CN105447175A - Power grid model sharing method applicable to distributed computation of power system - Google Patents
Power grid model sharing method applicable to distributed computation of power system Download PDFInfo
- Publication number
- CN105447175A CN105447175A CN201510906219.2A CN201510906219A CN105447175A CN 105447175 A CN105447175 A CN 105447175A CN 201510906219 A CN201510906219 A CN 201510906219A CN 105447175 A CN105447175 A CN 105447175A
- Authority
- CN
- China
- Prior art keywords
- model
- distributed
- equipment
- power grid
- access
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/17—Details of further file system functions
- G06F16/176—Support for shared access to files; File sharing support
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Water Supply & Treatment (AREA)
- Tourism & Hospitality (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Primary Health Care (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种适用于电力系统分布式计算的电网模型共享方法,包括构建适用于多级调度一体化分布式计算的电网物理模型;对分布式一体化电网模型依次进行局部和全局校验;并将校验通过的电网模型进行分布式存储及冗余备份;启用验证通过的电网物理模型;将大电网分布式网络拓扑分析功能和分布式状态估计功能集成到模型管理中心,根据应用的不同需求,访问电网物理模型和计算模型;该方法充分利用各级调度中心现有的分布式部署的存储资源,采用分布式数据部署策略对电网物理模型和计算模型进行物理分布存储和逻辑集中管理,构建电网模型。基于分布式数据库技术和分布式文件系统技术,实现电网物理模型和计算模型的全网范围即时共享。
A grid model sharing method suitable for distributed computing of power systems, including building a grid physical model suitable for multi-level dispatching integrated distributed computing; sequentially performing local and global verification on the distributed integrated grid model; Distributed storage and redundant backup of the power grid model that has passed the verification; enable the physical model of the power grid that has passed the verification; integrate the distributed network topology analysis function and distributed state estimation function of the large power grid into the model management center, according to the different needs of the application, access Power grid physical model and calculation model; this method makes full use of the existing distributed deployment storage resources of dispatch centers at all levels, adopts distributed data deployment strategy to carry out physical distribution storage and logical centralized management of power grid physical model and calculation model, and builds a power grid model . Based on distributed database technology and distributed file system technology, the network-wide real-time sharing of the physical model and calculation model of the power grid is realized.
Description
技术领域technical field
本发明涉及一种维护共享方法,具体涉及一种适用于电力系统在线分布式计算的电网模型即时共享方法。The invention relates to a maintenance sharing method, in particular to an instant sharing method of a power grid model suitable for online distributed computing of a power system.
背景技术Background technique
随着我国特高压互联大电网的建设和以及大规模分布式电源的接入,为支撑电力系统调度业务,客观上要求大电网调度控制系统的电网建模范围更大、精度更高。电网电压等级向上发展至1000kV特高压电网,向下延伸至分布式电源入网的精细化建模,电网规模正急速膨胀。为适应大型互联电网跨区域、跨电压等级协作计算及超大规模电网计算的需求,新一代智能电网调度控制系统提出大电网分布式分析计算的总体架构,而电网模型是电力系统分析计算的基础。对此,需要制定适用于大电网在线分布式计算的电网模型即时共享方法,为多级协同调度模式下的大电网在线分布式计算模型共享问题提供解决方案。With the construction of my country's UHV interconnected large power grid and the access of large-scale distributed power sources, in order to support the power system dispatching business, it is objectively required that the power grid modeling range of the large power grid dispatching control system is larger and the accuracy is higher. The voltage level of the power grid has been developed up to 1000kV UHV power grid, and down to the fine modeling of distributed power grid access, and the scale of the power grid is rapidly expanding. In order to meet the needs of large-scale interconnected grid cross-regional, cross-voltage level cooperative computing and ultra-large-scale power grid computing, the new generation of smart grid dispatching control system proposes an overall framework for distributed analysis and calculation of large power grids, and the power grid model is the basis of power system analysis and calculation. In this regard, it is necessary to develop a real-time sharing method of power grid models suitable for online distributed computing of large power grids, and provide a solution for the sharing of large power grid online distributed computing models under the multi-level collaborative dispatching mode.
国内关于模型信息全网共享已开展深入的研究。智能电网调度控制系统较好地推动了电网模型基础信息一体化共享,其中基于电网通用模型描述规范CIM/E和电力系统图形描述规CIM/G等标准的推广,在一定程度上提高了调控中心之间模型、图形等信息的共享程度。In-depth research has been carried out in China on the sharing of model information across the network. The smart grid dispatching control system has promoted the integration and sharing of the basic information of the grid model. Among them, the promotion of standards based on the general grid model description specification CIM/E and the power system graphic description specification CIM/G has improved the control center to a certain extent. The degree of information sharing between models, graphics, etc.
纵向方面,智能电网调度控制系统基于CIM/E的模型拼接技术目前在国、分、省调之间已经实现了220kV及以下电网模型的单向共享,但500kV及以上电网模型的反向共享还未实现,对大电网在线分析计算的支撑仍然有限,在分调、省调系统中可能出现对同一电网对象的差异化建模、重复工作等问题。另一方面,现有电网模型在各级调度中心采用集中式数据库进行存储,不能有效支撑新一代智能电网调度控制的大电网在线分布式计算总体架构。Vertically, the CIM/E-based model splicing technology of the smart grid dispatching control system has achieved one-way sharing of 220kV and below grid models among national, sub-, and provincial commissioners, but the reverse sharing of 500kV and above grid models has yet to be completed. It has not been realized, and the support for online analysis and calculation of large power grids is still limited. In the sub-dispatching and provincial dispatching systems, there may be problems such as differential modeling of the same power grid object and repeated work. On the other hand, the existing power grid model is stored in a centralized database at all levels of dispatching centers, which cannot effectively support the overall architecture of online distributed computing for large power grid dispatching control of the new generation of smart grid.
横向方面,智能电网调度控制系统已实现电网模型的源端维护和跨安全区共享功能,保证了在线电网模型在调度中心内部各安全区的完整性、一致性和及时性。但是在线模型与离线模型不一致等问题尚未解决,导致在线分析计算结果和离线分析计算结果不一致。Horizontally, the smart grid dispatch control system has realized the source end maintenance and cross-safety zone sharing functions of the grid model, ensuring the integrity, consistency and timeliness of the online grid model in each security zone within the dispatch center. However, the inconsistency between the online model and the offline model has not been solved, which leads to the inconsistency between the online analysis and offline analysis and calculation results.
