CN103485753B - Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof - Google Patents

Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof Download PDF

Info

Publication number
CN103485753B
CN103485753B CN201310431975.5A CN201310431975A CN103485753B CN 103485753 B CN103485753 B CN 103485753B CN 201310431975 A CN201310431975 A CN 201310431975A CN 103485753 B CN103485753 B CN 103485753B
Authority
CN
China
Prior art keywords
pressure
steam
oil
injection
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310431975.5A
Other languages
Chinese (zh)
Other versions
CN103485753A (en
Inventor
张方礼
龚姚进
刘其成
赵庆辉
刘宝良
张勇
贾大雷
刘敬
蔡庆华
胡军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310431975.5A priority Critical patent/CN103485753B/en
Publication of CN103485753A publication Critical patent/CN103485753A/en
Application granted granted Critical
Publication of CN103485753B publication Critical patent/CN103485753B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了底水稠油油藏蒸汽驱二维比例物理模拟装置及其使用方法,所述装置包括注入单元、模型本体、底水温度控制单元、底水压力控制单元、模型保温单元、产出计量单元、数据采集与图像处理单元等7个部分。本发明用于探索底水油藏蒸汽驱油机理,认识油藏的底水对蒸汽驱开采效果影响,底水稠油油藏蒸汽驱的温度场发育特征、生产特征,指导底水稠油油藏蒸汽驱开发。

The invention discloses a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water and a use method thereof. The device includes an injection unit, a model body, a bottom water temperature control unit, a bottom water pressure control unit, a model heat preservation unit, a production There are 7 parts including measurement unit, data acquisition and image processing unit. The invention is used to explore the mechanism of steam flooding in bottom water reservoirs, understand the influence of bottom water in reservoirs on steam flooding, the temperature field development characteristics and production characteristics of steam flooding in heavy oil reservoirs with bottom water, and guide the production of heavy oil in bottom water. Tibetan steam flooding development.

Description

底水稠油油藏蒸汽驱二维比例物理模拟装置及其使用方法Two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoir with bottom water and its application method

技术领域technical field

本发明属于地球物理勘探领域,涉及物理勘探的数值处理及模拟技术,具体为一种底水稠油油藏蒸汽驱二维比例物理模拟装置及其使用方法。The invention belongs to the field of geophysical exploration, and relates to numerical processing and simulation technology of physical exploration, in particular to a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water and a method for using the same.

背景技术Background technique

稠油开采中常用的一种方法是注蒸汽热采,其中蒸汽吞吐是注蒸汽热采中的重要方式。蒸汽吞吐是向一口生产井短期内连续注入一定数量的蒸汽,关井数天后,再开井生产。由于蒸汽吞吐注汽时间短、见效快、经济效益好,国内外常把蒸汽吞吐作为蒸汽驱前的一种开采方式应用。注蒸汽热采的另一方式是蒸汽驱,将蒸汽注入到一口或多口井中,将地下粘度较大的稠油加热降粘,然后在蒸汽蒸馏的作用下,把原油驱向邻近多口生产井采出。蒸汽驱是目前应用较多的热采技术,它一定程度上克服了蒸汽吞吐加热半径有限的弱点,能够持续给地层提供热量,是蒸汽吞吐后提高采收率的有效方法之一。A commonly used method in heavy oil recovery is steam injection thermal recovery, in which steam huff and puff is an important method in steam injection thermal recovery. Steam huff and puff is to continuously inject a certain amount of steam into a production well in a short period of time, shut down the well for several days, and then start the well for production. Due to the short steam injection time, quick effect and good economic benefits, steam huff and puff is often used as a mining method before steam flooding at home and abroad. Another method of thermal recovery with steam injection is steam flooding. Steam is injected into one or more wells to heat the viscous heavy oil underground to reduce its viscosity. Then, under the action of steam distillation, the crude oil is driven to adjacent production wells. Well production. Steam flooding is currently the most widely used thermal recovery technology. It overcomes the weakness of the limited heating radius of steam huff and puff to a certain extent, and can continuously provide heat to the formation. It is one of the effective methods to enhance oil recovery after steam huff and puff.

