arrangement of the various workstations depends on the spatial conditions and in individual cases also according to the special casting requirements, which are placed on this molding line. In box casting, efforts are particularly made to reduce the number of molding boxes circulating in the system to keep it as low as is justifiable in order to reduce costs on the one hand
der Anlage, andererseits den Transportaufwand für die leeren Formkasten zu senken. Bei der bekannten Anlage (DE-AS 1 962 131) ist eine langgestreckte Rechteckbahn vorgesehen, an deren einen Langseite hintereinander die Trennstation, die Formmaschine, die Kerneinlegestrecke und die Zulegestation angeordnet sind. Von der Zulegestation gelangen die kompletten Kastenformen über einen Querförderer auf die andere Langseite der Rechteckbahn, die über den Querförderer hinaus verlängert ist. Diese Langseite der Rechteckbahn schließt die Gieß- und Kühlstrecke ein, wobei zwei Plattenbandförderer übereinander angeordnet sind. Jeder Plattenbandförderer weist zwei nebeneinander liegende Plätze auf. Der Bauaufwand an Fördereinrichtungen und der Platzbedarf dieser Formanlage ist beträchtlich.the system, on the other hand the transport costs for the empty molding boxes to lower. In the known system (DE-AS 1 962 131) an elongated rectangular track is provided on one long side one behind the other the cutting station, the molding machine, the core insertion line and the loading station are arranged. The complete box shapes over a cross conveyor to the other long side of the rectangular track, which is extended over the cross conveyor. This long side of the rectangular track includes the casting and cooling section, with two apron belt conveyors being arranged one above the other. Everyone Apron conveyor has two adjacent places. The construction costs of conveyor systems and the space required for this molding system is considerable.
Bei kastenlosen Formen kann der Bauaufwand für die Fördereinrichtungen erheblich gesenkt werden, da der Rücktransport der leeren Formkasten entfällt. Die gleichwohl für die Herstellung der Form erforderlichen Formrahmen können in einem kurzen Kreislauf um die Formmaschine herum geführt und die Form unmittelbar von diesem kurzen Kreislauf auf die Gieß- und Kühlstrecke abgegeben werden. Eine solche Anlage läßt sich also relativ kompakt bauen. Kastenloser Guß jedoch ist nicht in allen Fällen möglich.In the case of boxless forms, the construction costs for the conveyor systems can be significantly reduced, since the empty molding boxes do not have to be returned. The mold frames required for the production of the mold can be guided in a short circuit around the molding machine and the shape is transferred directly from this short circuit to the Casting and cooling sections are released. Such a system can so build relatively compact. However, boxless casting is not possible in all cases.
Der Erfindung liegt die Aufgabe zugrunde, eine Gießerei-Formanlage für den Kastenguß mit dem eingangs geschilderten Aufbau so auszubilden, daß eine platzsparende kompakte Bauweise mit der Möglichkeit einer Anpassung an jeden Anwendungsfail möglich ist und die Herstellungskosten einer solchen Anlage beträchtlich gesenkt werden können.The invention is based on the object of a foundry molding system for to train the cast box with the structure described above so that a space-saving compact design with the possibility of adaptation to every application failure is possible and the manufacturing costs of such Plant can be reduced considerably.
Diese Aufgabe wird gemäß einem ersten Grundgedanken der Erfindung dadurch gelöst, daß an einer Kopfseite der Formanlage, die von einer Schmalseite der Rechteckbahn gebildet ist, die Formmaschine und die Wendestation angeordnet sind, ein in Förderrichtung anschließender längerer Abschnitt der Rechteckbahn die Kerneinlegestrecke, die Zulegestation und die Gießstrecke aufweist, während der dazu parallele, andere längere Abschnitt der Rechteckbahn als Kühlstrecke ausgebildet und bis nahe der Formmaschine zu der Ausdrückstation zurückgeführt ist, von der die Formen auf eine direkt neben dieser Kühlstrecke liegende weitere Kühlstrecke mit entgegengesetzter Förderrichtung gelangen, während die leeren Formkasten mit wiederum hierzu entgegengesetzter Richtung über die Trennstation zur Formmaschine gelangen.This object is achieved according to a first basic idea of the invention in that on a head side of the molding system, which is of a The narrow side of the rectangular path is formed, the molding machine and the turning station are arranged, a subsequent one in the conveying direction longer section of the rectangular track has the core insertion section, the feeding station and the casting section, while the parallel to it, other longer section of the rectangular path is designed as a cooling section and is returned to the press-out station close to the molding machine from which the molds pass to a further cooling line located directly next to this cooling line with an opposite conveying direction, while the empty molding boxes arrive in the opposite direction via the separating station to the molding machine.
Die Gießstrecke und der erste Teil der Kühlstrecke, auf der sich die Formen noch im Formkasten befinden, lassen sich relativ nahe nebeneinander und parallel anordnen, so daß eine schmale Rechteckbahn gegeben ist. Die an der Kopfseite der Anlage angeordnete Schmalseite der Rechteckbahn wird in der Regel etwas breiter sein. In Längsrichtung wird dieser zusätzliche Platzbedarf dadurch sinnvoll genutzt, daß der zweite Teil der Kühlstrecke unmittelbar neben deren erstem Teil angeordnet ist und die Förderrichtung auf diesen beiden Teilen der Kühlstrecke, die über die Ausdrückstation miteinander in Verbindung stehen, einander entgegengesetzt ist, so daß auch die Gesamtlänge der Anlage auf das notwendige Maß beschränkt wird. Andererseits läßt sich die Länge der Kerneinlege- und Gießstrecke , wie auch die Länge der Kühlstrecke ohne Schwierigkeit an stark unterschiedliche Bedarfsfälle anpassen, indem die einzelnen Förderabschnitte entsprechend verkürzt oder verlängert werden. Stets ergibt sich aber eine Formanlage mit geringst möglichem Platzbedarf in Längs- und Querrichtung.The casting line and the first part of the cooling line on which the Molds are still in the molding box, can be arranged relatively close to each other and parallel, so that a narrow rectangular path is given is. The narrow side of the rectangular track arranged at the top of the system will usually be somewhat wider. In the longitudinal direction is This additional space requirement is sensibly used by the fact that the second Part of the cooling section is arranged immediately next to the first part and the conveying direction on these two parts of the cooling section, which over the expressing station are in communication with each other, are opposite to each other, so that the total length of the system to the necessary Measure is limited. On the other hand, the length of the core insert and casting line, as well as the length of the cooling line without difficulty adapt to widely differing needs by adding the individual Funding sections are shortened or lengthened accordingly. However, there is always a molding system with the least possible space requirement in Longitudinal and transverse direction.