综上所述,为响应大型互联电网跨区域、跨电压等级协作计算及超大规模电网计算的需求,为适应新一代智能电网调度控制系统提出的大电网在线分布式计算总体架构,需要面向电网模型的分布维护、分布存储和全网即时共享等问题提出新的解决方法。To sum up, in order to respond to the needs of large-scale interconnected grid cross-regional, cross-voltage level collaborative computing and ultra-large-scale grid computing, in order to adapt to the overall architecture of large-scale online distributed computing proposed by the new generation of smart grid dispatching control system, a grid-oriented model is required. Propose new solutions to problems such as distributed maintenance, distributed storage, and instant sharing of the entire network.
发明内容Contents of the invention
为了实现上述目的,本发明提供一种适用于电力系统分布式计算的电网模型共享方法,采用分布式实时数据库技术和分布式文件系统实现电网模型的分布维护和全网即时共享,提高各级调度电网模型更新的时效性,为多级协同调度模式下大电网在线分布式计算的电网模型共享问题提供解决方案。In order to achieve the above purpose, the present invention provides a power grid model sharing method suitable for distributed computing of power systems, which uses distributed real-time database technology and distributed file systems to realize distributed maintenance of power grid models and instant sharing of the entire network, improving dispatching at all levels The timeliness of power grid model update provides a solution to the power grid model sharing problem of large power grid online distributed computing under the multi-level collaborative dispatching mode.
本发明的目的是采用下述技术方案实现的:The object of the present invention is to adopt following technical scheme to realize:
一种适用于电力系统分布式计算的电网模型共享方法,所述方法包括:A power grid model sharing method suitable for distributed computing of a power system, the method comprising:
(1)构建适用于多级调度一体化分布式计算的电网物理模型;(1) Construct a physical model of the power grid suitable for multi-level dispatching integrated distributed computing;
(2)对分布式一体化电网模型依次进行局部和全局校验;并将校验通过的电网模型进行分布式存储及冗余备份;(2) Carry out local and global verification on the distributed integrated power grid model in turn; and perform distributed storage and redundant backup on the power grid model that has passed the verification;
(3)启用验证通过的电网物理模型;(3) Enable the verified physical model of the power grid;
(4)将大电网分布式网络拓扑分析功能和分布式状态估计功能集成到模型管理中心,根据应用的不同需求,访问电网物理模型和计算模型;其中,所述大电网分布式网络拓扑分析功能以电网物理模型为基础,读取电网实时运行状态并进行拓扑分析,建立电网计算模型。(4) Integrate the distributed network topology analysis function and distributed state estimation function of the large power grid into the model management center, and access the physical model and calculation model of the power grid according to different requirements of the application; wherein, the distributed network topology analysis function of the large power grid Based on the physical model of the power grid, read the real-time operating status of the power grid and perform topology analysis to establish a power grid calculation model.
优选的,所述步骤(1)具体包括:Preferably, the step (1) specifically includes:
步骤1-1:针对电网新增电力设备,使用分布式电网模型维护工具建立电力设备对象;Step 1-1: For the newly added power equipment in the power grid, use the distributed power grid model maintenance tool to create power equipment objects;
步骤1-2:为电力设备对象分配全网唯一ID编码;Step 1-2: Assign a unique ID code for the entire network to the electric equipment object;
步骤1-3:根据全网设备统一命名规范自动生成设备标准名称;Step 1-3: Automatically generate a standard name for the device according to the unified naming specification for the entire network;
步骤1-4:为电力设备对象分配全网唯一连接结点,最终形成适用于多级调度一体化分布式计算的电网物理模型。Steps 1-4: Assign the only connection node of the whole network to the power equipment object, and finally form a physical model of the power grid suitable for multi-level dispatching integrated distributed computing.
进一步地,所述步骤1-2包括:对电网模型设备标识按设备所属调度控制系统进行分段,具体为:将64位二进制设备标识进行分段,第0~23位标识记录在设备所属调度控制系统内的顺序号,24~31位标识设备所属调度控制系统,32~63位标识设备其他信息。Further, the step 1-2 includes: segmenting the grid model equipment identifier according to the dispatching control system to which the equipment belongs, specifically: segmenting the 64-bit binary equipment identifier, and recording the 0-23rd identifier in the dispatching control system to which the equipment belongs. Sequence number in the control system, 24-31 bits identify the dispatching control system to which the equipment belongs, and 32-63 bits identify other information of the equipment.
进一步地,所述步骤1-3包括:依据国标《电网物理模型描述与交换规范》对电网、调度机构、发电厂、变电站、线路、电压等级、间隔、站内电力设备和电网二次设备的命名进行规范;Further, the steps 1-3 include: naming the power grid, dispatching organization, power plant, substation, line, voltage level, interval, power equipment in the station and secondary equipment of the power grid according to the national standard "Grid Physical Model Description and Exchange Specification" To regulate;
分布式电网模型维护工具根据模型维护人员录入的设备所属电网、设备电压等级和设备基本名称等信息,依据《电网物理模型描述与交换规范》自动生成电网模型标准名称,实现电网模型在全网范围内的统一命名。The distributed grid model maintenance tool automatically generates the standard name of the grid model according to the information of the grid to which the equipment belongs, the voltage level of the equipment, and the basic name of the equipment entered by the model maintenance personnel, according to the "Grid Physical Model Description and Exchange Specification", and realizes the power grid model in the whole network. Unified naming within.
进一步地,所述步骤1-4包括:在全网范围内统一分配设备连接结点:对设备连接结点按结点所属调度控制系统进行分段,具体方法是将64位连接结点进行分段,第0~23位表示设备在所属调度控制系统内的连接结点,24~31位表示结点所属调度控制系统,32~63为预留位。Further, the steps 1-4 include: uniformly assigning device connection nodes within the entire network: segmenting the device connection nodes according to the dispatching control system to which the nodes belong, the specific method is to divide the 64-bit connection nodes In the segment, bits 0 to 23 indicate the connection node of the equipment in the dispatching control system to which it belongs, bits 24 to 31 indicate the dispatching control system to which the node belongs, and bits 32 to 63 are reserved bits.
优选的,所述步骤(2)具体包括:Preferably, said step (2) specifically includes:
步骤2-1:对分布式一体化电网模型进行校验;根据步骤1-4形成的设备连接结点,校验设备间连接关系的逻辑性,判断具有相同连接结点设备的所属厂站和站、电压等级是否相同;若相同,则校验通过,若不相同,则校验失败。Step 2-1: Verify the distributed integrated power grid model; verify the logic of the connection relationship between devices based on the device connection nodes formed in steps 1-4, and judge the plant and station that have the same connection node devices and Whether the stations and voltage levels are the same; if they are the same, the verification is passed; if not, the verification fails.