我国大部分稠油属于热采技术的边际油藏,开发难度很大,主要体现在:油层埋藏深(主要在900m~1400m),不能保证井底高干度注汽;此外油层的边底水活跃,油藏吞吐降压易造成水淹,开发效果差。特别是,目前我国大部分稠油已进入蒸汽吞吐开发后期,处于低产低效阶段,边底水的影响更是巨大,因此亟待转换开发方式。Most of the heavy oil in my country belongs to the marginal oil reservoirs of thermal recovery technology, which is very difficult to develop, mainly reflected in: the deep burial of oil layers (mainly 900m ~ 1400m), the high dryness of the bottom of the well cannot be guaranteed for steam injection; in addition, the edge and bottom water of the oil layer Active, reservoir huffing and depressurization are likely to cause water flooding, and the development effect is poor. In particular, at present, most of the heavy oil in my country has entered the late stage of steam huff and puff development, and is in the low-yield and low-efficiency stage. The impact of edge and bottom water is even greater, so it is urgent to change the development method.

室内比例物理模拟研究是稠油注蒸汽热采油藏工程研究的重要内容之一,比例物理模型与油田原型之间在长度比、力比、速度比、温差比以及浓度差之比,都具有相同的数值。因而能准确的反映整个油藏或部分(单元)油藏中采油过程的动态特征和注入流体的波及效率特征,并广泛的应用于机理研究、优化井网配置、注采参数的指标及技术政策界限,预测现场实施效果,为油藏开发方案设计、现场合理实施提供可靠的依据。但是,现有的稠油油藏蒸汽驱比例物理模拟装置,在物理模拟实验存在着以下缺点或不足:Indoor proportional physical simulation research is one of the important contents of heavy oil steam injection thermal recovery reservoir engineering research. The ratio of length ratio, force ratio, velocity ratio, temperature difference ratio and concentration difference ratio between the ratio physical model and the oil field prototype has same value. Therefore, it can accurately reflect the dynamic characteristics of the oil production process and the sweep efficiency characteristics of the injected fluid in the entire reservoir or some (unit) reservoirs, and is widely used in mechanism research, optimization of well pattern configuration, indicators of injection-production parameters and technical policies To predict the effect of on-site implementation and provide a reliable basis for reservoir development plan design and on-site rational implementation. However, the existing steam flooding proportional physical simulation device for heavy oil reservoirs has the following shortcomings or deficiencies in the physical simulation experiment:

(1)不具有边水、底水或边底水的模拟单元,不能开展边底水油藏蒸汽驱物理模拟实验研究,边底水对蒸汽驱开发效果的影响不清楚,直接影响了边底水油藏采油工艺的发展;(1) There is no simulation unit for edge water, bottom water or edge-bottom water, so it is impossible to carry out physical simulation experiments of steam flooding in reservoirs with edge-bottom water. The influence of edge-bottom water on steam flooding Development of oil recovery technology for water reservoirs;

(2)低压模型压力只有0.1MPa,与蒸汽驱油藏条件差别较大,不能全面反映稠油油藏蒸汽驱的生产特征;(2) The pressure of the low-pressure model is only 0.1 MPa, which is quite different from the conditions of steam flooding reservoirs, and cannot fully reflect the production characteristics of steam flooding in heavy oil reservoirs;

(3)高压模型压力可达几十MPa,但模型必须置于高压舱内,操作复杂,试验周期长,限制了物理模拟研究的进度,同时需要耗费大量的人力、物力。(3) The pressure of the high-pressure model can reach dozens of MPa, but the model must be placed in a hyperbaric chamber, the operation is complicated, and the test period is long, which limits the progress of physical simulation research and requires a lot of manpower and material resources.

为了适应现实油藏开发的需要,亟需一种能够客观反映地层油藏实际情况的地球物理勘探技术。In order to meet the needs of actual reservoir development, a geophysical exploration technology that can objectively reflect the actual situation of stratigraphic reservoirs is urgently needed.

发明内容Contents of the invention

为解决上述问题,本发明提供一种底水稠油油藏蒸汽驱二维比例物理模拟装置及其使用方法。In order to solve the above problems, the present invention provides a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water and its application method.

