CN204703292U - A kind of self adaptation drainage pipe dredging robot - Google Patents
A kind of self adaptation drainage pipe dredging robot Download PDFInfo
- Publication number
- CN204703292U CN204703292U CN201520412190.8U CN201520412190U CN204703292U CN 204703292 U CN204703292 U CN 204703292U CN 201520412190 U CN201520412190 U CN 201520412190U CN 204703292 U CN204703292 U CN 204703292U
- Authority
- CN
- China
- Prior art keywords
- reamer
- adaptive
- shaft
- sleeve
- bevel gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Manipulator (AREA)
Abstract
本实用新型提供了一种自适应排水管道清淤机器人,其能解决现有排水管道清淤机器人存在的结构复杂、无法自适应管道结构的缺陷。其包括前端铰刀机构和后端行走机构,其特征在于:其还包括自适应机构,自适应机构的前端与铰刀机构通过万向节活动连接,自适应机构的后端安装后端行走机构。
The utility model provides an adaptive drainage pipeline dredging robot, which can solve the defects of the existing drainage pipeline dredging robot that the structure is complex and the pipeline structure cannot be self-adapted. It includes a front-end reamer mechanism and a rear-end walking mechanism, and is characterized in that it also includes an adaptive mechanism, the front end of the adaptive mechanism is connected to the reamer mechanism through a universal joint, and the rear end of the adaptive mechanism is installed with a rear-end walking mechanism .
Description
技术领域 technical field
本实用新型涉及机器人科学技术领域,尤其是涉及管道清淤机器人领域,具体为一种排水管道清淤机器人。 The utility model relates to the field of robot science and technology, in particular to the field of pipeline dredging robots, in particular to a drainage pipeline dredging robot.
背景技术 Background technique
在现代城市中排水设施必不可少,甚至成为保障城市稳定发展,人民生命财产安全的重要防线,是城市居民赖以生存的基础。因此管道堵塞、排水不畅等问题极有可能导致城市内涝进而危及居民安全。管道在使用过程中,由于各种因素的影响,会产生各种各样的管道堵塞与管道故障和损伤。如果不及时对管道进行检测、维修及清理就可能产生事故,造成不必要的损失。然而,管道所处的环境往往是不易直接达到或不允许人们直接进入的,检测及清洗难度很大。因此最有效的方法之一就是利用管道机器人来实现管道内的在线检测、维修和清理,但是现有的管道清淤机器人多存在结构复杂、无法根据管道结构进行自适应行走等问题,如公告号为CN201644462U的实用新型专利,其公开了一种“新型管道清淤机器人”,其结构复杂;又如公告号为CN203795580U的实用新型专利公开的一种排水管道清淤机器人,其只能对直径大小不变的管道进行清淤处理,适用范围小。 Drainage facilities are indispensable in modern cities, and even become an important line of defense to ensure the stable development of the city and the safety of people's lives and property, and the basis for the survival of urban residents. Therefore, problems such as pipe blockage and poor drainage are very likely to cause urban waterlogging and endanger the safety of residents. During the use of pipelines, due to the influence of various factors, various pipeline blockages, pipeline failures and damages will occur. If the pipeline is not detected, repaired and cleaned up in time, accidents may occur and unnecessary losses may be caused. However, the environment where the pipeline is located is often difficult to directly reach or not allow people to directly enter, and it is very difficult to detect and clean. Therefore, one of the most effective methods is to use pipeline robots to realize online detection, maintenance and cleaning in pipelines. However, most existing pipeline dredging robots have complex structures and cannot perform adaptive walking according to the pipeline structure. It is a utility model patent of CN201644462U, which discloses a "new pipeline dredging robot", which has a complex structure; another example is a drainage pipeline dredging robot disclosed by a utility model patent with the announcement number of CN203795580U, which can only be used for diameter size Unchanged pipelines are desilted, and the scope of application is small.
发明内容 Contents of the invention
本实用新型提供了一种自适应排水管道清淤机器人,其能解决现有排水管道清淤机器人存在的结构复杂、无法自适应管道结构的缺陷。 The utility model provides an adaptive drainage pipeline dredging robot, which can solve the defects of the existing drainage pipeline dredging robot that the structure is complex and the pipeline structure cannot be self-adapted.