Gemäß einer bevorzugten Ausführungsform ist an der Kopfseite der Formanlage auf der Schmalseite der Rechteckbahn unmittelbar vor der Formmaschine die Trennstation für den leeren Formkasten und unmittelbar hinter der Formmaschine und vor der Wendestation eine Sandabstreif- und Trichterbohrstation angeordnet.According to a preferred embodiment, the molding system is on the head side on the narrow side of the rectangular track directly in front of the molding machine, the cutting station for the empty molding box and immediately A sand stripping and funnel drilling station is arranged behind the molding machine and in front of the turning station.
Durch diese Ausbildung werden - mit Ausnahme der Ausdrückstation alle Arbeitsstationen, an denen in größeren Mengen Überschuß- bzw. Abfallsand entsteht, auf die Schmalseite der Rechteckbahn konzentriert, so daß auch nur dort - und an der Ausdrückstation - entsprechende Einrichtungen wie Gruben, und Förderer zur Aufnahme des Abfallsandes notwendig sind.Through this training - with the exception of the pressing station all Workstations where large quantities of excess or waste sand are produced, concentrated on the narrow side of the rectangular track, so that only there - and at the pressing station - appropriate facilities such as pits and conveyors for receiving the waste sand are necessary.
Gemäß einem weiteren Merkmal der Erfindung ist vorgesehen, daß die Schmalseite der Rechteckbahn an der Kopfseite der Formanlage auf einem solch hohen Niveau angeordnet ist, daß die Formmaschine auf Bodenniveau aufgestellt werden kann, und daß die Trennstation auf dieser Schmalseite an der einen Ecke der Rechteckbahn angeordnet und mit einem Trenngerät ausgestattet ist, das anläßlich des Trennens der leeren Formkasten die Differenz zwischen dem Normalniveau der Rechteckbahn und dem erhöhten Niveau an der Schmalseite der Rechteckbahn überwindet, während an der gegenüberliegenden Ecke eine Absenkstation für die abgeformten Ober- und Unterkasten angeordnet ist.According to a further feature of the invention it is provided that the The narrow side of the rectangular track is arranged on the head side of the molding system at such a high level that the molding machine is at floor level can be set up, and that the separation station on this The narrow side is arranged at one corner of the rectangular web and is equipped with a separating device that is used on the occasion of separating the empty molding box is the difference between the normal level of the rectangular path and overcomes the increased level on the narrow side of the rectangular track, while a lowering station on the opposite corner is arranged for the molded upper and lower case.
Auf diese Weise kann die Formmaschine auf normalem Bodenniveau aufgestellt werden, so daß die sonst notwendigen umfänglichen Baumaßnahmen für eine Fundamentgrube entfallen können. Es ist, wie bereits gesagt, lediglich die Grube für den Abfallsand erforderlich, an die jedoch keine besonderen statischen Anforderungen gestellt werden. DieIn this way, the molding machine can be set up at normal floor level so that the extensive construction work otherwise necessary for a foundation pit can be dispensed with. It is like it was before In other words, only the pit for the waste sand is required, but no special static requirements are placed on it. the
Überwindung des Niveauunterschiedes bedarf aufgrund der Anordnung und Ausbildung des Trenngerätes keiner besonderen Hubeinrichtungen, da lediglich der Hub des Trenngerätes entsprechend zu verlängern ist..Overcoming the difference in level requires due to the arrangement and Training of the separator no special lifting devices, there only the stroke of the cutting device needs to be extended accordingly.
Bei dieser Ausführungsform ist ferner mit Vorteil vorgesehen, daß auch der zweite Teil der Kühlstrecke, auf die die ausgedrückten Formen abgegeben werden, auf etwa dem gleichen Niveau angoerdnet ist, wie der an der Kopfseite der Anlage befindliche Abschnitt der Rechteckbahn. Auch hier wird der Niveauunterschied in einfacher Weise durch die Hubbewegung des an der Ausdrückstation angeordneten Gerätes überwunden.In this embodiment it is also advantageously provided that the second part of the cooling section, onto which the expressed shapes are dispensed, is at approximately the same level as that section of the rectangular track located at the top of the system. Here, too, the difference in level is determined in a simple manner by the lifting movement of the device arranged at the press-out station.
Die erfindungsgemäße Ausbildung der Formanlage gibt die Möglichkeit, daß der Abschnitt der Rechteckbahn zwischen der Ausdrückstation über die Trennstation ,die Formmaschine, die Absenkstation bis zur Zulegestation als die Kasten unmittelbar aufnehmende Bordrolfenbahn und der die Gießstrecke und der die abgegossenen Kastenformen aufnehmende Abschnitt der Kühlstrecke bis zur Ausdrückstation als Palettenbahn ausgebildet sind, wobei die Ausdrückstation an der einen Langseite der Rechteckbahn und die Zulegestation an der anderen Langseite einander gegenüberliegen und durch ein Paletten-Übersetzgerät verbunden sind.The inventive design of the molding system gives the possibility that the section of the rectangular path between the expressing station via the separating station, the molding machine, the lowering station to the loading station than the box directly receiving Bordrolfenbahn and the the casting line and the section of the cooling line receiving the cast box shapes up to the pressing station are designed as a pallet track are, with the press-out station on one long side of the rectangular track and the feed station on the other long side opposite one another and connected by a pallet translator.