步骤2-2:电网模型入库存储;Step 2-2: The power grid model is put into storage;
确定电网模型所属调度区域,将电网模型就近存入带时标的分布式关系数据库;Determine the dispatching area to which the grid model belongs, and store the grid model in a distributed relational database with time scale nearby;
步骤2-3:电网模型异地冗余互备;Step 2-3: Off-site redundancy and mutual backup of the grid model;
根据电网模型的使用频率在不同调度控制系统中进行冗余互备。According to the frequency of use of the grid model, redundant mutual backup is carried out in different dispatching control systems.
进一步地,所述步骤2-3具体包括:对新增电网模型进行冗余备份,根据电网模型的分布式存储设计,定义电网模型存储的最小单元为一个电力设备对象的描述;电网模型在所属调度区域的调度控制系统中就近存储;同时按照模型使用频率,在相邻电网调度中心或上下级调度中心形成备份存储,备份系数在2~3之间;Further, the steps 2-3 specifically include: performing redundant backup on the newly added power grid model, and defining the minimum storage unit of the power grid model as a description of a power equipment object according to the distributed storage design of the power grid model; The dispatching control system in the dispatching area is stored nearby; at the same time, according to the frequency of use of the model, a backup storage is formed in the adjacent power grid dispatching center or the upper and lower dispatching centers, and the backup factor is between 2 and 3;
各调度机构将本调度管辖范围内电网模型在备用调度控制系统中进行备份存储,全网调度机构备用调度系统的电网模型,获取电网模型备份数据。Each dispatching organization backs up and stores the power grid model within the dispatching jurisdiction in the backup dispatching control system, and the whole network dispatching organization obtains the backup data of the power grid model from the grid model of the backup dispatching system.
优选的,所述步骤(3)启用验证通过的电网物理模型包括:从分布式关系数据库分发至调度控制系统各应用的分布式实时数据库。Preferably, the step (3) enabling the verified physical model of the power grid includes: distributing from the distributed relational database to the distributed real-time database of each application of the dispatch control system.
优选的,所述步骤(4)中,访问电网物理模型具体包括:Preferably, in the step (4), accessing the physical model of the grid specifically includes:
4-1用户或应用程序向模型管理中心提交电网物理模型访问请求;包括模型范围、模型版本、模型访问返回方式;4-1 The user or application program submits a request for access to the physical model of the power grid to the model management center; including the model scope, model version, and model access return method;
4-2模型管理中心根据请求,检查用户或应用程序是否具备模型访问权限:若具备该权限,则将请求递交至模型存储中心;若不具备,则向用户或应用程序返回不具备模型访问权限消息;4-2 The model management center checks whether the user or application has the model access permission according to the request: if it has the permission, it will submit the request to the model storage center; if not, it will return to the user or application that it does not have the model access permission information;
4-3模型存储中心根据相关控制参数,从分布式数据库系统中提取相应范围和版本的电网物理模型,根据输入参数将电网物理模型返回至分布式实时数据库或返回电网物理模型交互文件CIM/E。4-3 The model storage center extracts the corresponding scope and version of the grid physical model from the distributed database system according to the relevant control parameters, and returns the grid physical model to the distributed real-time database or returns the grid physical model interaction file CIM/E according to the input parameters .
优选的,所述步骤(4)中,访问计算模型具体包括:Preferably, in the step (4), accessing the calculation model specifically includes:
4-4用户或应用程序向模型管理中心提交电网物理模型访问请求;请求信息包括模型类型、模型范围、模型版本和模型访问返回方式;其中,所述返回方式,包括返回分布式实时数据库和返回计算模型交互文件QS;4-4 The user or application program submits a request for accessing the physical model of the power grid to the model management center; the request information includes the model type, model scope, model version, and model access return method; wherein, the return method includes returning to the distributed real-time database and returning Calculation model interaction file QS;
4-5检验模型访问权限:模型管理中心的模型管理平台根据请求,检查用户或应用程序是否具备模型访问权限,若具备,则将请求递交至模型存储中心;若不具备,则向用户或应用程序返回不具备模型访问权限消息;4-5 Verify model access rights: The model management platform of the model management center checks whether the user or application has model access rights according to the request, and if yes, submits the request to the model storage center; if not, then sends the request to the user or application The program returns the message that it does not have access to the model;
4-6访问计算模型,判断请求访问的计算模型版本;所述计算模型,包括请求实时计算模型和历史计算模型。4-6 Accessing the calculation model, judging the version of the calculation model requested for access; the calculation model includes the requested real-time calculation model and the historical calculation model.
进一步地,所述步骤4-6中,访问请求实时Further, in the step 4-6, the access request is real-time
计算模型包括:Computational models include:
a)根据模型获取范围,从分布式实时数据库中访问相应的计算模型;a) According to the scope of model acquisition, access the corresponding calculation model from the distributed real-time database;
b)根据返回参数,将计算模型返回至分布式实时数据库或通过QS文件转实时库接口返回计算模型交互文件QS;b) According to the return parameters, return the calculation model to the distributed real-time database or return the calculation model interaction file QS through the QS file to real-time library interface;
访问请求历史计算模型包括:The access request historical calculation model includes:
c)根据模型访问范围,从分布式文件系统中访问相应计算模型交互文件QS;c) Access the corresponding calculation model interaction file QS from the distributed file system according to the model access scope;
d)根据返回参数,将QS文件发送至用户或通过QS文件转实时库接口返回分布式实时数据库。d) According to the returned parameters, send the QS file to the user or return the distributed real-time database through the QS file-to-real-time library interface.
与最接近的现有技术相比,本发明达到的有益效果为:Compared with the closest prior art, the beneficial effect that the present invention reaches is:
本发明将先进IT技术应用于电力系统,有效提高电网模型共享效率。The invention applies the advanced IT technology to the power system, effectively improving the sharing efficiency of the grid model.
采用分布式实时数据库和分布式文件系统分别存储实时态和历史态电网模型,实现全网模型实时共享。采用分布式实时数据库存储实时电网模型,模型更新局部数据库即可在全网范围查询、调阅和访问,省去当前智能调度控制系统采用的模型拼接环节,提高电网模型共享效率,有效支撑电力系统分布式计算。A distributed real-time database and a distributed file system are used to store real-time and historical power grid models respectively to realize real-time sharing of the whole network model. The distributed real-time database is used to store the real-time power grid model, and the model can be updated in the local database to query, read and access the entire network, eliminating the need for model splicing links used in the current intelligent dispatching control system, improving the sharing efficiency of the power grid model, and effectively supporting the power system. Distributed Computing.