其技术方案是这样的,其包括前端铰刀机构和后端行走机构,其特征在于:其还包括自适应机构,所述自适应机构的前端与所述铰刀机构通过万向节活动连接,所述自适应机构的后端安装所述后端行走机构。 Its technical solution is as follows, which includes a front-end reamer mechanism and a rear-end walking mechanism, and is characterized in that it also includes an adaptive mechanism, the front end of the adaptive mechanism is movably connected to the reamer mechanism through a universal joint, The rear end of the self-adaptive mechanism is installed with the rear end walking mechanism.
进一步的,所述自适应机构包括中间轴和三个自适应轮,所述中间轴上套装有前套筒和后套筒,并且所述前套筒与所述中间轴之间通过紧定螺钉锁紧,所述后套筒能沿所述中间轴轴向平移,所述前套筒、后套筒的外周面均径向均布设置有三个耳板,所述前套筒的三个耳板与后套筒的三个耳板位置一一对应,所述三个自适应轮分别通过各自的连杆机构与所述前套筒、后套筒的对应的耳板活动连接; Further, the self-adaptive mechanism includes an intermediate shaft and three adaptive wheels, a front sleeve and a rear sleeve are set on the intermediate shaft, and the front sleeve and the intermediate shaft are connected by set screws Locking, the rear sleeve can be axially translated along the intermediate shaft, and the outer peripheral surfaces of the front sleeve and the rear sleeve are equipped with three lugs evenly distributed in the radial direction, and the three lugs of the front sleeve The positions of the plates correspond to the positions of the three ear plates of the rear sleeve, and the three adaptive wheels are respectively connected with the corresponding ear plates of the front sleeve and the rear sleeve through their respective linkage mechanisms;
进一步的,所述连杆机构包括长连杆与短连杆,所述长连杆一端与所述自适应轮的轮轴连接,所述长连杆另一端与所述后套筒上的一个耳板可转动连接,所述短连杆的一端与所述前套筒上对应的耳板可转动连接,所述短连杆的另一端与所述长连杆的中部可转动连接; Further, the link mechanism includes a long link and a short link, one end of the long link is connected to the axle of the adaptive wheel, and the other end of the long link is connected to an ear on the rear sleeve. The plate is rotatably connected, one end of the short connecting rod is rotatably connected to the corresponding ear plate on the front sleeve, and the other end of the short connecting rod is rotatably connected to the middle part of the long connecting rod;
所述中间轴的后端设有电机安装座,所述电机安装座前侧设置有壳板,所述中间轴位于所述壳板与所述后套筒之间的部分上套装有弹簧。 The rear end of the intermediate shaft is provided with a motor mounting seat, the front side of the motor mounting seat is provided with a shell plate, and a spring is sleeved on the part of the intermediate shaft located between the shell plate and the rear sleeve.
进一步的,所述后端行走机构包括驱动电机和三组行走轮组,所述驱动电机同轴安装于所述中间轴的电机安装座上,所述驱动电机的驱动轴上安装有驱动齿轮,所述三组行走轮组分别通过三级减速机构与所述驱动齿轮传动连接,并且所述三组行走轮组呈周向120度分布布置; Further, the rear-end walking mechanism includes a drive motor and three sets of travel wheels, the drive motor is coaxially installed on the motor mounting seat of the intermediate shaft, and a drive gear is installed on the drive shaft of the drive motor. The three sets of traveling wheels are respectively connected to the driving gear through a three-stage reduction mechanism, and the three sets of traveling wheels are distributed in a circumferential direction of 120 degrees;
所述三级减速机构包括直齿圆柱轮齿轮、第一锥齿轮、第二锥齿轮和第三锥齿轮,所述直齿圆柱齿轮与所述驱动齿轮啮合连接,所述第一锥齿轮安装于第一传动轴上,所述第一锥齿轮、第二锥齿轮分别安装于第二传动轴的两端,所述行走轮组的轮轴上安装有所述第三锥齿轮,所述第一锥齿轮与所述直齿圆柱齿轮啮合连接,所述第二锥齿轮与所述第三锥齿轮啮合连接; The three-stage reduction mechanism includes a spur gear, a first bevel gear, a second bevel gear and a third bevel gear, the spur gear is engaged with the driving gear, and the first bevel gear is mounted on On the first transmission shaft, the first bevel gear and the second bevel gear are installed on both ends of the second transmission shaft respectively, the third bevel gear is installed on the axle of the walking wheel set, the first bevel gear The gear is meshed with the spur gear, and the second bevel gear is meshed with the third bevel gear;
