CN2265882Y - Short steel model for prestressed concrete sleeper - Google Patents
Short steel model for prestressed concrete sleeper Download PDFInfo
- Publication number
- CN2265882Y CN2265882Y CN 96222745 CN96222745U CN2265882Y CN 2265882 Y CN2265882 Y CN 2265882Y CN 96222745 CN96222745 CN 96222745 CN 96222745 U CN96222745 U CN 96222745U CN 2265882 Y CN2265882 Y CN 2265882Y
- Authority
- CN
- China
- Prior art keywords
- model
- sleeper
- anchor plate
- short steel
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 27
- 239000010959 steel Substances 0.000 title claims abstract description 27
- 241001669679 Eleotris Species 0.000 title claims abstract description 20
- 239000011513 prestressed concrete Substances 0.000 title abstract 2
- 239000004567 concrete Substances 0.000 claims abstract description 17
- 238000004080 punching Methods 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 230000010412 perfusion Effects 0.000 claims description 6
- 239000011150 reinforced concrete Substances 0.000 claims description 6
- 238000000465 moulding Methods 0.000 claims description 5
- 238000000034 method Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model relates to a short steel model for prestressed concrete sleepers, which is fixed by a steel mould shell, a main beam and an end beam into a whole. The steel mould shell adopts a 4*1 parallel permutation form to form a best size project. Prestretching machines are arranged at both ends of the steel mould shell, before stretching, an anchorage plate is arranged in the steel mould in advance, both ends of the steel bar are fixed to the anchorage plate, and the prestretching machine is stretch the anchorage plates respectively. The utility model solves the problem of stress nonuniform in the process of loading and unloading of prestress. Simultaneously, the anchorage plate stays in the concrete sleeper forever, the utility model improves the binding power of concrete and steel bar, and the utility model guarantees the quality of concrete sleepers.
Description
The utility model relates to a kind of model of producing prestressed reinforced concrete tie, especially for producing the short steel model that adapts to heavy duty, used for high-speed railway prestressed reinforced concrete tie, belongs to concrete component punching block technical field.
At present, China railways extensively adopts long steel model to produce sleeper, and the method for employing is once a pretensioned steel in groups, concrete perfusion moulding then.Long steel model is that five pairs of sleeper moulds are vertically arranged all-in-one-piece sleeper model, and the stretch-draw machine is established at two ends, and the reinforcing bar of vertical five sleeper moulds is unified stretch-draw by the stretch-draw machine, concrete perfusion moulding then.Concrete in reinforced concrete structure and reinforcing bar are two kinds of materials that mechanical property difference is very big, so their can co-operation be that the power of cohesive force directly influences the quality of concrete component because the existence of cohesive force can not freely be slided both relatively.Long steel model is difficult to guarantee enough cohesive forces, and the sleeper of being produced is applied on heavy duty, the high-speed track, because bearing capacity is on the low side, occurs vertical or horizontal crackle easily too early, the needs of incompatible heavy duty, high speed operation condition.
The purpose of this utility model provides the novel sleeper of a kind of suitable production, in advance stretch-draw prestressing force evenly and can meet the demands, unloading is convenient in demoulding with sleeper, and simple in structure, be easy to the supporting use of miscellaneous equipment, can produce bulk strength with stable aspect all satisfy the short steel model that the heavy duty high speed is runed the prestressed reinforced concrete tie of requirement.
The purpose of this utility model is achieved in that the actual conditions of bearing dynamic load according in the quality requirement of novel sleeper and the production process, adopt stress coefficient to determine the punching block design load, carry out the structure of steel die design in view of the above, 4 the stamping forming punching block housing of integral body parallel arranged, and evenly be fixed in the clamping of 5 girders of vertically arranging, two ends are with the fixing weak point steel model overall structure that forms of end carriage, its key dimension is that model length is 2786mm, width is 1500mm, highly be 310mm, vertical 5 girder thickness are 24mm, 2 butt cantilever thickness are 50mm, on every butt beam, be provided with the prestressing force pulling eye of 16 Φ 23, two ends end carriage arranged outside stretch-draw machine, can be respectively the reinforcing bar of punching block be carried out stretch-draw, anchor plate is put at the reinforcing bar two ends in advance in the punching block housing, the reinforcing bar two ends are fixed on the steel plate, stretch-draw machine piecemeal stretch-draw steel plate only during pretensioning, play the effect of tension reinforcing steel bar, anchor plate is forever stayed in the sleeper after the concrete perfusion moulding, no anchor plate sleeper exists deformed bar and the bad drawback of concentrating with prestressing force of concrete binding power, thereby influence the structural behaviour and the durability of sleeper, and short steel model band anchor plate can make prestressing force be delivered to concrete section effectively, overcome the defective of long steel model, improve the sleeper performance, thereby can satisfy heavy duty, the high speed operation condition is to the requirement of sleeper quality.