Auf diese Weise sind nur in der unmittelbaren Umgebung der Formmaschine die relativ teuren Bordrollenbahnen notwendig, die aber wiederum den Vorteil haben, daß sie jederzeit um kürzere Abschnitte ergänzt werden können, während auf den weitaus längeren Abschnitten der Rechteckbahn eine billige Schienenbahn für die Palettenwagen vorgesehen sein kann«■This way you are only in the immediate vicinity of the molding machine the relatively expensive on-board roller conveyors are necessary, but that in turn have the advantage that they can be supplemented by shorter sections at any time, while on the much longer sections of the rectangular path a cheap railroad for the pallet wagons can be provided «■
Bei dieser Ausführungsform sind zweckmäßigerweise auch das Ende der Gießstrecke und der gegenüberliegende Anfang der Kühlstrecke durch einIn this embodiment, the end of the Casting line and the opposite beginning of the cooling line through a
ΛΑΛΑ
Paletten-Übersetzgerät verbunden. Sowohl dieses als auch das Übersetzgerät zwischen der Ausdrückstation und der Zulegestation können in einfacher Weise durch einen schienengebundenen Wagen verwirklicht sein, der seinerseits auf seiner Oberseite Schienenabschnitte für die Rollen der Paletten aufweist.Pallet transfer device connected. Both this and the translator between the press-out station and the loading station can be implemented in a simple manner by means of a rail-mounted carriage, which in turn has rail sections for the rollers of the pallets on its upper side.
Wie bekannt, kann der an die Ausdrückstation anschließende Teil der Kühlstrecke mindestens je zwei Formen nebeneinander aufweisen. Diese bekannte Formanlage wird erfindungsgemäß dadurch weiterentwickelt, daß dieser Teil der Kühlstrecke aus wenigstens zwei nebeneinander angeordneten, endlosen Gummibandförderern besteht, vor deren Kopfseite die Ausdrückstation angeordnet ist, an der wiederum ein nach oben wirkender Ausdrückzylinder angeordnet ist, der zwischen zwei Positionen jeweils an der Kopfseite, jedes der beiden Gummibandförderer verfahrbar ist. Dabei ist ein die Form vom Ausdrückzylinder auf den Gummibandförderer übergebender Schieber vorgesehen.As is known, the part of the Cooling section have at least two forms next to each other. These known molding plant is further developed according to the invention in that this part of the cooling section consists of at least two adjacent, endless rubber belt conveyors, in front of the head side of which the press-out station is arranged, on which in turn an upwardly acting push-out cylinder is arranged, which can be moved between two positions on the head side of each of the two rubber belt conveyors. It is a transferring the form from the ejection cylinder to the rubber belt conveyor Slider provided.
Bisher werden im Bereich der Kühlstrecke meist Plattenbandförderer verwendet, die in der Regel zwei, gegebenenfalls auch mehr Plätze nebeneinander aufweisen. Diese Plattenbandförderer haben den Vorteil, daß die Formen von der Seite her aufgeschoben werden können. Nachteilig ist jedoch ihr hoher Kostenanteil an der Gesamtanlage, eine gewisse Störempfindlichkeit und eine nicht geringe Geräuschentwicklung. Gummi band förderer sind wesentl ich preisgünstiger, jedoch können die Formen nicht nebeneinander von der Seite her aufgeschoben werden, weshalb bei deren Verwendung bisher stets nur ein einzelnes Band eingesetzt wurde. Erfindungsgemäß sind mindestens zwei solcher Gummibandförderer nebeneinander angeordnet und befindet sich die Ausdrück- und Übergabestation direkt an der Kopfseite dieser Gummibandförderer, so daß die Formen wechselweise auf den einen oder anderenSo far, apron belt conveyors have mostly been used in the cooling section usually used two, possibly more places exhibit side by side. These apron belt conveyors have the advantage that the molds can be pushed on from the side. The disadvantage, however, is their high cost share in the overall system, a certain susceptibility to interference and not a small amount of noise. Rubber belt conveyors are significantly cheaper, however the shapes cannot be pushed side by side are, which is why only a single tape has been used when using them. According to the invention there are at least two such Rubber belt conveyor arranged side by side and located the Express and transfer station directly at the head of this rubber belt conveyor, so that the forms alternate on one or the other
BAD ORIGINALBATH ORIGINAL
Förderer übergeben werden können. Damit wird ein gleichmäßger Arbeitstakt innerhalb der gesamten Formanlage erreicht.Donors can be handed over. This results in an even work cycle achieved within the entire molding line.
Wie bereits oben angedeutet, ist unter der Ausdrückstation eine Grube angeordnet, in der sich eine Einrichtung zum Wegführen des Abfallsandes befindet. Diese Einrichtung ist im allgemeinen als Bandförderer ausgebildet. Die erfindungsgemäße Ausbildung an der Ausdrückstation mit einem zwischen den beiden Kopfenden der Gummibandförderer verfahrbaren Ausdrückzylinder eröffnet die M öglichkeit, daß die den Abfallsand wegführende Einrichtung aus einem an dem verfahrbaren Ausdrückzylinder angeordneten, bis zum Boden der Grube reichenden Schieber besteht, der bei jeder Fahrbewegung des Ausdrückzylinders in der einen Richtung den Formsand aus der Grube herausschiebt. Es entfällt also ein gesonderter Förderer für den Abfallsand. Die Förderbewegung wird durch die Fahrbewegung des Ausdrückzylinders erzeugt, wobei als einfaches Fördermittel der Schieber nach Art eines Schneepflugs od.dgl. dient.As already indicated above, there is a pit under the press-out station arranged, in which there is a device for removing the waste sand is located. This device is generally designed as a belt conveyor. The inventive training at the expressing station with a Push-out cylinders that can be moved between the two head ends of the rubber belt conveyor opens up the possibility that the device leading away the waste sand consists of a there is a slide reaching to the bottom of the pit, which pushes the molding sand in one direction with every movement of the push-out cylinder pushes out of the pit. There is therefore no need for a separate conveyor for the waste sand. The conveying movement is determined by the travel movement of the Generated push-out cylinder, with the slide as a simple means of conveyance in the manner of a snow plow or the like. serves.