所述三组行走机构的三级减速机构中的直齿圆柱齿轮呈周向120度分布并同时与所述驱动齿轮啮合连接; The spur gears in the three-stage reduction mechanism of the three groups of traveling mechanisms are distributed at 120 degrees in the circumferential direction and meshed with the driving gear at the same time;
所述第二传动轴包括轴套部与轴芯部,所述轴芯部套装于所述轴套部内,所述轴套部一端安装有所述第二锥齿轮,所述轴套部的另一端设置有挡板,所述轴套部的挡板一侧开有轴向的盲孔,所述轴芯部的一端安装所述第一锥齿轮,所述第一锥齿轮通过所述轴芯部上的台阶面轴向限位,所述轴芯部的另一端插装于所述轴套部的盲孔内并能在所述盲孔内平移,所述轴芯部外周套装有大力矩弹簧,并且所述大力矩弹簧的两端分别与所述挡板、所述轴芯部上的台阶面连接。 The second transmission shaft includes a shaft sleeve part and a shaft core part, the shaft core part is sleeved in the shaft sleeve part, the second bevel gear is installed on one end of the shaft sleeve part, and the other end of the shaft sleeve part One end is provided with a baffle plate, and an axial blind hole is opened on one side of the baffle plate of the shaft sleeve, and the first bevel gear is installed on one end of the shaft core, and the first bevel gear passes through the shaft core The step surface on the part is axially limited, the other end of the shaft core part is inserted into the blind hole of the shaft sleeve part and can translate in the blind hole, and the outer circumference of the shaft core part is sleeved with a large torque spring, and the two ends of the large moment spring are respectively connected with the step surface on the baffle plate and the shaft core.
进一步的,所述前端铰刀机构包括铰刀驱动电机和气缸, 所述气缸安装于所述铰刀驱动电机的输出轴上,所述气缸的推杆端部安装于连杆支架,所述铰刀头机构包括铰刀支架,所述铰刀支架呈圆环状,所述铰刀支架前端沿周向均匀铰接安装有四个铰刀片,所述四个铰刀片上分别安装有一根连杆,所述连杆穿过所述呈圆环状的铰刀支架后与所述连杆支架连接; Further, the front-end reamer mechanism includes a reamer drive motor and a cylinder, the cylinder is installed on the output shaft of the reamer drive motor, the end of the push rod of the cylinder is installed on the connecting rod bracket, and the reamer The cutter head mechanism includes a reamer support, the reamer support is circular, and the front end of the reamer support is evenly hinged along the circumferential direction to install four reamer blades, and each of the four reamer blades is respectively equipped with a connecting rod. The connecting rod is connected with the connecting rod bracket after passing through the annular reamer bracket;
所述铰刀支架的后端面安装于前端法兰,所述铰刀驱动电机安装于后端法兰,所述前端法兰与后端法兰之间通过外部罩壳连接,所述铰刀驱动电机、气缸位于所述罩壳内; The rear end surface of the reamer bracket is installed on the front flange, the reamer driving motor is installed on the rear end flange, the front flange and the rear end flange are connected through an external casing, and the reamer drives The motor and the cylinder are located in the casing;
所述中间轴上设置有钢丝固定法兰,所述后端法兰与钢丝固定法兰之间通过斜拉钢丝连接。 A steel wire fixing flange is arranged on the intermediate shaft, and the rear end flange and the steel wire fixing flange are connected by cable-stayed steel wires.
与现有的清淤机器人相比较,本实用新型的有益效果在于:其设置的自适应机构能够自适应管道内径变化,从而保证对管道进行可靠、有效的清淤作业,同时通过自适应机构与铰刀机构活动连接,能够保证清淤机器人在管道转弯处的自动转弯行走,更加确保对管道的可靠、全面的清淤处理;另外,后端行走机构的驱动电机直接安装于自适应机构的中间轴上,使得整个清淤机器人的重心后移,保证了后端行走机构的稳定行走,进一步确保在管道内的可靠、有效清淤。 Compared with the existing dredging robot, the beneficial effect of the utility model is that the self-adaptive mechanism provided by it can adapt to the change of the inner diameter of the pipeline, thereby ensuring reliable and effective dredging operations on the pipeline, and at the same time through the self-adaptive mechanism and The movable connection of the reamer mechanism can ensure the automatic turning and walking of the dredging robot at the turning point of the pipeline, and more ensure the reliable and comprehensive dredging treatment of the pipeline; in addition, the driving motor of the rear-end walking mechanism is directly installed in the middle of the self-adaptive mechanism On the shaft, the center of gravity of the entire dredging robot is moved backward, ensuring the stable running of the rear-end walking mechanism, and further ensuring reliable and effective dredging in the pipeline.