The advantage of the short steel model of said structure is: because the punching block housing is arranged rationally, mainly solved concrete sleeper in process of production prestressing force load and uninstall process in the problem of unbalanced stress, short steel model adopts the way that unloads respectively by stress loss numerical value when adding the stretch-draw of anchor plate root division, unloading, overcome because of the deformed bar error in length and the situation of putting the unbalance stress that a time difference causes, guarantee the cohesive force of concrete and reinforcing bar, thereby guaranteed the quality of every sleepers.
Concrete structure of the present utility model is provided by the following example and accompanying drawing.
Fig. 1 is a schematic top plan view of the present utility model;
Fig. 2 is that schematic diagram is looked on the left side of Fig. 1;
Fig. 3 is the A-A sectional schematic diagram of Fig. 1;
Fig. 4 is the B-B local section schematic diagram of Fig. 1.
The utility model is by four stamping forming punching block housing 4 parallel arranged of integral body, and evenly be fixed in the clamping of five girders of vertically arranging 3, two ends are with the end carriage 1 fixing weak point steel model overall structure that forms, whole key dimension is: length is 2786mm, width is 1500mm, highly be 310mm, girder 3 thickness are 24mm, end carriage 1 thickness is 50mm, every butt beam 1 is provided with the prestressing force pulling eye 5 of 16 Φ 23, and end carriage arranged outside stretch-draw machine in two ends is to the stretch-draw of going ahead of the rest of reinforcing bar in the punching block, anchor plate 6 is put at the reinforcing bar two ends in advance in the punching block housing 4, the reinforcing bar two ends are fixed on the anchor plate 6, and stretch-draw machine piecemeal stretch-draw anchor plate 6 plays the effect of tension reinforcing steel bar during pretensioning, anchor plate 6 is forever stayed in the sleeper after the concrete perfusion moulding, rail frid 7 is set during concrete perfusion in the punching block 4 on built-in fitting preformed hole 2.
Claims (2)
1, a kind of short steel model of prestressed reinforced concrete tie, fix as a whole by punching block housing, girder, end carriage, it is characterized in that: 4 stamping forming housing parallel arranged of integral body, be fixed in the clamping of 5 girders of vertically arranging and two ends 2 butt beams, form the overall structure of short steel model, its key dimension is: length is 2786mm, width is 1500mm, highly be 310mm, girder thickness is 24mm, end carriage thickness is 50mm, establishes the prestressing force pulling eye of 16 Φ 23 on every butt beam.
