CN202689179U CN201220413862.3U CN201220413862U CN202689179U CN 202689179 U CN202689179 U CN 202689179U CN 201220413862 U CN201220413862 U CN 201220413862U CN 202689179 U CN202689179 U CN 202689179U
Authority
CN
China
Prior art keywords
steel plate
masonry
wall
wall body
epoxy resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220413862.3U
Other languages
Chinese (zh)
Inventor
郭华忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN RUIXIN BUILDING SPECIAL TECHNOLOGY ENGINEERING Co Ltd
Original Assignee
JIANGYIN RUIXIN BUILDING SPECIAL TECHNOLOGY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN RUIXIN BUILDING SPECIAL TECHNOLOGY ENGINEERING Co Ltd filed Critical JIANGYIN RUIXIN BUILDING SPECIAL TECHNOLOGY ENGINEERING Co Ltd
Priority to CN201220413862.3U priority Critical patent/CN202689179U/en
Application granted granted Critical
Publication of CN202689179U publication Critical patent/CN202689179U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a steel plate-masonry component. The steel plate-masonry combining force component comprises masonry, the steel plate, a split bolt and epoxy resin, the steel plate is coated with the masonry, the split bolt penetrates through the masonry and the steel plate and is fixedly connected with the steel plate, the epoxy resin is filled in a gap between the masonry and the steel plate, wherein the masonry is a wall body or a column body which is built a brick and concrete. The steel plate is Q235 or Q345 steel, and the thickness of the steel plate is 8-12 millimeters. When a masonry bearing structure is transformed in a large space, a masonry wall in the position of the masonry combining force component of the steel plate is arranged and works with an outsourcing steel plate in cooperative mode, and contributions for a residual wall body are fully played. In the process of construction, because the steel plate firstly forms a whole with the wall body and participates in working, and the wall body is wholly dismounted, so that a support template and a safe support are not required, construction is simple and whole shape is beautiful.