附图说明 Description of drawings
图1为本实用新型一种自适应排水管道清淤机器人的整体示意图; Fig. 1 is the overall schematic diagram of a kind of self-adaptive drainage pipe dredging robot of the present utility model;
图2为本实用新型一种自适应排水管道清淤机器人的装配结构示意图; Fig. 2 is a schematic diagram of the assembly structure of an adaptive drainage pipe dredging robot of the present invention;
图3为本实用新型一种自适应排水管道清淤机器人中的自适应机构的结构示意图; Fig. 3 is a structural schematic diagram of an adaptive mechanism in an adaptive drainage pipe dredging robot of the present invention;
图4为本实用新型中的自适应机构中自适应轮221的连杆机构261与前套筒23、后套筒24之间的连接传动结构示意图; Fig. 4 is a schematic diagram of the connection transmission structure between the link mechanism 261 of the self-adaptive wheel 221 and the front sleeve 23 and the rear sleeve 24 in the self-adaptive mechanism of the present invention;
图5为本实用新型一种自适应排水管道清淤机器人中的自适应机构的中间轴示意图; Fig. 5 is a schematic diagram of the intermediate axis of the self-adaptive mechanism in a self-adaptive drainage pipe dredging robot of the present invention;
图6为本实用新型一种自适应排水管道清淤机器人中的后端行走机构的结构示意图; Fig. 6 is a structural schematic diagram of the rear-end walking mechanism in an adaptive drainage pipe dredging robot of the present invention;
图7为本实用新型一种自适应排水管道清淤机器人中的前端铰刀机构示意图。 Fig. 7 is a schematic diagram of a front-end reamer mechanism in an adaptive drainage pipe dredging robot of the present invention.
具体实施方式 Detailed ways
见图1,本实用新型一种自适应排水管道清淤机器人包括前端铰刀机构10、自适应机构20和后端行走机构30,自适应机构20的前端通过万向节211与铰刀机构10活动连接,自适应机构20的后端安装后端行走机构30。本申请中所说的前端是指清淤机器人在排水管道内前进方向的一侧端,后端即与前端相反方向的一侧端。 See Fig. 1, a kind of self-adaptive drainage pipe dredging robot of the present utility model comprises front-end reamer mechanism 10, self-adaptive mechanism 20 and rear-end walking mechanism 30, and the front end of self-adaptive mechanism 20 connects with reamer mechanism 10 through universal joint 211 Actively connected, the rear end of the adaptive mechanism 20 is equipped with a rear end walking mechanism 30 . The front end mentioned in this application refers to the side end of the dredging robot in the direction of advancement in the drainage pipe, and the rear end is the side end in the opposite direction to the front end.
见图3,自适应机构20包括中间轴21和三个自适应轮221、222、223,中间轴21上套装有前套筒23和后套筒24,并且前套筒23与中间轴21之间通过紧定螺钉25锁紧从而保证前套筒23与紧定螺钉25之间既不会发生相对转动又不会发生轴向的相对移动,后套筒24能沿中间轴21轴向平移,前套筒23均布设置有三个耳板、分别为231、232、233,后套筒24的外周面径向均布设置有三个耳板、分别为241、242、243,前套筒23的三个耳板231、232、233与后套筒的三个耳板位置241、242、243一一对应,三个自适应轮221、222、223分别通过各自的连杆机构261、262、263与前套筒、后套筒的对应的耳板活动连接; See Fig. 3, the adaptive mechanism 20 comprises an intermediate shaft 21 and three adaptive wheels 221, 222, 223, the intermediate shaft 21 is covered with a front sleeve 23 and a rear sleeve 24, and between the front sleeve 23 and the intermediate shaft 21 The set screw 25 is used to lock between the front sleeve 23 and the set screw 25 to ensure that neither relative rotation nor axial relative movement occurs between the front sleeve 23 and the set screw 25, and the rear sleeve 24 can be axially translated along the intermediate shaft 21, The front sleeve 23 is evenly distributed with three lugs, respectively 231, 232, and 233; The three lugs 231, 232, 233 are in one-to-one correspondence with the three lug positions 241, 242, 243 of the rear sleeve, and the three adaptive wheels 221, 222, 223 pass through their respective link mechanisms 261, 262, 263 respectively. It is movably connected with the corresponding ear plates of the front sleeve and the rear sleeve;
下面以自适应轮221为例具体描述一下自适应轮221的连杆机构261与前套筒23、后套筒24之间的连接传动结构,见图4,连杆机构261包括长连杆2611与短连杆2612,长连杆2611一端与自适应轮221的轮轴连接,长连杆2611另一端与后套筒24上的耳板241可转动连接,短连杆2612的一端与前套筒23上对应的耳板231可转动连接,短连杆2612的另一端与长连杆2611的中部可转动连接;中间轴21的后端设有电机安装座27,电机27安装座前侧设置有壳板28,中间轴21位于壳板28与后套筒24之间的部分上套装有弹簧29;中间轴21的前端通过万向节211与前端铰刀机构10活动连接。 Next, take the adaptive wheel 221 as an example to specifically describe the connection transmission structure between the link mechanism 261 of the adaptive wheel 221 and the front sleeve 23 and the rear sleeve 24, as shown in Figure 4, the link mechanism 261 includes a long link 2611 With the short connecting rod 2612, one end of the long connecting rod 2611 is connected with the axle of the adaptive wheel 221, the other end of the long connecting rod 2611 is rotatably connected with the ear plate 241 on the rear sleeve 24, and one end of the short connecting rod 2612 is connected with the front sleeve The corresponding lug plate 231 on 23 is rotatably connected, and the other end of short connecting rod 2612 is rotatably connected with the middle part of long connecting rod 2611; The shell plate 28 and the part of the intermediate shaft 21 between the shell plate 28 and the rear sleeve 24 are covered with a spring 29 ; the front end of the intermediate shaft 21 is movably connected with the front end reamer mechanism 10 through a universal joint 211 .
见图2和图6,后端行走机构30包括驱动电机31和三组行走轮组321、322、323(图2中,由于视角原因行走轮组323未标注),驱动电机31同轴安装于中间轴21的电机安装座27上,驱动电机31的驱动轴311上安装有驱动齿轮33,三组行走轮组分别321、322、323通过三级减速机构与驱动齿轮33传动连接,并且三组行走轮组321、322、323呈周向120度分布布置;图1中,19为驱动电机外罩,驱动电机31安装于驱动电机外罩19内;每一组行走轮组分别包含两个行走轮,两个行走轮之间通过轮轴35同轴连接,见图6; See Fig. 2 and Fig. 6, the rear-end traveling mechanism 30 includes a drive motor 31 and three sets of travel wheel sets 321, 322, 323 (in Fig. 2, the travel wheel set 323 is not marked due to viewing angle), and the drive motor 31 is coaxially installed on On the motor mounting seat 27 of the intermediate shaft 21, the driving gear 33 is installed on the driving shaft 311 of the driving motor 31, and the three groups of walking wheel groups 321, 322, 323 are respectively connected with the driving gear 33 through a three-stage reduction mechanism, and the three groups The walking wheel sets 321, 322, 323 are distributed in a circumferential direction of 120 degrees; among Fig. 1, 19 is the driving motor housing, and the driving motor 31 is installed in the driving motor housing 19; each group of walking wheel sets comprises two walking wheels respectively, The two walking wheels are coaxially connected by a wheel shaft 35, as shown in Fig. 6;
见图6,三级减速机构包括直齿圆柱轮齿轮341、第一锥齿轮343、第二锥齿轮344和第三锥齿轮345,直齿圆柱齿轮341与驱动齿轮33啮合连接,第一锥齿轮343安装于第一传动轴346上,第一锥齿轮343、第二锥齿轮344分别安装于第二传动轴342的两端,行走轮组的轮轴35上安装有第三锥齿轮345,第一锥齿轮343与直齿圆柱齿轮341啮合连接,第二锥齿轮344与第三锥齿轮345啮合连接;三组行走机构的三级减速机构中的直齿圆柱齿轮呈周向120度分布并同时与驱动齿轮33啮合连接; See Figure 6, the three-stage reduction mechanism includes a spur gear 341, a first bevel gear 343, a second bevel gear 344 and a third bevel gear 345, the spur gear 341 is engaged with the driving gear 33, and the first bevel gear 343 is installed on the first transmission shaft 346, and the first bevel gear 343 and the second bevel gear 344 are installed on the two ends of the second transmission shaft 342 respectively, and the third bevel gear 345 is installed on the wheel shaft 35 of the walking wheel set. The bevel gear 343 is meshed with the spur gear 341, and the second bevel gear 344 is meshed with the third bevel gear 345; The driving gear 33 is meshed and connected;
见图6,第二传动轴342包括轴套部3421与轴芯部3422,轴套部3421一端安装有第二锥齿轮344,轴套部3421的另一端设置有挡板3423,轴套部3421的挡板一侧开有轴向的盲孔,轴芯部3422的一端安装第一锥齿轮343,第一锥齿轮343通过轴芯部3422上的台阶面3425轴向限位, 轴芯部3422的另一端插装于轴套部3421的盲孔内并能在盲孔内平移,轴芯部3422外周套装有大力矩弹簧3424,并且大力矩弹簧3424的两端分别与挡板3423、轴芯部上的台阶面3425连接; As shown in Figure 6, the second drive shaft 342 includes a shaft sleeve part 3421 and a shaft core part 3422, the second bevel gear 344 is installed on one end of the shaft sleeve part 3421, the other end of the shaft sleeve part 3421 is provided with a baffle 3423, and the shaft sleeve part 3421 There is an axial blind hole on one side of the baffle plate, and the first bevel gear 343 is installed on one end of the shaft core part 3422, and the first bevel gear 343 is axially limited by the step surface 3425 on the shaft core part 3422, and the shaft core part 3422 The other end of the shaft sleeve part 3421 is inserted into the blind hole and can translate in the blind hole. The outer circumference of the shaft core part 3422 is covered with a large torque spring 3424, and the two ends of the large torque spring 3424 are respectively connected to the baffle plate 3423 and the shaft core. The stepped surface 3425 on the part is connected;
后端行走机构30工作时,驱动电机31启动,驱动轴311转动驱动三组行走轮组的三级减速机构运转,通过三级减速机构驱动三组驱动轮组转动行走;清淤管道内径变小时,后端行走机构30的三个行走轮组受压,可伸缩的第二传动轴342受压使得轴套部3421与轴芯部3422受压发生相向移动同时大力矩弹簧3424受压变形,使得第二传动轴342轴向长度缩小,实现后端行走机构的自适应效果;而当清淤管道内径变大时,大力矩弹簧3424回弹从而推动轴套部3421与轴芯部3422背向移动,使得第二传动轴342轴向长度伸长,亦实现了后端行走机构的自适应效果。 When the rear-end traveling mechanism 30 works, the drive motor 31 starts, and the drive shaft 311 rotates to drive the three-stage deceleration mechanism of the three sets of walking wheels to run, and the three sets of driving wheels are driven to rotate and walk through the three-stage deceleration mechanism; the inner diameter of the dredging pipeline becomes smaller , the three traveling wheel sets of the rear-end traveling mechanism 30 are under pressure, and the telescopic second drive shaft 342 is under pressure so that the sleeve part 3421 and the shaft core part 3422 are pressed and move toward each other, and the large moment spring 3424 is deformed under pressure, so that The axial length of the second transmission shaft 342 is reduced to realize the self-adaptive effect of the rear-end walking mechanism; and when the inner diameter of the dredging pipeline becomes larger, the large moment spring 3424 rebounds to push the sleeve part 3421 and the shaft core part 3422 to move back , so that the axial length of the second transmission shaft 342 is elongated, and the adaptive effect of the rear-end traveling mechanism is also realized.