Um das Hineinfallen von Abfall sand in dem Bereich hinter dem Schieber zu vermeiden, kann an dem verfahrbaren Ausdrückzylinder eine dem Schieber bei dessen Schiebebewegung nachlaufende Abdeckung für die Grube angeordnet sein.To avoid falling rubbish sand in the area behind the gate valve to avoid, on the displaceable ejection cylinder, a cover for the slide that follows the slide during its sliding movement Be arranged pit.
Mit Vorteil sitzt der Ausdrückzylinder auf einem schienengebundenen Wagen, an dem der Schieber und die Abdeckung angeordnet sind.The ejector cylinder is advantageously seated on a rail-mounted one Car on which the slide and the cover are arranged.
Gemäß einer weiteren zweckmäßigen Ausführungsform befindet sich der Ausdrückzylinder weitgehend innerhalb der Grube vor dem Schieber. Dies bringt den Vorteil, daß der Ausdrückzylinder nicht als kostenaufwendiger Teleskopzylinder ausgebildet sein muß.According to a further advantageous embodiment is the Ejector cylinder largely within the pit in front of the slide. this has the advantage that the ejector cylinder is not considered to be more expensive Telescopic cylinder must be designed.
/β/ β
Zur Beseitigung des Abfallsandes ist gemäß einem weiteren Merkmal der Er findung vorgesehen, daß unterhalb der Schmalseite der Rechteckbahn an der Kopfseite der Formanlage und entlang der einen Langseite der Rechteckbahn bis in den Bereich der Ausdrückstation eine Grube mit einem Förderer zum Wegtransportieren des Abfallsandes angeordnet ist und daß der Boden der Grube an der Ausdrückstation bis oberhalb des Abfall sand-Förderers an der Langseite der Rechteckbahn reicht.To remove the waste sand is provided according to a further feature of the invention He that below the narrow side of the rectangular path on the head side of the molding system and along one long side of the rectangular path up to the area of the press-out station with a pit a conveyor is arranged for transporting away the waste sand and that the bottom of the pit at the expressing station extends to above the waste sand conveyor on the long side of the rectangular path.
Damit sind die beiden einzigen notwendigen Abfall sand-Gruben über eine relativ kurze Grube an der einen Langseite verbunden. Der an der Ausdrückstation anfallende Formsand wird durch den Schieber direkt an den in der Grube an der Langseite laufenden Förderer übergeben.This makes the only two necessary waste sand pits about one relatively short pit connected to one long side. The one at the express station Any molding sand is passed through the pusher directly to the conveyor running in the pit on the long side.
Die vorgenannte Ausführungsform wird dadurch in bevorzugter Weise weitergebildet, daß der Abfall sand-Förderer unmittelbar nach der Ausdrückstation aus der Grube heraus bis oberhalb des Niveaus der Formen auf dem Gummibandförderer der Kühlstrecke geführt und unterhalb seines Abgabeendes ein Querförderer angeordnet ist, der den Abfall sand auf die Formen abwirft. The aforementioned embodiment is thereby developed in a preferred manner, that the waste sand conveyor immediately after the squeezing station out of the pit to above the level of the molds on the rubber belt conveyor out of the cooling section and a cross conveyor is arranged below its discharge end, which throws the waste sand onto the molds.
Im Gegensatz zu den bekannten Formanlagen, bei denen der Abfall sand - meist in Gruben - bis zur Sandaufbereitung transportiert wird, gelangt hier der innerhalb der Formanlage anfallende AbfalIsand auf die Formen und mit diesen an die Auspackstation, wo ohnehin die größte Menge an aufzubereitendem Formsand anfällt.In contrast to the well-known molding plants, where the waste is sand - mostly in pits - until it is transported to the sand processing plant here the waste sand accumulating within the molding plant on the molds and with these to the unpacking station, where the largest amount of molding sand to be processed is produced anyway.
Nachstehend ist die Erfindung anhand eines bevorzugten Ausführungsbeispiels beschrieben, das in der Zeichnung dargestellt ist. In der Zeichnung zeigen:The invention is based on a preferred embodiment described, which is shown in the drawing. In the drawing demonstrate:
Figur 1 eine Draufsicht auf die Formanlage;Figure 1 is a plan view of the molding plant;
Figur 2 einen Schnitt A-A gemäß Figur 1;FIG. 2 shows a section A-A according to FIG. 1;
Figur 3 einen Schnitt B-B gemäß Figur 1FIG. 3 shows a section B-B according to FIG. 1
Figur 4 einen Schnitt C-C gemäß Figur 1 undFigure 4 shows a section C-C according to Figure 1 and
Figur 5 einen Schnitt D-D gemäß Figur 1.FIG. 5 shows a section D-D according to FIG. 1.