Description

A kind of steel plate-brickwork combination stressed member
Technical field
The utility model relates to technical field of structural engineering, and a kind of steel plate-brickwork combination stressed member specifically is used for masonry load-carrying members house when carrying out large-space rebuilding, set primary structure member when load bearing wall is removed.
Background technology
In order to satisfy masonry load-carrying members house in the large space demand of using on the function, need partial weight-bearing masonry (most for brick) wall extracted to carry out spatial spread, cause the transfer route of original body of wall bearing load to change, must arrange and effectively underpin beam, post primary structure member, just can guarantee safety and normal use of structure.
At present, carry out the engineering of large-space rebuilding about the masonry load-carrying members, the most ripe and traditional underpin beam, post is the combining structure of employing reinforced concrete structure or Steel concrete etc.Existing method is fairly perfect and safe and reliable on construction technology, but work owing to having the concrete construction part and can not take into full account original body of wall, there is following weak point in existing method: (1) adopts wet trade in a large number, and curing time is longer, causes the construction period long.Owing to there being the concrete construction part, concrete normal curing time need to be guaranteed, and has increased the early strong concrete that waits Admixture even adopt, and also needs fully form removal of a period of time, normally comes into operation.(2) newly-increased beam, column cross-section size are generally larger, affect architectural composition and outward appearance.The beam that newly increases, the normally outer outside that wraps in residual masonry wall of column section part can be embedded in body of wall inside under a few cases when satisfying certain technical requirements; Do not consider residual masonry participation work on the one hand, on the other hand for concrete construction quality, the sectional dimension of newly-increased part can not be too small.(3) need a large amount of templates and support in the work progress.Concrete is shaped needs template and scaffold support.In addition, also because concrete deadweight is heavier, larger to the settling ratio of original structure, cause that easily sedimentation is inhomogeneous.
Summary of the invention
The purpose of this utility model is a kind of steel plate-brickwork combination stressed member that provides for the deficiencies in the prior art, use this member can overcome conventional steel reinforced concrete method exist wet trade many, need temporary supporting and template, the member section attractive in appearance and use of building and the shortcoming such as long in time limit of affecting bigger than normal, its short construction period, overall appearance.
The purpose of this utility model is achieved in that
A kind of steel plate-brickwork combination stressed member, be characterized in that this primary structure member comprises masonry, steel plate, split bolt and epoxy resin, steel plate coats masonry, split bolt runs through masonry and steel plate and is fixedly connected with steel plate, in the slit of epoxy resin filling between masonry and steel plate, wherein: described masonry is body of wall or the cylinder that brick and concrete are built into; Described steel plate is Q235 or Q345 steel, and steel plate thickness is 8~12mm.
The relative masonry of steel plate in the utility model possesses very high tension, compressive strength, but steel plate is less because of the sectional dimension of self, and its stability is very poor, constructs to be easy to occur cripling or whole unstability when unreasonable.Masonry has certain compressive strength usually, and tensile strength is very low, but its sectional dimension is relatively large.Steel plate and masonry are by split bolt and the whole co-operation of the rear formation of structure glue binding material constraint, and steel plate has certain effect of contraction to masonry, can improve intensity and the deformability of masonry; Reperfusion structure glue can strengthen the masonry globality and steel plate is produced lateral restriction; Masonry plays the effect that delays even stop the cripling unstability to encased steel plate.Steel plate and masonry are maximized favourable factors and minimized unfavourable ones, and jointly improve the usefulness of material.Therefore, the force-mechanism of this combined member is very rational.
When the utility model carried out large-space rebuilding in the masonry load-carrying members, except based process was identical with traditional method, its superstructure obviously played the purpose of saving the duration owing to there not being the wet trade of concrete construction; Masonry wall and the encased steel plate collaborative work of steel plate-brickwork combination stressed member position are set, give full play to the contribution of residual body of wall; In the work progress, because steel plate forms whole participation work with body of wall first, and then carries out the body of wall overall pulling down, so do not need support template and safety supports; Steel plate is owing to self very thin thickness, and the sectional dimension of steel plate-brickwork combination stressed member is very little to appearance effects; Because steel plate is welded and installed outsourcing body of wall, so can do orthogonal, T shape or L shaped to steel plate-brickwork combination stressed member section as required, global shape is attractive in appearance.
Description of drawings
Fig. 1 is the utility model outline drawing;
Fig. 2 is A-A place structural representation among Fig. 1;
Fig. 3 is B-B place structural representation among Fig. 1;
Fig. 4 is C place enlarged drawing among Fig. 2.
The specific embodiment
Consult Fig. 2~Fig. 4, the utility model comprises masonry 1, steel plate 2, split bolt 3 and epoxy resin 4, steel plate 2 coats masonry 1, split bolt 3 runs through masonry 1 and steel plate 2 and is fixedly connected with steel plate 2, epoxy resin 4 is filled in the slit between masonry 1 and the steel plate 2, wherein: body of wall or cylinder that described masonry 1 is built into for brick and concrete; Described steel plate 2 is Q235 or Q345 steel, and steel plate thickness is 8~12mm.
Consult Fig. 1, the utility model is to form like this:
, by designing requirement, determine that the building material desire extracts masonry load bearing wall place steel plate-brickwork combination stressed member position is set, its steel plate-brickwork combination stressed member comprises steel plate-brickwork coupled column and steel plate-brickwork compound beam;
⑵, the load bearing wall both sides rendering layer that will need steel plate-brickwork combination stressed member is set are removed totally, then smear evenly with cement mortar 6, and thickness is 5~10mm approximately, and mortar solidifies the front oblique groove 5mm of quadrature that is on the top layer;
⑶, the steel plate of cutting out is fixed on the body of wall both sides, takes split bolt 3 to tighten fixing, and be welded nut with electric welding and prevent from becoming flexible; Steel plate 2 adopts Q235 or Q345 steel plate, and steel plate thickness is 8~12mm, and concrete thickness is chosen and should be determined according to computational analysis; Split bolt 3 adopts M12~M16 high-strength bolt; Welding rod adopts the welding rod that is complementary with corresponding steel plate; The strength grade of masonry 1 is without related request.Wherein, layout for split bolt 3 adopts quincunx or rectangular arrangement, consider that the partial buckling unstable failure more easily appears in the crooked pressure zone of compound beam and coupled column two ends, so adopt 15t at beam deflection pressure zone and post bolts at two ends spacing, all the other location gap adopt 30t, and t is steel plate thickness; The styletable scope is near capital and the high scope of suspension column 400mm; The beam deflection pressure zone be near the beam section height of compression-side half, 1/3rd zones of span;
⑷, dismounting post both sides bodies of wall (Local Damaged section concrete repair) also connect sealing with steel plate 2 with all the other side welds of pillar, make hole in encased steel plate 2 weldings pressure injection epoxy resin 4 series structure glue are carried out in the inside of steel plate-brickwork coupled column, fill steel plate 2 inboard grooves 5 and masonry 1 slit.Require colloid tensile strength to be not less than 30MPa, test method is according to " Test method for tensile properties of resin casting body " (GB/T 2568).
⑸ body of wall is also with at the bottom of the Plate Welding enclosed beam at the bottom of, the dismounting steel plate-brickwork compound beam.
⑹, beam, post Nodes steel plate 2 docking full welds, and set up floor and strengthen.It should be noted that for fear of the impact of welding procedure high temperature on the structure glue mechanical property, must follow the working procedure that member welds first rear reperfusion structure glue.
, with press device to compound beam inside infusion epoxy resin 4 series structure glue, fill steel plate 2 inboard grooves 5 and masonry 1 slit.
⑻, last does antirust, fireproof jointing sheath at surface of steel plate, reaches the durability of current specifications requirement.

Claims (2)

1. steel plate-brickwork combination stressed member, it is characterized in that this primary structure member comprises masonry (1), steel plate (2), split bolt (3) and epoxy resin (4), steel plate (2) coats masonry (1), split bolt (3) runs through masonry (1) and steel plate (2) and is fixedly connected with steel plate (2), epoxy resin (4) is filled in the slit between masonry (1) and the steel plate (2), wherein: body of wall or cylinder that described masonry (1) is built into for brick and concrete.
2. steel plate-brickwork combination stressed member according to claim 1 is characterized in that described steel plate (2) is Q235 or Q345 steel, and steel plate thickness is 8~12mm.
CN201220413862.3U 2012-08-21 2012-08-21 Steel plate-masonry combining force component Expired - Lifetime CN202689179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220413862.3U CN202689179U (en) 2012-08-21 2012-08-21 Steel plate-masonry combining force component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220413862.3U CN202689179U (en) 2012-08-21 2012-08-21 Steel plate-masonry combining force component

Publications (1)

Publication Number Publication Date
CN202689179U true CN202689179U (en) 2013-01-23

Family

ID=47544817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220413862.3U Expired - Lifetime CN202689179U (en) 2012-08-21 2012-08-21 Steel plate-masonry combining force component

Country Status (1)

Country Link
CN (1) CN202689179U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184764A (en) * 2013-03-11 2013-07-03 张祖权 Prefabricated house frame
CN106401019A (en) * 2016-11-28 2017-02-15 郑州大学 Cold-formed thin-wall steel adobe wall and construction method
CN117188694A (en) * 2023-10-26 2023-12-08 广西路建集团建筑工程有限公司 A fully assembled steel-concrete structure roof and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184764A (en) * 2013-03-11 2013-07-03 张祖权 Prefabricated house frame
CN106401019A (en) * 2016-11-28 2017-02-15 郑州大学 Cold-formed thin-wall steel adobe wall and construction method
CN106401019B (en) * 2016-11-28 2018-06-05 郑州大学 A kind of light gauge cold-formed steel shape adobe wall and construction method
CN117188694A (en) * 2023-10-26 2023-12-08 广西路建集团建筑工程有限公司 A fully assembled steel-concrete structure roof and its construction method
CN117188694B (en) * 2023-10-26 2025-12-16 广西路建集团建筑工程有限公司 Fully-assembled steel-concrete structure roof and construction method thereof

Similar Documents

Publication Publication Date Title
CN203462615U (en) Prefabricated, assembled and integral type shear wall and connecting node thereof
CN101672108B (en) Steel plate-brickwork combination stressed building component and production method thereof
CN105064511A (en) Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof
CN202899637U (en) Enlarged section reinforced structure for circular reinforced concrete column
CN102677909A (en) Tool type support for mounting composite slabs
CN108560716A (en) A kind of concrete filled steel tube node of column and beam structure and its construction method
CN202689179U (en) Steel plate-masonry combining force component
CN104912197A (en) Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN204662711U (en) A kind of prestressing force hair side seam is linked and packed formula shear wall structure
CN202899128U (en) Rock anchor crane beam capable of adjusting main load bearing anchor rod stress in overall process
CN103603494A (en) Ultra-thin steel truss inclined wall construction method and formwork structure
CN203514528U (en) Composite connection structure of concrete filled steel tubular column and thin steel plate shear wall
CN105155868A (en) Method for pulling pillar through prestress using non-binding steel strands
CN204728528U (en) The I-shaped encased steel plate shear wall of Multicarity
CN201649308U (en) A wood base beam socket type original bamboo column foundation
CN107653997A (en) Assembled soft steel energy dissipation wall and its construction method
CN204645333U (en) Fabricated shear wall levels syndeton
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN203639841U (en) Steel plate-concrete combined reinforcement structure of hollow plate beam
CN202830741U (en) Semi-assembled type bamboo-concrete combined bridge
CN204356896U (en) Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN204151698U (en) T beam transverse prestress reinforcing construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130123