前端铰刀机构10包括铰刀头11、铰刀驱动电机13和气缸12, 见图7,气缸12安装于铰刀驱动电机13的输出轴上131,铰刀头11包括铰刀支架111,铰刀支架111呈圆环状,铰刀支架111前端沿周向均匀铰接安装有四个铰刀片112,四个铰刀片112上分别安装有一根连杆113,连杆113穿过呈圆环状的铰刀支架111后与连杆支架16连接; Front end reamer mechanism 10 comprises reamer head 11, reamer drive motor 13 and cylinder 12, see Fig. 7, cylinder 12 is installed on the output shaft 131 of reamer drive motor 13, reamer head 11 comprises reamer support 111, reamer The knife support 111 is in the shape of a ring, and the front end of the reamer support 111 is evenly hinged along the circumference to install four reamer blades 112, and a connecting rod 113 is installed on each of the four reamer blades 112, and the connecting rod 113 passes through the ring-shaped The reamer bracket 111 is connected with the connecting rod bracket 16 behind;
铰刀支架111的后端面安装于前端法兰114上,铰刀驱动电机13安装于后端法兰132,前端法兰114与后端法兰132之间通过外部罩壳18连接,铰刀驱动电机13、气缸12位于外部罩壳18内; The rear end face of the reamer bracket 111 is installed on the front flange 114, the reamer driving motor 13 is installed on the rear end flange 132, the front flange 114 and the rear end flange 132 are connected by an external cover 18, and the reamer drives The motor 13 and the cylinder 12 are located in the outer casing 18;
中间轴21的前端通过万向节211与前端法兰114活动连接;中间轴21上设置有钢丝固定法兰210,后端法兰132与钢丝固定法兰210之间通过斜拉钢丝17连接;铰刀头11的四个铰刀片112在闭合状态下(即在非清淤状态下)不与排水管道内壁接触,因而铰刀头受自重影响并在万向节211的作用下整体向下垂坠而损坏,而斜拉钢丝17的设置能够有效拉紧前端铰刀头机构10防止其在非清淤状态下垂坠损坏;另外,由于斜拉钢丝17本身具有一定的抗扭性能,因此斜拉钢丝17不会影响前端铰刀头机构10与自适应机构20在万向节211的作用下发生扭转。 The front end of the intermediate shaft 21 is flexibly connected to the front flange 114 through a universal joint 211; the intermediate shaft 21 is provided with a steel wire fixing flange 210, and the rear end flange 132 and the steel wire fixing flange 210 are connected by a cable-stayed steel wire 17; The four reamer blades 112 of the reamer head 11 are not in contact with the inner wall of the drainage pipe in the closed state (that is, in the non-dredging state), so the reamer head is affected by its own weight and hangs down as a whole under the action of the universal joint 211 damage, and the setting of the cable-stayed steel wire 17 can effectively tighten the front end reamer head mechanism 10 to prevent it from sagging and being damaged in a non-dredging state; in addition, because the cable-stayed steel wire 17 itself has certain torsional performance, the 17 will not affect the twisting of the front end reamer head mechanism 10 and the adaptive mechanism 20 under the action of the universal joint 211 .
下面具体描述下本实用新型的工作的具体动作过程:将本实用新型清淤机器人整体放入待清淤作业管道内,启动后端行走机构30的驱动电机31以及前端铰刀机构10的铰刀驱动电机13,驱动电机31经由三组三级减速机构驱动三组行走轮组321、322、323向前滚动从而驱动清淤机器人整体在管道内前行,气缸12动作使得气缸12的推杆向前伸出从而推动连杆支架16及安装于连杆支架16上的各根连杆113向前顶出,各连杆113向前顶出的同时推动各铰刀刀片112展开,在各铰刀刀片112展开的同时铰刀驱动电机13动作带动气缸12以及铰刀头11转动,从而实现清淤机器人在管道内前行的同时铰刀头11同步转动清淤;在管道清淤过程中,当遇到管径变化时,自适应机构20通过其连杆机构与弹簧29的压缩和回弹作用配合实现自适应;由于前端铰刀机构10与自适应机构10之间是通过万向节211连接,因此在遇到管道转弯处前端铰刀机构10与自适应机构20之间在万向节211的作用下发生适应性扭转,从而带动自适应机构20和后端行走机构30顺利通过管道转弯处。 The specific action process of the work of the utility model is described in detail below: put the dredging robot of the utility model into the pipeline to be dredged as a whole, start the drive motor 31 of the rear-end walking mechanism 30 and the reamer of the front-end reamer mechanism 10 Drive motor 13, drive motor 31 drives three sets of walking wheel sets 321, 322, 323 to roll forward through three sets of three-stage reduction mechanisms, thereby driving the dredging robot to move forward in the pipeline as a whole, and the action of cylinder 12 makes the push rod of cylinder 12 move forward. Stretch forward so as to push the connecting rod bracket 16 and each connecting rod 113 installed on the connecting rod bracket 16 to eject forward, and each connecting rod 113 pushes each reamer blade 112 to expand when pushing forward, and each reamer When the blade 112 is unfolded, the reamer drive motor 13 acts to drive the cylinder 12 and the reamer head 11 to rotate, thereby realizing the dredging robot moving forward in the pipeline while the reamer head 11 rotates synchronously for dredging; during the pipeline dredging process, when When the pipe diameter changes, the self-adaptive mechanism 20 realizes self-adaptation through the cooperation of its link mechanism and the compression and rebound effect of the spring 29; since the front end reamer mechanism 10 and the self-adaptive mechanism 10 are connected by a universal joint 211 , therefore, adaptive torsion occurs between the front reamer mechanism 10 and the adaptive mechanism 20 under the action of the universal joint 211 at the turning of the pipeline, thereby driving the adaptive mechanism 20 and the rear traveling mechanism 30 to smoothly pass through the turning of the pipeline .