Wie die Draufsicht gemäß Fig. 1 zeigt, wird der Umriß der Gießerei-Formanlage im wesentlichen durch eine längliche Rechteckbahn bestimmt, die sich aus mehreren Abschnitten unterschiedlicher Funktion zusammensetzt. Kernstück jeder Formanlage ist die hier mit 1 bezeichnete Formmaschine, die an der Kopfseite der Rechteckbahn innerhalb derselben angeordnet ist. Sie arbeitet mit einem eine Schmalseite der Rechteckbahn bildenden Abschnitt 2 zusammen und besitzt zwei Stationen, von denen sich die Station 3 vor der Formmaschine innerhalb des Abschnittes 2 der Rechteckbahn befindet, während die zweite Station innerhalb der Formmaschine angeordnet ist. Oberhalb der Station 3 befindet sich stationär ein Formsand-Füllgefäß 4, das aus einem neben der Formanlage stehenden Formsandbunker 5 über einen Förderer 6 beschickt wird. An der Station 3 und unterhalb des Förderbahnabschnittes 2 befindet sich ein Anpreßaggregat 7, das zwischen den beiden Stationen verfahrbar ist, unmittelbar oberhalb des Anpreßaggregates 7 befindet sich ein Modellplattenträger 8 mit Modell. Dieses kann mittels einer ModelIWechseleinrichtung 9 durch ein anderes Modell ersetzt werden. Beispielsweise sind nebeneinander das Modell für den Oberkasten und den Unterkasten einer Form angeordnet. Ein ArbeitstaktAs the plan view of Fig. 1 shows, the outline of the foundry molding plant essentially determined by an elongated rectangular path, which is made up of several sections with different functions composed. The core of every molding system is the molding machine, designated here as 1, which is located on the head side of the rectangular track is arranged within the same. It works together with a section 2 which forms a narrow side of the rectangular path and has two stations, of which station 3 is located in front of the molding machine within section 2 of the rectangular path, while the second station is located inside the molding machine. Above station 3 there is a stationary molding sand filling vessel 4, which is fed from a molding sand bunker 5 located next to the molding system via a conveyor 6. At station 3 and below the Conveyor track section 2 is a pressing unit 7, which is between the two stations is movable, directly above the pressure unit 7 is a model plate carrier 8 with model. This can be replaced by a different model by means of a model changing device 9 be replaced. For example, the model for the upper box and the lower box of a form are arranged next to one another. One work cycle
- 10 -- 10 -
ASAS
läuft so ab, daß das Anpreßaggregat 7 in der Station 3 nach oben gegen den ModelIplattenträger fährt, diesen auf seinem weiteren Hubweg nach oben mitnimmt und gegen den in der Station 3 auf der Förderbahn befindlichen Kastenteil, z.B. einen Unterkasten 10 fährt, auch diesen mitnimmt und gegen den Öffnungsrand des Füllgefäßes 4 anpreßt. Gegebenenfalls kann auch noch zusätzlich ein Füllrahmen vorgesehen sein. Nach Abschluß des Füll Vorgangs wird das Anpreßaggregat 7 mit dem Unterkasten 10 etwas abgesenkt und in die Formmaschine hineingefahren, um dort den Unterkasten 10 wieder anzuheben und gegen das Verdichtungsaggregat anzupressen. Die Verdichtung des Formsandes kann pneumatisch, mechanisch oder in kombinierter Weise erfolgen. Der abgeformte Unterkasten wird nach Absenken vom Verdichtungsaggregat wieder in die Station 3 eingefahren, um dann auf dem Abschnitt 2 in Richtung des Pfeils 12 (Figur 1) weiter transportiert zu werden, wobei er beispielsweise einem Oberkasten 11 (Figur 4) folgt. Die Kastenteile 10, 11 erreichen nacheinander eine Abstreifeinrichtung 13 nach Art eines Pfluges, der am Formrücken überstehenden Formsand abstreift. Unmittelbar hinter der Abstreifeinrichtung 13 ist ein Trichterbohrgerät 14 angeordnet, das in mehrere Positionen mit Bezug auf die Form gebracht werden kann.runs so that the pressure unit 7 in the station 3 up against the model plate carrier moves, it follows on its further stroke at the top and against the one in station 3 on the conveyor track Box part, e.g. moves a lower box 10, also takes it along and presses it against the opening edge of the filling vessel 4. Possibly a filling frame can also be provided. After completion of the filling process, the pressure unit 7 with the lower box 10 lowered a little and driven into the molding machine in order to raise the lower box 10 again and against the compression unit to press. The molding sand can be compressed pneumatically, mechanically or in a combined manner. The molded lower box is retracted back into station 3 after lowering by the compaction unit, and then on section 2 in the direction of arrow 12 (Figure 1) to be transported further, for example, following an upper box 11 (Figure 4). The box parts 10, 11 reach one after the other a stripping device 13 in the manner of a plow, which scrapes off excess molding sand on the back of the mold. Immediately behind the Stripping device 13, a funnel drilling device 14 is arranged, which in several positions with respect to the shape can be brought.
Es folgt eine Wendestation 15, in der der Unterkasten gewendet wird, so daß die Form von oben zugänglich ist, während der Oberkasten sich bereits in entsprechender Position befindet.This is followed by a turning station 15 in which the lower box is turned, so that the form is accessible from above, while the upper box is is already in the appropriate position.