将大电网分布式拓扑分析功能集成到模型管理中心,为大电网在线分析提供“计算模型”基础。本专利结合电力系统在线分析计算以“电网计算模型”为基础这一特点,将大电网分布式拓扑分析功能集成到模型管理中心,为大电网在线分析应用提供实时态和历史态的“计算模型”服务。Integrate the distributed topology analysis function of the large power grid into the model management center to provide a "calculation model" basis for the online analysis of the large power grid. This patent combines the characteristics that the online analysis and calculation of the power system is based on the "power grid calculation model", integrates the distributed topology analysis function of the large power grid into the model management center, and provides real-time and historical "computation models" for the online analysis and application of the large power grid "Serve.
附图说明Description of drawings
图1为适用于电力系统分布式计算的电网模型共享流程;Figure 1 is a grid model sharing process suitable for distributed computing of power systems;
图2为物理模型访问方法流程图;Fig. 2 is a flow chart of a physical model access method;
图3为计算模型访问方法流程图;Fig. 3 is a flow chart of a calculation model access method;
图4为同步的调度系统的0-31位设备标识示意图;Fig. 4 is a schematic diagram of 0-31 bit device identification of a synchronous scheduling system;
图5为同步的调度系统的24-31位设备标识示意图;Fig. 5 is a schematic diagram of the 24-31 bit device identification of the synchronous scheduling system;
图6为同级电网间联络线模型维护流程图。Figure 6 is a flow chart of maintenance of the tie line model between power grids at the same level.
具体实施方式detailed description
以下将结合附图,对本发明的具体实施方式作进一步的详细说明。The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings.
大电网在线分布式计算模式下,各级调度中心保留现有模型维护职责和维护范围,对调度管辖权范围内的电网模型进行分布式维护,模型维护流程主要包括模型分布式编辑、模型校验、模型入库、模型启用和模型备份等。如图1所示,In the online distributed computing mode of the large power grid, the dispatch centers at all levels retain the existing model maintenance responsibilities and maintenance scope, and perform distributed maintenance on the power grid model within the dispatch jurisdiction. The model maintenance process mainly includes model distributed editing and model verification. , model storage, model activation and model backup, etc. As shown in Figure 1,
一种适用于电力系统分布式计算的电网模型共享方法,所述方法包括:A power grid model sharing method suitable for distributed computing of a power system, the method comprising:
(1)提供分布式电网模型维护工具,该工具针对电网中改造或新增的电力设备,建立电网模型设备对象,全网范围统一分配设备ID、统一进行设备命名,以及统一分配设备连接结点,构建适用于多级调度一体化分布式计算的电网物理模型;(1) Provide a distributed power grid model maintenance tool, which establishes power grid model equipment objects for the transformed or newly added power equipment in the power grid, uniformly allocates equipment IDs, uniformly names equipment, and uniformly allocates equipment connection nodes in the entire network , to build a physical model of the power grid suitable for multi-level dispatching integrated distributed computing;
具体包括:步骤1-1:针对电网新增电力设备,使用分布式电网模型维护工具建立电力设备对象;Specifically include: Step 1-1: For new electric equipment in the grid, use the distributed grid model maintenance tool to establish the electric equipment object;
步骤1-2:为电力设备对象分配全网唯一ID编码;具体为:对电网模型设备标识按设备所属调度控制系统进行分段,具体为:将64位二进制设备标识进行分段,第0~23位标识记录在设备所属调度控制系统内的顺序号,24~31位标识设备所属调度控制系统,32~63位标识设备其他信息,如设备类型等。利用该方法能够保证设备标识在全网范围唯一,便于电网模型在各调度控制系统之间同步。Step 1-2: Assign a unique ID code for the entire network to the power equipment object; specifically: segment the equipment identification of the power grid model according to the dispatching control system to which the equipment belongs, specifically: segment the 64-bit binary equipment identification, 0~ 23 bits identify the sequence number recorded in the dispatching control system to which the equipment belongs, 24 to 31 bits identify the dispatching control system to which the equipment belongs, and 32 to 63 bits identify other information of the equipment, such as equipment type, etc. Using this method can ensure that the equipment identification is unique in the whole network, and facilitate the synchronization of the power grid model among various dispatching control systems.
原有的设备分段标识在64位二进制表示的设备标识中,0到31位:表示记录顺序号,如图4所示。The original device segment identifier is in the device identifier expressed in 64-bit binary, 0 to 31 bits: indicates the record sequence number, as shown in Figure 4.
在设备分段标识的实现上,对原有LONG(长整型)的设备标识进行分段,在64位二进制表示的设备标识中,利用24-31位来表示设备所属调度系统,如图5所示。具体如下:0到23位:表示记录顺序号,24到31位表示记录所属调度系统;例如,000001表示该设备属于调度系统;A,000010表示该设备属于调度系统;B,000011表示该设备属于调度系统;C,000100表示该设备属于调度系统D。32到63位:表示保持原有的设备分段标识含义不变。In the realization of equipment segmentation identification, the original LONG (long integer) equipment identification is segmented, and in the equipment identification of 64-bit binary representation, 24-31 bits are used to indicate the scheduling system to which the equipment belongs, as shown in Figure 5 shown. The details are as follows: Bits 0 to 23: indicate the sequence number of the record, bits 24 to 31 indicate the dispatching system to which the record belongs; for example, 000001 indicates that the device belongs to the dispatching system; A, 000010 indicates that the device belongs to the dispatching system; B, 000011 indicates that the device belongs to Dispatch system; C, 000100 indicates that the device belongs to dispatch system D. Bits 32 to 63: Indicates that the meaning of the original device segment identifier remains unchanged.
采用模型对象区域分段后,无需进行统一的跨系统模型维护工作,各个调度系统独立维护各自管辖的电网模型,然后同步到其他系统中;采用唯一性标识以及物理一致性存储的方式,不需要额外的拼接转换等流程,不需要人工干预,可实现电网模型在全系统的自动即时同步。这种方式不但符合调度系统常见的模型维护形式,并且支持各个系统的并发操作,模型维护效率高。After the model object area is segmented, there is no need for unified cross-system model maintenance, and each dispatching system independently maintains the power grid model under its jurisdiction, and then synchronizes it to other systems; using unique identification and physical consistency storage, no need Additional processes such as splicing and conversion do not require manual intervention, and can realize automatic and real-time synchronization of the grid model in the whole system. This method not only conforms to the common model maintenance form of the scheduling system, but also supports concurrent operations of various systems, and the model maintenance efficiency is high.
步骤1-3:根据全网设备统一命名规范自动生成设备标准名称;具体为:依据国标《电网物理模型描述与交换规范》对电网、调度机构、发电厂、变电站、线路、电压等级、间隔、站内电力设备和电网二次设备的命名进行规范;Step 1-3: Automatically generate equipment standard names according to the uniform naming convention for equipment in the entire network; specifically: according to the national standard "Grid Physical Model Description and Exchange Specifications" for power grids, dispatching agencies, power plants, substations, lines, voltage levels, intervals, Standardize the naming of power equipment in the station and secondary equipment of the power grid;
分布式电网模型维护工具根据模型维护人员录入的设备所属电网、设备电压等级和设备基本名称等信息,依据《电网物理模型描述与交换规范》自动生成电网模型标准名称,实现电网模型在全网范围内的统一命名。The distributed grid model maintenance tool automatically generates the standard name of the grid model according to the information of the grid to which the equipment belongs, the voltage level of the equipment, and the basic name of the equipment entered by the model maintenance personnel, according to the "Grid Physical Model Description and Exchange Specification", and realizes the power grid model in the whole network. Unified naming within.
步骤1-4:为电力设备对象分配全网唯一连接结点,最终形成适用于多级调度一体化分布式计算的电网物理模型。具体为:在全网范围内统一分配设备连接结点:对设备连接结点按结点所属调度控制系统进行分段,具体方法是将64位连接结点进行分段,第0~23位表示设备在所属调度控制系统内的连接结点,24~31位表示结点所属调度控制系统,32~63为预留位。利用该方法能够保证设备连接结点在全网范围唯一,便于电网模型在各调度控制系统之间同步。Steps 1-4: Assign the only connection node of the whole network to the power equipment object, and finally form a physical model of the power grid suitable for multi-level dispatching integrated distributed computing. Specifically: uniformly allocate equipment connection nodes within the entire network: segment equipment connection nodes according to the dispatching control system to which the nodes belong. The specific method is to segment 64-bit connection nodes, and bits 0 to 23 indicate For the connection node of the equipment in the dispatching control system to which it belongs, bits 24 to 31 represent the dispatching control system to which the node belongs, and bits 32 to 63 are reserved. Using this method can ensure that the equipment connection node is unique in the whole network, and facilitate the synchronization of the power grid model among various dispatching control systems.
通常情况,同级电网间在边界节点通过联络线相连,上下级电网调度间边界节点设置在变压器高压侧或中低压侧。边界节点电网模型对联络线两端或变压器不同侧调度机构的电力系统分析计算都具有重要意义,本专利介绍的模型维护包含边界节点电网模型维护方法。如图6所示:以同级电网边界节点间联络线建模为例说明,步骤如下:Usually, the grids of the same level are connected through tie lines at the boundary nodes, and the boundary nodes between the dispatching of the upper and lower grids are set on the high voltage side or the medium and low voltage side of the transformer. The grid model of the boundary node is of great significance to the analysis and calculation of the power system at both ends of the tie line or the dispatching mechanism on different sides of the transformer. The model maintenance introduced in this patent includes the maintenance method of the grid model of the boundary node. As shown in Figure 6: Taking the modeling of tie lines between boundary nodes of the same level power grid as an example, the steps are as follows:
步骤1:区域电网间新增联络线,由设备所属调度机构启动联络线本端(以下简称A端)模型编辑,对联络线进行建模、录入设备电气参数,对边界厂站对新增设备分配连接结点;Step 1: To add a connection line between regional power grids, the dispatching agency to which the equipment belongs starts the model editing of the local end of the connection line (hereinafter referred to as the A end), models the connection line, enters the electrical parameters of the equipment, and adds equipment to the boundary plant Assign connection nodes;
步骤2:启动局部模型校验,通过后入数据库,将A端电网模型提交模型管理中心,同时向模型管理中心提交联络线对端(以下简称B端)模型编辑请求。Step 2: Start the local model verification, and submit the A-end power grid model to the model management center through post-entry database, and at the same time submit the model editing request of the connection line peer (hereinafter referred to as B-end) to the model management center.
步骤3:模型管理中心向B端调度中心发出模型编辑指令,B端调度机构接收模型编辑指令,启动模型编辑、分配连接结点以及局部模型校验,通过后返回模型管理中心B端电网模型。Step 3: The model management center sends a model editing command to the B-side dispatching center, and the B-side dispatching agency receives the model editing command, starts model editing, assigns connection nodes and local model verification, and returns to the B-side power grid model of the model management center after passing.
步骤4:模型管理中心通知A端和B端调度机构模型编辑已完成,由A端和B端调度机构启用模型。Step 4: The model management center notifies the A-side and B-side scheduling agencies that the model editing has been completed, and the A-side and B-side scheduling agencies activate the model.
步骤5:A端和B端调度机构对新增电网模型进行备份。Step 5: The A-side and B-side dispatching agencies back up the newly added power grid model.
同理,上下级调度机构间边界节点模型维护流程与同级电网间边界节点模型维护流程相同。Similarly, the maintenance process of the boundary node model between the upper and lower dispatching agencies is the same as that of the boundary node model maintenance process between the power grids at the same level.
(2)对分布式一体化电网模型依次进行局部和全局校验;并将校验通过的电网模型进行分布式存储及冗余备份;为保障电网模型的数据安全,对新增电网模型进行冗余备份。根据全网模型的分布式存储设计,电网模型存储的最小单元是一个电力设备对象的描述,如一个断路器、一条母线、一条线路、一个线路端点、一台变压器、一个变压器绕组等。电网模型在所属调度中心就近存储,同时,按照模型使用频率,在相邻电网调度中心或上下级调度中心形成备份存储,备份系数在2~3之间,既能保证数据存储的可靠性,又不至于占用过多的IT资源。(2) Carry out local and global verification on the distributed integrated power grid model in turn; perform distributed storage and redundant backup on the power grid model that has passed the verification; in order to ensure the data security of the power grid model, redundant I backup. According to the distributed storage design of the whole network model, the smallest unit of grid model storage is the description of a power equipment object, such as a circuit breaker, a busbar, a line, a line end point, a transformer, a transformer winding, etc. The power grid model is stored in the nearby dispatching center. At the same time, according to the frequency of use of the model, a backup storage is formed in the adjacent power grid dispatching center or the upper and lower dispatching centers. The backup factor is between 2 and 3, which can not only ensure the reliability of data storage, but also Will not take up too much IT resources.
此外,为满足备用调度控制系统分析计算的模型需求,各调度机构将本调度管辖范围内电网模型在备用调度系统中进行备份存储,全网调度机构备用调度系统的电网模型组成一个完整的电网模型备份。In addition, in order to meet the model requirements for the analysis and calculation of the backup dispatching control system, each dispatching agency stores the power grid model within the jurisdiction of the dispatching system in the backup dispatching system, and the grid model of the backup dispatching system of the whole network dispatching agency constitutes a complete grid model backup.
步骤2-1:对分布式一体化电网模型进行校验;根据步骤1-4形成的设备连接结点,校验设备间连接关系的逻辑性,判断具有相同连接结点设备的所属厂站和站、电压等级是否相同;若相同,则校验通过,若不相同,则校验失败。Step 2-1: Verify the distributed integrated power grid model; verify the logic of the connection relationship between devices based on the device connection nodes formed in steps 1-4, and judge the plant and station that have the same connection node devices and Whether the stations and voltage levels are the same; if they are the same, the verification is passed; if not, the verification fails.
步骤2-2:电网模型入库存储;Step 2-2: The power grid model is put into storage;
确定电网模型所属调度区域,将电网模型就近存入带时标的分布式关系数据库;Determine the dispatching area to which the grid model belongs, and store the grid model in a distributed relational database with time scale nearby;
步骤2-3:电网模型异地冗余互备;根据电网模型的使用频率在不同调度控制系统中进行冗余互备。根据电网模型的使用频率在不同调度控制系统中进行冗余互备,提高模型数据安全。具体为:对新增电网模型进行冗余备份,根据电网模型的分布式存储设计,定义电网模型存储的最小单元为一个电力设备对象的描述;电网模型在所属调度区域的调度控制系统中就近存储;同时按照模型使用频率,在相邻电网调度中心或上下级调度中心形成备份存储,备份系数在2~3之间;Step 2-3: Redundancy and mutual backup of the power grid model in different places; redundant mutual backup in different dispatching control systems according to the frequency of use of the grid model. According to the frequency of use of the power grid model, redundancy and mutual backup are carried out in different dispatching control systems to improve model data security. Specifically: redundant backup of the newly added grid model, according to the distributed storage design of the grid model, the smallest storage unit of the grid model is defined as a description of a power equipment object; the grid model is stored nearby in the dispatching control system of the dispatching area ;At the same time, according to the frequency of use of the model, a backup storage is formed in the adjacent power grid dispatching center or the upper and lower dispatching centers, and the backup factor is between 2 and 3;
各调度机构将本调度管辖范围内电网模型在备用调度控制系统中进行备份存储,全网调度机构备用调度系统的电网模型,获取电网模型备份数据。Each dispatching organization backs up and stores the power grid model within the dispatching jurisdiction in the backup dispatching control system, and the whole network dispatching organization obtains the backup data of the power grid model from the grid model of the backup dispatching system.
(3)启用验证通过的电网物理模型;从分布式关系数据库分发至调度控制系统各应用的分布式实时数据库。(3) Enable the verified physical model of the power grid; distribute from the distributed relational database to the distributed real-time database of each application of the dispatch control system.
(4)将大电网分布式网络拓扑分析功能和分布式状态估计功能集成到模型管理中心,根据应用的不同需求,访问电网物理模型和计算模型;其中,所述大电网分布式网络拓扑分析功能以电网物理模型为基础,读取电网实时运行状态并进行拓扑分析,建立电网计算模型。(4) Integrate the distributed network topology analysis function and distributed state estimation function of the large power grid into the model management center, and access the physical model and calculation model of the power grid according to different requirements of the application; wherein, the distributed network topology analysis function of the large power grid Based on the physical model of the power grid, read the real-time operating status of the power grid and perform topology analysis to establish a power grid calculation model.
步骤(4)中,如图2所示,访问电网物理模型具体包括:In step (4), as shown in Figure 2, accessing the physical model of the power grid specifically includes:
4-1用户或应用程序向模型管理中心提交电网物理模型访问请求;包括模型范围、模型版本、模型访问返回方式;4-1 The user or application program submits a request for access to the physical model of the power grid to the model management center; including the model scope, model version, and model access return method;
4-2模型管理中心根据请求,检查用户或应用程序是否具备模型访问权限:若具备该权限,则将请求递交至模型存储中心;若不具备,则向用户或应用程序返回不具备模型访问权限消息;4-2 The model management center checks whether the user or application has the model access permission according to the request: if it has the permission, it will submit the request to the model storage center; if not, it will return to the user or application that it does not have the model access permission information;
4-3模型存储中心根据相关控制参数,从分布式数据库系统中提取相应范围和版本的电网物理模型,根据输入参数将电网物理模型返回至分布式实时数据库或返回电网物理模型交互文件CIM/E。4-3 The model storage center extracts the corresponding scope and version of the grid physical model from the distributed database system according to the relevant control parameters, and returns the grid physical model to the distributed real-time database or returns the grid physical model interaction file CIM/E according to the input parameters .
如图3所示,访问计算模型具体包括:As shown in Figure 3, the access computing model specifically includes:
4-4用户或应用程序向模型管理中心提交电网物理模型访问请求;请求信息包括模型类型、模型范围、模型版本和模型访问返回方式;其中,所述返回方式,包括返回分布式实时数据库和返回计算模型交互文件QS;4-4 The user or application program submits a request for accessing the physical model of the power grid to the model management center; the request information includes the model type, model scope, model version, and model access return method; wherein, the return method includes returning to the distributed real-time database and returning Calculation model interaction file QS;
4-5检验模型访问权限:模型管理中心的模型管理平台根据请求,检查用户或应用程序是否具备模型访问权限,若具备,则将请求递交至模型存储中心;若不具备,则向用户或应用程序返回不具备模型访问权限消息;4-5 Verify model access rights: The model management platform of the model management center checks whether the user or application has model access rights according to the request, and if yes, submits the request to the model storage center; if not, then sends the request to the user or application The program returns a message that it does not have access to the model;
4-6访问计算模型,判断请求访问的计算模型版本;所述计算模型,包括请求实时计算模型和历史计算模型。4-6 Accessing the calculation model, judging the version of the calculation model requested for access; the calculation model includes the requested real-time calculation model and the historical calculation model.
在线分析各功能模块以电网计算模型为计算基础,对此,将大电网分布式网络拓扑分析功能和分布式状态估计功能集成到模型中心,面向大电网在线分布式计算提供丰富、可靠的计算模型服务。The online analysis of each functional module is based on the power grid computing model. For this, the distributed network topology analysis function and distributed state estimation function of the large power grid are integrated into the model center to provide a rich and reliable computing model for the online distributed computing of the large power grid. Serve.
全网状态估计采用大电网广域分布式计算模式,将各调度中心基于调度管辖范围内的分布式状态估计有机整合,实现全网一体化状态估计,国调和国调分中心不单独进行集中式全网状态估计。由于充分利用各级调度的计算资源,全网一体化状态估计计算任务有效分解,可缩短全网状态估计执行周期,提高在线分析应用基态运行方式数据和计算模型的时效性。The state estimation of the whole network adopts the wide-area distributed computing mode of the large power grid, organically integrates the distributed state estimation of each dispatching center based on the dispatching jurisdiction, and realizes the integrated state estimation of the whole network. Network state estimation. Due to the full use of computing resources at all levels of scheduling, the network-wide integrated state estimation calculation tasks are effectively decomposed, which can shorten the execution cycle of the network-wide state estimation, and improve the timeliness of online analysis and application of base state operating mode data and calculation models.
在线分析其他软件根据计算任务需求,获取相应范围内的物理模型或计算模型,以及与之对应的状态估计数据,采用合理计算规模,提高分析计算效率。如省电力公司计划检修某220kV非区域联络线,利用调度员潮流计算停电潮流转移及分布情况、分析电网安全,用户只需提取省电力公司调度范围内的计算模型和状态估计数据即可满足潮流计算需要。Online analysis of other software According to the requirements of calculation tasks, obtain physical models or calculation models within the corresponding range, as well as corresponding state estimation data, adopt reasonable calculation scale, and improve analysis and calculation efficiency. For example, the provincial power company plans to overhaul a 220kV non-regional connection line, and uses the power flow of the dispatcher to calculate the transfer and distribution of power outages and analyze the safety of the power grid. The user only needs to extract the calculation model and state estimation data within the dispatching range of the provincial power company to meet the power flow requirements. Computational needs.
与物理模型提取服务类似,计算模型提取服务支持用户选择计算模型范围、模型时间和模型返回方式等指令参数。其中计算模型返回方式包括返回分布式实时数据库和返回计算模型交互文件QS两种方式。Similar to the physical model extraction service, the calculation model extraction service supports users to select instruction parameters such as calculation model range, model time, and model return method. The computing model return methods include returning to the distributed real-time database and returning to the computing model interactive file QS.
步骤4-6中,访问请求实时计算模型包括:In steps 4-6, the real-time calculation model of the access request includes:
a)根据模型获取范围,从分布式实时数据库中访问相应的计算模型;a) According to the scope of model acquisition, access the corresponding calculation model from the distributed real-time database;
b)根据返回参数,将计算模型返回至分布式实时数据库或通过QS文件转实时库接口返回计算模型交互文件QS;b) According to the return parameters, return the calculation model to the distributed real-time database or return the calculation model interaction file QS through the QS file to real-time library interface;
访问请求历史计算模型包括:The access request historical calculation model includes:
c)根据模型访问范围,从分布式文件系统中访问相应计算模型交互文件QS;c) According to the model access range, access the corresponding calculation model interaction file QS from the distributed file system;
d)根据返回参数,将QS文件发送至用户或通过QS文件转实时库接口返回分布式实时数据库32~63为预留位。利用该方法能够保证设备连接结点在全网范围唯一,便于电网模型在各调度控制系统之间同步。d) According to the returned parameters, send the QS file to the user or return the distributed real-time database 32 to 63 through the QS file-to-real-time database interface as reserved places. Using this method can ensure that the equipment connection node is unique in the whole network, and facilitate the synchronization of the power grid model among various dispatching control systems.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,所属领域的普通技术人员参照上述实施例依然可以对本发明的具体实施方式进行修改或者等同替换,这些未脱离本发明精神和范围的任何修改或者等同替换,均在申请待批的本发明的权利要求保护范围之内。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Those of ordinary skill in the art can still modify or equivalently replace the specific implementation methods of the present invention with reference to the above embodiments. Any modifications or equivalent replacements departing from the spirit and scope of the present invention are within the protection scope of the claims of the pending application of the present invention.
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510906219.2A CN105447175A (en) | 2015-12-09 | 2015-12-09 | Power grid model sharing method applicable to distributed computation of power system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510906219.2A CN105447175A (en) | 2015-12-09 | 2015-12-09 | Power grid model sharing method applicable to distributed computation of power system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105447175A true CN105447175A (en) | 2016-03-30 |
Family
ID=55557351
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510906219.2A Pending CN105447175A (en) | 2015-12-09 | 2015-12-09 | Power grid model sharing method applicable to distributed computation of power system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105447175A (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106067071A (en) * | 2016-05-27 | 2016-11-02 | 国网陕西省电力公司经济技术研究院 | A kind of multi-state Model management method based on segment encoding |
| CN107229525A (en) * | 2017-04-27 | 2017-10-03 | 国电南瑞科技股份有限公司 | A kind of power system device model keyword generation method based on Zookeeper |
| CN107658879A (en) * | 2017-10-26 | 2018-02-02 | 南方电网科学研究院有限责任公司 | A Safety Analysis System of Power System |
| WO2018053947A1 (en) * | 2016-09-22 | 2018-03-29 | 国电南瑞科技股份有限公司 | Peer-to-peer mutual backup method suitable for multi-region integrated control of power grid |
| CN108334572A (en) * | 2018-01-19 | 2018-07-27 | 全球能源互联网研究院有限公司 | A kind of power network topology analysis automotive engine system and method based on chart database |
| CN109840645A (en) * | 2017-11-27 | 2019-06-04 | 中国电力科学研究院有限公司 | A kind of the whole network real-time model sharing method and system towards multi-stage scheduling |
| CN112181715A (en) * | 2019-07-02 | 2021-01-05 | 国网江苏省电力有限公司溧阳市供电分公司 | Visual backup and comparison method based on distribution network automation system model |
| CN113191733A (en) * | 2021-04-30 | 2021-07-30 | 金坤建设集团有限公司 | Project multi-party collaborative management system and method based on Internet |
| CN114374701A (en) * | 2021-12-06 | 2022-04-19 | 福建亿榕信息技术有限公司 | Transparent sharing device of multistage linkage artificial intelligence platform sample model |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102324784A (en) * | 2011-06-09 | 2012-01-18 | 山东电力集团公司 | A grid model splicing method based on unified coding |
| CN102915337A (en) * | 2012-09-18 | 2013-02-06 | 中国电力科学研究院 | A Hierarchical Management Method of Multilevel Power Grid Fine Model Based on Variation Mode |
| CN103577938A (en) * | 2013-11-15 | 2014-02-12 | 国家电网公司 | Power grid dispatching automation main-and-standby system model synchronizing method and synchronizing system thereof |
| CN103607466A (en) * | 2013-11-27 | 2014-02-26 | 国家电网公司 | Wide-area multi-stage distributed parallel grid analysis method based on cloud computing |
| CN104123443A (en) * | 2014-07-09 | 2014-10-29 | 国家电网公司 | General and quick access method for power distribution network operating data and power distribution data of electric system |
| CN104156835A (en) * | 2014-09-04 | 2014-11-19 | 国家电网公司 | Wide-area distributed integrated topology analysis method for large power grid |
| US8903559B2 (en) * | 2011-04-01 | 2014-12-02 | International Business Machines Corporation | Energy grid device commissioning |
| CN104636084A (en) * | 2015-01-21 | 2015-05-20 | 广东电网有限责任公司电力科学研究院 | Device and method for carrying out reasonable and efficient distributive storage on big power data |
-
2015
- 2015-12-09 CN CN201510906219.2A patent/CN105447175A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8903559B2 (en) * | 2011-04-01 | 2014-12-02 | International Business Machines Corporation | Energy grid device commissioning |
| CN102324784A (en) * | 2011-06-09 | 2012-01-18 | 山东电力集团公司 | A grid model splicing method based on unified coding |
| CN102915337A (en) * | 2012-09-18 | 2013-02-06 | 中国电力科学研究院 | A Hierarchical Management Method of Multilevel Power Grid Fine Model Based on Variation Mode |
| CN103577938A (en) * | 2013-11-15 | 2014-02-12 | 国家电网公司 | Power grid dispatching automation main-and-standby system model synchronizing method and synchronizing system thereof |
| CN103607466A (en) * | 2013-11-27 | 2014-02-26 | 国家电网公司 | Wide-area multi-stage distributed parallel grid analysis method based on cloud computing |
| CN104123443A (en) * | 2014-07-09 | 2014-10-29 | 国家电网公司 | General and quick access method for power distribution network operating data and power distribution data of electric system |
| CN104156835A (en) * | 2014-09-04 | 2014-11-19 | 国家电网公司 | Wide-area distributed integrated topology analysis method for large power grid |
| CN104636084A (en) * | 2015-01-21 | 2015-05-20 | 广东电网有限责任公司电力科学研究院 | Device and method for carrying out reasonable and efficient distributive storage on big power data |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106067071A (en) * | 2016-05-27 | 2016-11-02 | 国网陕西省电力公司经济技术研究院 | A kind of multi-state Model management method based on segment encoding |
| CN106067071B (en) * | 2016-05-27 | 2020-01-10 | 国网陕西省电力公司经济技术研究院 | Multi-state model management method based on segmented coding |
| WO2018053947A1 (en) * | 2016-09-22 | 2018-03-29 | 国电南瑞科技股份有限公司 | Peer-to-peer mutual backup method suitable for multi-region integrated control of power grid |
| CN107229525A (en) * | 2017-04-27 | 2017-10-03 | 国电南瑞科技股份有限公司 | A kind of power system device model keyword generation method based on Zookeeper |
| CN107658879A (en) * | 2017-10-26 | 2018-02-02 | 南方电网科学研究院有限责任公司 | A Safety Analysis System of Power System |
| CN109840645A (en) * | 2017-11-27 | 2019-06-04 | 中国电力科学研究院有限公司 | A kind of the whole network real-time model sharing method and system towards multi-stage scheduling |
| CN108334572A (en) * | 2018-01-19 | 2018-07-27 | 全球能源互联网研究院有限公司 | A kind of power network topology analysis automotive engine system and method based on chart database |
| WO2019140878A1 (en) * | 2018-01-19 | 2019-07-25 | 全球能源互联网研究院有限公司 | Graph database-based electric grid topology analysis engine system and method |
| CN112181715A (en) * | 2019-07-02 | 2021-01-05 | 国网江苏省电力有限公司溧阳市供电分公司 | Visual backup and comparison method based on distribution network automation system model |
| CN113191733A (en) * | 2021-04-30 | 2021-07-30 | 金坤建设集团有限公司 | Project multi-party collaborative management system and method based on Internet |
| CN114374701A (en) * | 2021-12-06 | 2022-04-19 | 福建亿榕信息技术有限公司 | Transparent sharing device of multistage linkage artificial intelligence platform sample model |
| CN114374701B (en) * | 2021-12-06 | 2024-05-14 | 福建亿榕信息技术有限公司 | Transparent sharing device for sample model of multistage linkage artificial intelligent platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105447175A (en) | Power grid model sharing method applicable to distributed computation of power system | |
| CN112260331B (en) | Extra-high voltage alternating current-direct current power grid simulation platform and construction method | |
| CN102521398B (en) | Modeling method for substation-dispatching center two-level distributed type power grid | |
| CN103295163B (en) | Chart-model integrated transformer substation and dispatch master station cooperation modeling method | |
| CN101436790B (en) | On-line splicing and coalition method for electric network model containing complex T connection line | |
| CN108736465A (en) | A kind of future-state electric network model construction method and device | |
| CN108877368A (en) | A kind of grid simulation Training Methodology based on the application of more scenes | |
| CN109284346A (en) | A method and device for distribution network planning based on cloud computing | |
| CN109598377B (en) | AC/DC hybrid power distribution network robust planning method based on fault constraint | |
| CN102750606A (en) | Power grid scheduling cloud system | |
| CN103065217A (en) | Digital model splicing method of electric power setting calculating system | |
| CN102800033A (en) | An integrated system for power distribution production and marketing | |
| CN104504485A (en) | Integrative power system relay protection setting calculation method | |
| CN102867091A (en) | A Method for Incremental Correction of Power Flow Diagram | |
| CN105846473A (en) | Prefecture-county integration method based on intelligent power grid dispatching control system | |
| CN108879667B (en) | A power flow simulation method for closed-loop control of power grid | |
| CN103679557A (en) | Power grid operating mode data managing system based on C/S framework and achieving method for power grid operating mode data managing system | |
| CN104915794A (en) | Multi-time-state full-service unified modeling method based on model center | |
| CN115733756A (en) | A system and method for monitoring full data of distribution network based on artificial intelligence | |
| CN104881739A (en) | Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard | |
| CN104299051A (en) | Network system used for technical and economic analysis and comment of power grid project | |
| CN113344280A (en) | Power failure plan optimization model constraint construction method and device considering load transfer | |
| CN104463462A (en) | Power grid future state model maintenance tool | |
| CN102957206B (en) | Many granularities off-line model joining method of smart grid-oriented | |
| CN110033195A (en) | Adjust grid model splicing method to a kind of province based on CIM/CIS |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160330 |