2, short steel model according to claim 1, it is characterized in that: when making sleeper, respectively at pre-buried anchor plate in the punching block housing, the reinforcing bar two ends are fixed on the anchor plate, the pre-stretch-draw anchor plate of stretch-draw machine, anchor plate is forever stayed in the sleeper after the moulding of concrete perfusion sleeper.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 96222745 CN2265882Y (en) | 1996-08-29 | 1996-08-29 | Short steel model for prestressed concrete sleeper |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 96222745 CN2265882Y (en) | 1996-08-29 | 1996-08-29 | Short steel model for prestressed concrete sleeper |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2265882Y true CN2265882Y (en) | 1997-10-29 |
Family
ID=33902213
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 96222745 Expired - Fee Related CN2265882Y (en) | 1996-08-29 | 1996-08-29 | Short steel model for prestressed concrete sleeper |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2265882Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102371624A (en) * | 2011-08-15 | 2012-03-14 | 中铁大桥局集团第六工程有限公司 | Method for tensioning pre-stressed reinforcement of ballast-less transition sleeper of ballast-less track |
| CN103507157A (en) * | 2012-06-29 | 2014-01-15 | 中铁二十二局集团第三工程有限公司 | Prefabricated T beam rib plate reinforcement steel bar locating frame |
| CN104859033A (en) * | 2015-02-02 | 2015-08-26 | 光明铁道控股有限公司 | Rail bearing trough plate for concrete sleeper die |
| CN108394006A (en) * | 2018-03-12 | 2018-08-14 | 天津银龙预应力材料股份有限公司 | Multigroup efficient sleeper mould of production formula |
| CN117428923A (en) * | 2023-12-21 | 2024-01-23 | 蚌埠市蚌铁轨枕有限责任公司 | A kind of reinforced concrete sleeper prestressed tensioning device |
-
1996
- 1996-08-29 CN CN 96222745 patent/CN2265882Y/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102371624A (en) * | 2011-08-15 | 2012-03-14 | 中铁大桥局集团第六工程有限公司 | Method for tensioning pre-stressed reinforcement of ballast-less transition sleeper of ballast-less track |
| CN103507157A (en) * | 2012-06-29 | 2014-01-15 | 中铁二十二局集团第三工程有限公司 | Prefabricated T beam rib plate reinforcement steel bar locating frame |
| CN103507157B (en) * | 2012-06-29 | 2015-12-30 | 中铁二十二局集团第三工程有限公司 | Precast T-Beam floor steel bar positioning frame |
| CN104859033A (en) * | 2015-02-02 | 2015-08-26 | 光明铁道控股有限公司 | Rail bearing trough plate for concrete sleeper die |
| CN108394006A (en) * | 2018-03-12 | 2018-08-14 | 天津银龙预应力材料股份有限公司 | Multigroup efficient sleeper mould of production formula |
| CN117428923A (en) * | 2023-12-21 | 2024-01-23 | 蚌埠市蚌铁轨枕有限责任公司 | A kind of reinforced concrete sleeper prestressed tensioning device |
| CN117428923B (en) * | 2023-12-21 | 2024-02-20 | 蚌埠市蚌铁轨枕有限责任公司 | A kind of reinforced concrete sleeper prestressed tensioning device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114775404B (en) | A steel beam-ultra-high performance concrete slab composite cap beam and construction method thereof | |
| CN2265882Y (en) | Short steel model for prestressed concrete sleeper | |
| CN109183782A (en) | The anti-splitting prefabricated concrete pipe pile of one kind and production method | |
| CN113216017A (en) | Steel-encased ultrahigh-performance concrete reinforcing method for box girder | |
| CN110424240B (en) | Bidirectional prestress reinforcement-free combined beam based on slow-bonding prestress UHPC permanent template and construction method | |
| CN100558523C (en) | Tensioning force-separated movable casing sleeper mould | |
| CN109898423B (en) | Main tower lower crossbeam prestress tensioning method and structure | |
| CN104631317A (en) | Hollow plate girder bridge structure and construction process thereof | |
| CN110524675A (en) | Pre-tensioning prefabricated I-beam and construction method thereof | |
| CN1923406A (en) | Cold core | |
| CN110154224B (en) | Production mold, workshop and process for length-width-adjustable prefabricated superposed beam | |
| CN220052270U (en) | Double-block sleeper forming die | |
| CN220534497U (en) | Mould is made to two beam plates of prestressing force | |
| CN216238989U (en) | A prefabricated hybrid structure single-storey factory building | |
| CN113700219B (en) | A kind of prefabricated prestressed concrete composite beam with cast-in-place tapered connecting piece and construction method | |
| CN211285230U (en) | Light simply supported box girder suitable for high-speed railway intelligent construction | |
| CN2381458Y (en) | Mould for post-tension railway sleeper | |
| CN219431501U (en) | Anchor bolt connecting structure of mixing tower conversion section | |
| CN223088267U (en) | Single pier self-stress bent cap structure | |
| CN201357496Y (en) | Hollow anchor cavity mold | |
| CN223802786U (en) | Novel anchorage device for pretensioned prestressed concrete electric pole | |
| CN2933805Y (en) | Pretensioned bidirectional prestressing concrete rail plate steel mould | |
| CN222595321U (en) | Slowly-bonded prestressed beam slab prestressed tendon tensioning structure penetrating through post-cast strip | |
| CN220619803U (en) | Bridge deck bottom die | |
| CN216403597U (en) | Concrete pouring die for two sides of track of gantry crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |