CN110593339B - Special ditching and burying integrated device for laying cable pipeline - Google Patents
Special ditching and burying integrated device for laying cable pipeline Download PDFInfo
- Publication number
- CN110593339B CN110593339B CN201910860559.4A CN201910860559A CN110593339B CN 110593339 B CN110593339 B CN 110593339B CN 201910860559 A CN201910860559 A CN 201910860559A CN 110593339 B CN110593339 B CN 110593339B
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- motor
- rotating shaft
- plate
- threaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/08—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/12—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with equipment for back-filling trenches or ditches
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
Abstract
本发明公开了一种线缆管道铺设的专用开沟填埋一体化装置,属于线缆管道铺设技术领域,具体包括承载箱、第一电机、第二电机、第三电机、第四电机、第一转轴、第二转轴、开槽轮和碾压轮,所述承载箱的左侧面设置有连接座;所述承载箱的下表面固定连接有四个滑轮;所述承载箱的正面均布设置有第一通孔、第二通孔和第三通孔。本发明由于设置了开槽轮、收管盘、填土板和碾压轮,使开槽轮能够对地面进行开槽,使收管盘能够将线管放出,使线管落在地槽内,填土板能够对土进行回填,碾压轮能够将土压实,解决了当前工作人员对线管的铺设需要多个工作人员一起工作效率过低的问题,从而节省了工作人员的体力,提高了工作人员的工作效率。
The invention discloses a special trenching and burying integrated device for laying cable pipelines, which belongs to the technical field of cable pipeline laying, and specifically includes a carrying box, a first motor, a second motor, a third motor, a fourth motor, a third motor and a third motor. A rotating shaft, a second rotating shaft, a slotted wheel and a rolling wheel, the left side of the carrying box is provided with a connecting seat; the lower surface of the carrying box is fixedly connected with four pulleys; the front surface of the carrying box is evenly distributed A first through hole, a second through hole and a third through hole are provided. Since the invention is provided with a slotting wheel, a tube reel, a filling plate and a rolling wheel, the slotting wheel can slot the ground, so that the tube reel can release the line pipe and make the line pipe fall into the ground groove , the soil filling board can backfill the soil, and the rolling wheel can compact the soil, which solves the problem that the current workers need multiple workers to work together and the work efficiency is too low, thus saving the physical strength of the workers. Improve the efficiency of the staff.
Description
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910860559.4A CN110593339B (en) | 2019-09-11 | 2019-09-11 | Special ditching and burying integrated device for laying cable pipeline |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910860559.4A CN110593339B (en) | 2019-09-11 | 2019-09-11 | Special ditching and burying integrated device for laying cable pipeline |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110593339A CN110593339A (en) | 2019-12-20 |
| CN110593339B true CN110593339B (en) | 2022-03-11 |
Family
ID=68858929
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910860559.4A Active CN110593339B (en) | 2019-09-11 | 2019-09-11 | Special ditching and burying integrated device for laying cable pipeline |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110593339B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111910699B (en) * | 2020-07-21 | 2022-07-15 | 东至尔岛道路运输有限公司 | Construction is with pipeline buried auxiliary assembly that has protection limit structure |
| CN112064752B (en) * | 2020-09-07 | 2021-10-01 | 浙江蓝绿双城建筑设计有限公司 | Drain pipe construction equipment and drain pipe construction method |
| CN112064706B (en) * | 2020-09-18 | 2022-03-22 | 山东通广电子有限公司 | An electric pipeline laying device |
| CN114325993B (en) * | 2021-12-22 | 2023-10-20 | 福建省万维新能源电力有限公司 | Automatic groover for optical cable laying |
| CN114703913A (en) * | 2022-03-11 | 2022-07-05 | 山西四建集团有限公司 | Mounting tool for pre-buried pipeline on undulating pavement and construction method thereof |
| CN114623285B (en) * | 2022-03-26 | 2024-07-02 | 河南省水利第一工程局 | Small-bore hose pipe laying machine |
| CN114914851A (en) * | 2022-06-08 | 2022-08-16 | 李朝有 | Extra-high voltage cable laying device |
| CN115679784A (en) * | 2022-11-30 | 2023-02-03 | 中国二十二冶集团有限公司 | In the process of pavement reconstruction, the integrated trolley for the construction of passing hoses |
| CN119531441B (en) * | 2024-11-30 | 2025-10-03 | 国网上海市电力公司 | An adjustable trenching device for underground power pipeline construction on different surfaces |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU758527B2 (en) * | 1999-04-19 | 2003-03-27 | Prysmian Cavi E Sistemi Energia S.R.L. | An apparatus for laying underground electric cables |
| EP1167635A1 (en) * | 2000-06-21 | 2002-01-02 | Georg Föckersperger GmbH | Arrangement for inserting a conduit |
| JP4849579B1 (en) * | 2010-08-17 | 2012-01-11 | 有限会社インタードレーン・ジャパン | Mobile underdrain drainage burial equipment |
| CN205839833U (en) * | 2016-06-17 | 2016-12-28 | 山西省交通科学研究院 | Cable unit is buried in a kind of power engineering |
| CN107956229A (en) * | 2017-12-12 | 2018-04-24 | 黄正秀 | A kind of buried 450V polyvinyl chloride insulations control cable laying excavation backfill system |
| CN109972683A (en) * | 2019-05-05 | 2019-07-05 | 樊强 | A kind of treegarden irrigation Pipe installing ground fluting apparatus |
-
2019
- 2019-09-11 CN CN201910860559.4A patent/CN110593339B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN110593339A (en) | 2019-12-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110593339B (en) | Special ditching and burying integrated device for laying cable pipeline | |
| CN114878227B (en) | Rock core drilling device for geological exploration | |
| CN110440052B (en) | Movable smooth jacking mechanism for pipe jacking construction | |
| CN108711788B (en) | Automatic laying equipment for land cables | |
| CN210293742U (en) | Earth taking machine for geological exploration | |
| CN201470934U (en) | Dematron drilling machine | |
| CN221118578U (en) | Bored concrete pile concrete superfilling height detection device | |
| CN209676817U (en) | A kind of novel fruits plantation ditcher for loosening the soil before planting | |
| CN110112682A (en) | A kind of non-excavation type crosses over the track laying device of road | |
| CN112660927A (en) | A bury traditional thread binding putting for hydraulic and hydroelectric engineering | |
| CN209427875U (en) | Capstan device | |
| CN214147286U (en) | Non-excavation horizontal orientation device of pipeline | |
| CN215979200U (en) | Oil-water well oil layer fixed-point deep penetration horizontal drilling device with adjustable size | |
| CN201447704U (en) | A light-duty gear-type drainage plate fast insertion machine | |
| CN111042731A (en) | Gear rack transmission mountain geophysical prospecting electric drilling machine | |
| CN211573380U (en) | Drilling equipment for coal mine tunneling operation | |
| CN117117715A (en) | An efficient laying device for underground cables | |
| CN211258537U (en) | Automatic pole device of going up of double-deck pole case | |
| CN218733129U (en) | Line laying device for civil engineering construction of transformer substation | |
| CN221295960U (en) | A lifting device for laying sewage pipes | |
| CN218894128U (en) | Water conservancy and hydropower engineering is with burying line device | |
| CN220775216U (en) | Hydraulic engineering construction buried pipe pay-off | |
| CN216438900U (en) | A water conservancy project management model exhibition stand | |
| CN215733175U (en) | Traction device for laying submarine cable | |
| CN219546320U (en) | Buried pipe paying-off device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250917 Address after: Room 2406, 24th Floor, Building 1, No. 118, Section 2, Renmin North Road, Jinniu District, Chengdu City, Sichuan Province, 610000 Patentee after: Sichuan Whale Wolf Technology Group Co.,Ltd. Country or region after: China Address before: Nanming District of Guizhou city in Guiyang province 550005 see Longdong Road No. 103 Patentee before: guiyang university Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20260104 Address after: 518100Guangdong ProvinceShenzhen CityGuangming DistrictXinhu StreetXinqiang CommunityXinpotouMeiyingsen NearbyNo. 101, 42nd House Patentee after: Shenzhen Fujiakang Cable Co.,Ltd. Country or region after: China Address before: Room 2406, 24th Floor, Building 1, No. 118, Section 2, Renmin North Road, Jinniu District, Chengdu City, Sichuan Province, 610000 Patentee before: Sichuan Whale Wolf Technology Group Co.,Ltd. Country or region before: China |