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520412190.8U CN204703292U (en) | 2015-06-16 | 2015-06-16 | A kind of self adaptation drainage pipe dredging robot |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520412190.8U CN204703292U (en) | 2015-06-16 | 2015-06-16 | A kind of self adaptation drainage pipe dredging robot |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204703292U true CN204703292U (en) | 2015-10-14 |
Family
ID=54282919
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520412190.8U Expired - Lifetime CN204703292U (en) | 2015-06-16 | 2015-06-16 | A kind of self adaptation drainage pipe dredging robot |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204703292U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104912186A (en) * | 2015-06-16 | 2015-09-16 | 江南大学 | Self-adaptive drain pipeline dredging robot |
| CN106013412A (en) * | 2016-06-28 | 2016-10-12 | 林超 | Intelligent municipal engineering road sewer cleaning equipment |
| CN108662351A (en) * | 2018-05-30 | 2018-10-16 | 沈阳工业大学 | A kind of wheeled watertight conduit robot of asymmetric reducing |
| CN109386688A (en) * | 2017-08-02 | 2019-02-26 | 金飞 | A kind of sundries dredging humanoid robot |
-
2015
- 2015-06-16 CN CN201520412190.8U patent/CN204703292U/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104912186A (en) * | 2015-06-16 | 2015-09-16 | 江南大学 | Self-adaptive drain pipeline dredging robot |
| CN104912186B (en) * | 2015-06-16 | 2017-06-06 | 江南大学 | Self adaptation drainage pipeline dredging robot |
| CN106013412A (en) * | 2016-06-28 | 2016-10-12 | 林超 | Intelligent municipal engineering road sewer cleaning equipment |
| CN106013412B (en) * | 2016-06-28 | 2018-01-23 | 杭州市城建设计研究院有限公司 | A kind of municipal works road sewer intelligence cleaning equipment |
| CN109386688A (en) * | 2017-08-02 | 2019-02-26 | 金飞 | A kind of sundries dredging humanoid robot |
| CN109386688B (en) * | 2017-08-02 | 2021-02-02 | 涂鹏 | Debris mediation type robot |
| CN108662351A (en) * | 2018-05-30 | 2018-10-16 | 沈阳工业大学 | A kind of wheeled watertight conduit robot of asymmetric reducing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104912186B (en) | Self adaptation drainage pipeline dredging robot | |
| CN108480333B (en) | Pipeline variable-diameter cleaning robot | |
| CN108554955B (en) | Reducing pipeline cleaning robot | |
| CN109465260B (en) | Pipeline cleaning robot | |
| CN204703292U (en) | A kind of self adaptation drainage pipe dredging robot | |
| CN216430888U (en) | Pipeline dredging robot | |
| CN108443642B (en) | Peristaltic pipeline dredging and cleaning robot | |
| CN205399589U (en) | A pipeline obstacle removal device | |
| CN108644532B (en) | Self-adaptive pipeline dredging robot | |
| CN204769766U (en) | Pipeline cleaning device based on gear drive | |
| CN114653696A (en) | Pipeline inner wall self-adaptation robot device of decontaminating based on centrifugal force principle | |
| CN206632075U (en) | Self-adapting pipe dredging device | |
| CN112108468A (en) | Automatic reducing type pipeline cleaning robot | |
| CN203571334U (en) | Pipeline inspection robot propelling mechanism with obstacle removing function | |
| CN101308998B (en) | Sweeper for dredging underground pipeline | |
| CN103736699B (en) | guide structure of pipeline cleaning device | |
| CN205183264U (en) | Colliery drainage pipe scale removal belt cleaning device | |
| CN117399384A (en) | A ship pipeline cleaning device | |
| CN108194763B (en) | The wheeled T-type pipe robot of big variable diameter | |
| CN116411629A (en) | Cleaning robot for pipe network blockage and application method thereof | |
| CN206997271U (en) | Straight pipe cleaning dolly | |
| CN220747209U (en) | A municipal pipeline dredging robot | |
| CN203549276U (en) | Pipeline dredging robot | |
| CN112523338A (en) | Pipeline dredging device | |
| CN104896258A (en) | Self-adaptive wheel type pipe inner moving device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20151014 Effective date of abandoning: 20170606 |