Der Abschnitt 2 der Rechteckbahn ist, wie insbesondere Figur 4 zeigt, erheblich über Bodenniveau angeordnet derart, daß die gesamte Formmaschine 1 auf Bodenniveau aufgestellt werden kann. Am Ende des Abschnittes 2 und im Bereich einer Ecke der Rechteckbahn ist deshalb ein Absenkgerät 16 angeordnet, das di© Formkastenhälften auf ArbeitsniveauSection 2 of the rectangular track is, as FIG. 4 shows in particular, arranged significantly above ground level such that the entire molding machine 1 can be set up at ground level. At the end of the section 2 and in the area of a corner of the rectangular path, a lowering device 16 is therefore arranged, which means that the molding box halves are at working level
absenkt, wie dies bei dem rechts unten gezeigten Oberkasten 11 der Fall ist. Die Rechteckbahn wird in diesem Bereich wie auch im Abschnitt 2 von Bordrollenbahnen gebildet. Von dem Absenkgerät 11 gelangen die Formkastenhälften auf eine Kerneinlegestrecke 17 an einer Langseite der Rechteckbahn (Figur 1). Die Kerneinlegestrecke 17 weist mehrere Stationen 18 zum Einlegen von Kernen, insbesondere in den Unterkasten, auf. Der Kerneinlegestrecke 17 folgt ein Zulegegerät 19, mittels dessen der Oberkasten 11 angehoben, und nach Unterfahren des Unterkastens auf diesen abgesenkt wird. An dem Zulegegerät 19 wird der komplette Formkasten von einem Palettenwagen übernommen, der seinerseits mittels eines auf Schienen 21 verfahrbaren Transportwagens herangefahren wird (Figur 1 und 2). Der Palettenwagen mit dem kompletten Formkasten 22 gelangt dann auf eine Schienenbahn 23, die den größten Teil der einen Langseite der Rechteckbahn ausmacht und als Gießstrecke 24 dient. Am Ende der Gießstrecke ist ein Bremszylinder 25 und ein Übersetzgerät 26 wiederum in Form eines schienengebundenen Wagens 26 angeordnet, der seinerseits auf der Oberseite Schienen 27 für den Palettenwagen aufweist. Der Palettenwagen mit dem Formkasten gelangt mittels dieses Übersetzgerätes auf die andere Langseite der Rechteckbahn, wo wiederum Schienen angeordnet sind, auf denen die Palettenwagen mit einem Stoßzylinder 28 taktweise vorwärtsbewegt werden. Dieser Abschnitt 29 der Rechteckbahn bildet einen ersten Teil einer Kühlstrecke, auf der sich die Form noch innerhalb des Formkastens befindet. Die in Richtung des Pfeils 30 transportierten Formkasten gelangen im Bereich der Formmaschine 1 in ein weiteres Übersetzgerät 31, das im wesentlichen aus einem horizontal verfahrbaren sowie heb- und senkbaren Greifer 32 (Figur 5) besteht. Mittels des Greifers 32 wird der Formkasten vom Palettenwagen 20 abgehoben. Der Palettenwagen 20 gelangt über die bereits beschriebenelowers, as in the case of the upper box 11 shown at the bottom right Case is. In this area, as in section 2, the rectangular track is formed by on-board roller tracks. Get from the lowering device 11 the molding box halves on a core insertion section 17 on one long side of the rectangular web (Figure 1). The core insertion line 17 has several stations 18 for inserting cores, in particular in the lower box. The core insertion section 17 is followed by a loading device 19, by means of which the upper box 11 is raised, and after Moving under the lower box is lowered onto it. The complete molding box from a pallet trolley is attached to the loading device 19 taken over, which in turn is brought up by means of a trolley that can be moved on rails 21 (FIGS. 1 and 2). The pallet trolley with the complete molding box 22 then arrives on a railroad track 23, which makes up the largest part of one long side of the rectangular track and serves as a casting line 24. At the end of the casting section there is a brake cylinder 25 and a translation device 26, again in the form of a rail-mounted one Arranged carriage 26, which in turn has rails 27 for the pallet truck on the top. The pallet trolley with the molding box reaches the other long side of the rectangular track by means of this transfer device, where rails are again arranged, on which the pallet trolley is moved forward cyclically with a push cylinder 28 will. This section 29 of the rectangular path forms a first part of a cooling section on which the shape is still within of the molding box is located. The transported in the direction of arrow 30 Molding boxes arrive in the area of the molding machine 1 Another translation device 31, which consists essentially of a horizontal movable and raisable and lowerable gripper 32 (Figure 5). The molding box is lifted from the pallet trolley 20 by means of the gripper 32. The pallet trolley 20 passes over the one already described
- 12 -- 12 -
Schienenbahn 21 wieder an das Zulegegerät 19. Auf diese Weise ist der Palettenumlauf geschlossen.Rail track 21 back to the loading device 19. In this way, the pallet circulation is closed.
Der im Greifer hängende Formkasten 32 wird in eine der beiden Positionen 33 oder 34 gefahren, die unmittelbar nebeneinander und am Aufgabeende je eines Gummiförderbandes 35, 36 angeordnet sind.The molding box 32 hanging in the gripper is in one of the two positions 33 or 34 driven, which are arranged directly next to one another and each of a rubber conveyor belt 35, 36 at the feed end.
Unterhalb dieser beiden Positionen 33, 34 befindet sich ein Ausdrückzylinder 37 mit Ausdrückplatte 38, der mittels eines Wagens 39 zwischen den beiden Positionen verfahrbar ist (Figur 5). Beim Hochfahren drückt die Ausdrückplatte 38 die Form aus dem in der entsprechenden Position befindlichen Formkasten 22 und bringt die Form 40 auf das Niveau des einen Gummibandförderers 36, auf den die Form dann übergeben wird. Beim nächsten Arbeitstakt fährt der Wagen 39 den Ausdrückzylinder 37 mit Ausdrückplatte 38 in die in Figur 5 strichpunktiert wiedergegebene andere Position 33. Auf diese Weise können wahlweise nur ein Gummibandförderer oder wechselweise beide Gummibandförderer beschickt werden. Die Gummibandförderer 35, 36 laufen in Richtung des Pfeils 41, also entgegen der Förderrichtung auf dem ersten Teil der Kühlstrecke 29 um und bilden den größeren zweiten Teil der Kühlstrecke, die unmittelbar neben dem ersten Teil 29 angeordnet ist. Die Formen 40 gelangen mittels der Gummibandförderer 35, 36 an eine Abgabestation 42, von der sie an eine Auspackstation, z.B. einen Rüttelrost 43 übergeben werden, um das Gußstück vom Formsand zu trennen.Below these two positions 33, 34 there is a push-out cylinder 37 with push-out plate 38, which can be moved between the two positions by means of a carriage 39 (FIG. 5). When starting up The push-out plate 38 presses the mold out of the molding box 22 located in the corresponding position and brings the mold 40 onto the Level of one rubber belt conveyor 36 onto which the mold is then transferred. During the next work cycle, the carriage 39 moves the push-out cylinder 37 with push-out plate 38 into that shown in dash-dotted lines in FIG other position 33. In this way, only one rubber belt conveyor or alternately both rubber belt conveyors can be charged will. The rubber belt conveyors 35, 36 run in the direction of the arrow 41, that is, against the conveying direction on the first part of the cooling section 29 um and form the larger, second part of the cooling section, which is arranged directly next to the first part 29. The forms 40 arrive by means of the rubber belt conveyors 35, 36 to a delivery station 42, from which they are transferred to an unpacking station, e.g. a vibrating grate 43 to separate the casting from the molding sand.
An die Ausdrückstation, und zwar an deren Position 34, schließt ein Abschnitt 44 der Rechteckbahn an, der die leeren Formkasten in ein Trenngerät 45 überführt, wo Oberkasten und Unterkasten voneinander getrennt und nacheinander der Station 3 vor der Formmaschine 1 zugeführtTo the press-out station, specifically at its position 34, includes Section 44 of the rectangular path, which the empty molding box in a Separating device 45 transferred, where upper box and lower box are separated from each other and successively fed to the station 3 in front of the molding machine 1
werden. Dabei werden die Formkstenhälften, wie Figur 4 zeigt, wieder vom Normalniveau auf das erhöhte Niveau angehoben, indem das Trenngerät einen entsprechend größeren Hub aufweist.will. In doing so, the mold box halves, as FIG. 4 shows, are again raised from the normal level to the higher level, in that the cutting device has a correspondingly larger stroke.
Im Bereich des Abschnittes 2 an der Schmalseite der Rechteckbahn ist eine Grube 46 angeordnet, in der unter sämtlichen Arbeitspositionen auf diesem Abschnitt ein Bandförderer 47 umläuft, der den an diesen Arbeitspositionen anfallenden Abfallsand aufnimmt und auf einen senkrecht dazu laufenden Bandförderer 53 übergibt. Dieser läuft in einer kurzen Grube 48 an der Langseite der Rechteckbahn von der Höhe des Trenngeräte 45 bis in Höhe der Ausdrückstation. Unterhalb der Ausdrückstation mit den Positionen 33, 34 ist gleichfalls eine Grube 49 angeordnet, in die der beim Ausdrücken anfallende Abfallsand gelangt. Um diesen aus der Grube 49 herauszufordern, ist an dem Wagen 39 mit dem Ausdrückzylinder37 und der Ausdrückplatte 38 ein Schieber 50 angeordnet, der bis auf den Boden der Grube 49 reicht. Ferner ist am Wagen 39 eine Abdeckung 51 angeordnet, die das Einfallen vom Formsand in den Raum hinter den Schieber 50 verhindert. Bei einer Fahrbewegung des Wagens 39 aus der strichpunktierten Position in die durchgezogene Position nimmt der Schieber 50 den in der Grube befindlichen Formsand mit. Die Grube 49 endet mit einer Öffnung 52 unmittelbar oberhalb des in der Grube 48 laufenden Bandförderers 53JDer Bandförderer 53 ist unmittelbar hinter der Ausdrückstation nach oben geführt (Figur 3) und gibt den Abfall sand auf eine querfördernde Einrichtung, z.B. eine Rutsche 54, die oberhalb der auf dem Gummiband 36 umlaufenden Formen 40 endet und den Abfallsand auf diese Formen abwirft.In the area of section 2 on the narrow side of the rectangular path is a pit 46 is arranged in which under all work positions on this section a belt conveyor 47 rotates, which picks up the waste sand accumulating at these work positions and places it on a perpendicular to it running belt conveyor 53 passes. This runs in a short pit 48 on the long side of the rectangular track from the height of the separator 45 up to the height of the press-out station. Below the expressing station with the positions 33, 34 a pit 49 is also arranged, into which the Waste sand that accumulates when squeezing it arrives. To get this out of the pit 49 is to be challenged on the carriage 39 with the push-out cylinder37 and the push-out plate 38, a slide 50 is arranged, which except for the The bottom of the pit 49 is sufficient. Furthermore, a cover 51 is on the carriage 39 arranged to prevent the molding sand from falling into the space behind the Slide 50 prevented. When the carriage 39 moves from the dot-dash position to the solid position, the Slide 50 with the foundry sand in the pit. The pit 49 ends with an opening 52 immediately above that in the pit 48 Running belt conveyor 53J The belt conveyor 53 is immediately behind the expressing station upwards (Figure 3) and sand the waste onto a transverse conveying device, for example a chute 54, which ends above the molds 40 circulating on the rubber belt 36, and the waste sand throws off on these forms.
In Abwandlung der zuvor beschriebenen Anlage kann der erste Teil 29 der Kühlstrecke auch als zusätzliche Gießstrecke verwendet werden, wenn beispielsweise die Schmelze zügig und vollständig gegossen werden muß, z.B. bei Sphäroguß. Dies geschieht dann bei Stillstand der Anlage.In a modification of the system described above, the first Part 29 of the cooling section is also used as an additional pouring section if, for example, the melt has to be poured quickly and completely, e.g. with nodular cast iron. this then happens when the system is at a standstill.
LeerseiteBlank page
Claims (13)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19823241288 DE3241288A1 (en) | 1982-11-09 | 1982-11-09 | FOUNDRY MOLDING SYSTEM |
| DE8383111015T DE3369473D1 (en) | 1982-11-09 | 1983-11-04 | Foundry mould plant |
| EP83111015A EP0112470B1 (en) | 1982-11-09 | 1983-11-04 | Foundry mould plant |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19823241288 DE3241288A1 (en) | 1982-11-09 | 1982-11-09 | FOUNDRY MOLDING SYSTEM |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE3241288A1 true DE3241288A1 (en) | 1984-05-10 |
Family
ID=6177636
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE19823241288 Withdrawn DE3241288A1 (en) | 1982-11-09 | 1982-11-09 | FOUNDRY MOLDING SYSTEM |
| DE8383111015T Expired DE3369473D1 (en) | 1982-11-09 | 1983-11-04 | Foundry mould plant |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE8383111015T Expired DE3369473D1 (en) | 1982-11-09 | 1983-11-04 | Foundry mould plant |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP0112470B1 (en) |
| DE (2) | DE3241288A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0506596A1 (en) * | 1991-03-26 | 1992-09-30 | Agustin Arana Erana | Foundry flaskless moulds moulding installation |
| US5553655A (en) * | 1992-08-13 | 1996-09-10 | Bmd Badische Maschinenfabrik Durlach Gmbh | Method for conveying moulding boxes and foundry moulding installation operating according to the method |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4628986A (en) * | 1985-03-26 | 1986-12-16 | Combustion Engineering, Inc. | Molding register system |
| DE3819118C2 (en) * | 1988-06-04 | 1995-08-17 | Wagner Heinrich Sinto Masch | Molding line |
| CN103418756B (en) * | 2012-05-14 | 2015-07-08 | 辽阳市富祥曲轴有限公司 | Automatic iron mold sand lined production line |
| CN105903947A (en) * | 2016-05-20 | 2016-08-31 | 许云东 | No-trolley horizontal box molding line |
| CN106734963B (en) * | 2017-03-01 | 2018-11-09 | 十堰捷茂工贸有限公司 | A kind of thin wall class casting and its moulding line and method |
| CN108838344A (en) * | 2018-07-16 | 2018-11-20 | 青岛恒林机械有限公司 | A kind of environmental protection and energy saving V method moulding line |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1962131B1 (en) * | 1969-12-11 | 1971-10-28 | Badische Maschf Gmbh | Automatic molding plant and operating procedures for this |
| DE2218683A1 (en) * | 1972-04-18 | 1973-10-25 | Foundry Design Corp | Foundry-operating installation - with mould magazine for open sand moulds used eg in casting iron |
| US4224979A (en) * | 1977-10-31 | 1980-09-30 | Mcneil Corporation | Automatic foundry system |
-
1982
- 1982-11-09 DE DE19823241288 patent/DE3241288A1/en not_active Withdrawn
-
1983
- 1983-11-04 DE DE8383111015T patent/DE3369473D1/en not_active Expired
- 1983-11-04 EP EP83111015A patent/EP0112470B1/en not_active Expired
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0506596A1 (en) * | 1991-03-26 | 1992-09-30 | Agustin Arana Erana | Foundry flaskless moulds moulding installation |
| US5553655A (en) * | 1992-08-13 | 1996-09-10 | Bmd Badische Maschinenfabrik Durlach Gmbh | Method for conveying moulding boxes and foundry moulding installation operating according to the method |
Also Published As
| Publication number | Publication date |
|---|---|
| DE3369473D1 (en) | 1987-03-05 |
| EP0112470B1 (en) | 1987-01-28 |
| EP0112470A1 (en) | 1984-07-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE102011016467B4 (en) | Grate carriage-changing device | |
| DE2152266B2 (en) | Mobile device for picking up or transporting used rail fastening elements | |
| EP0112470B1 (en) | Foundry mould plant | |
| DE1272695B (en) | Machine for pouring sweets into molds with powder filling | |
| EP0640529B1 (en) | Machine for banding printed products | |
| DE2656644C2 (en) | Device for filling sensitive products, e.g. fruit, into boxes | |
| EP0582855B1 (en) | Process for the transfer of moulds and casting mould plant making use of this process | |
| DD202113A5 (en) | APPARATUS FOR MANUFACTURING LOTRIGHT SHAPED MOLDING MADE OF BOX-FREE SHAPED PARTS, INCLUDING EQUIPMENT FOR REPLACING MODEL BOARDS | |
| DE19540866B4 (en) | Forming plant with form and handling function | |
| DE102010020060A1 (en) | Vulkanisierpressenanlage | |
| DE19848049A1 (en) | Foundry molding machine | |
| DE1783035A1 (en) | Cooling system for poured sand molds | |
| DE2846020C2 (en) | ||
| DE2156680A1 (en) | Device for demolding castings | |
| DE2548577C2 (en) | Method and device for carrying out manual preparatory work on foundry molding boxes in a single-station continuous molding machine | |
| DE3602076C2 (en) | ||
| DE10321532A1 (en) | Sand mold box machine has workstations to fill the boxes with sand and compress the sand filling, without recirculating or reciprocating filling frames to shorten cycle times and increase sand filling times | |
| DE3416019C2 (en) | Device for transporting horizontally divided, boxless sand casting molds for foundry purposes | |
| DE2746194C3 (en) | Arrangement for making boxless sand molds | |
| DE2713980A1 (en) | METHOD AND DEVICE FOR MANUFACTURING SAND MOLDS | |
| DD149751A3 (en) | WERKSTUECKTRANSPORTEINRICHTUNG | |
| DE2924114A1 (en) | MOLDING MACHINE FOR MAKING TWO-PIECE, CASELESS MOLDING | |
| DE2548316C2 (en) | Method and device for transporting boxes in automatic foundry molding systems | |
| DE3103288C2 (en) | ||
| DE1162545B (en) | Press for pressing synthetic rubber flakes into bales |