依据本发明的第一技术方案,一种底水稠油油藏蒸汽驱二维比例物理模拟装置包括注入单元、模型本体、底水温度控制单元、底水压力控制单元、模型保温单元、产出计量单元、数据采集与图像处理单元等7个部分;According to the first technical solution of the present invention, a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water includes an injection unit, a model body, a bottom water temperature control unit, a bottom water pressure control unit, a model heat preservation unit, an output 7 parts including metering unit, data acquisition and image processing unit;

注入单元,用于向模型本体内注入可调节注入速度、温度及干度的湿蒸汽,注入速度范围为20cm3/min~100cm3/min、温度范围为120℃~350℃、干度范围为20%~80%;模型本体,用于模拟实际油藏,模型本体可径向360°、轴向45°翻转,可模拟任意角度地层倾角;底水温度控制单元,用于控制底水体的温度,具有升温、降温、恒温功能;底水压力控制单元,用于控制底水体的底水的压力,底水压力反映底水体能量的大小,具有恒定压力及压力递减的功能;The injection unit is used to inject the wet steam with adjustable injection speed, temperature and dryness into the model body. The injection speed ranges from 20cm3 /min to 100cm3 /min, the temperature ranges from 120℃ to 350℃, and the dryness ranges 20% to 80%; the model body is used to simulate the actual oil reservoir, the model body can be rotated 360° in the radial direction and 45° in the axial direction, and can simulate the formation dip angle at any angle; the bottom water temperature control unit is used to control the temperature of the bottom water body , with the functions of heating, cooling, and constant temperature; the bottom water pressure control unit is used to control the bottom water pressure of the bottom water body, the bottom water pressure reflects the energy of the bottom water body, and has the functions of constant pressure and pressure decrease;

模型保温单元,用于给模型本体升温并恒温控制,模拟油藏的初始温度条件,即油藏未开采前的温度;产出计量单元,用于模拟生产井的压力控制,产出流体经冷却后收集于量筒中,计量产油量、产液量;用于分析注蒸汽采油的生产动态特征,即产油量、产液量、含水率、油汽比、采出程度与时间的关系;其中油汽比为注蒸汽开发油藏时,注入多少吨蒸汽才能开采一吨原油的比值;采出程度为一个油藏开发至任一时间内累积采油量占原始地质储量的百分数;数据采集与图像处理单元,用于控制底水压力、注采压差变化,模型本体内温度、压力监测,并在计算机实时生成温度场、压力场图,控制底水压力、注采压差变化。The model insulation unit is used to raise the temperature of the model body and control the constant temperature to simulate the initial temperature condition of the reservoir, that is, the temperature before the reservoir is not exploited; the output measurement unit is used to simulate the pressure control of the production well, and the output fluid is cooled It is collected in a measuring cylinder to measure oil production and liquid production; it is used to analyze the production dynamic characteristics of steam injection oil production, that is, the relationship between oil production, liquid production, water content, oil-steam ratio, recovery degree and time; Among them, the oil-steam ratio is the ratio of how many tons of steam can be injected to extract one ton of crude oil when steam injection is used to develop the reservoir; the recovery degree is the percentage of the cumulative oil production to the original geological reserves during the development of a reservoir; data collection and The image processing unit is used to control the changes of bottom water pressure and injection-production pressure difference, monitor the temperature and pressure inside the model body, and generate temperature field and pressure field maps in real time on the computer to control the changes of bottom water pressure and injection-production pressure difference.

具体地,模型本体包括模型本体外壳、隔热层、底水层和边水层、前后盖板、石墨垫、紧固螺栓(密封组件)、模拟注入井、模拟生产井、温度传感器、压力传感器及温度传感器接口和压力传感器接口;该模型本体外壳为不锈钢板焊接而成的长方体壳体且在长方体壳体前面板及后面板上分别设置法兰及盖板;前面板上的盖板上无接口,后面板上的盖板上有模拟注入井、模拟生产井、热线偶和引压管接口;前面板上的盖板及后面板上的盖板与模型本体外壳法兰之间采用石墨垫,通过紧固螺栓进行密封;模型本体外壳的内侧四周为隔热层,采用了耐高温无机粘结剂进行涂敷与粘结憎油水的绝热材料。Specifically, the model body includes the model body shell, heat insulation layer, bottom water layer and edge water layer, front and rear cover plates, graphite pads, fastening bolts (sealing components), simulated injection wells, simulated production wells, temperature sensors, pressure sensors and temperature sensor interface and pressure sensor interface; the model body shell is a rectangular parallelepiped shell welded by stainless steel plates, and flanges and cover plates are respectively set on the front panel and rear panel of the rectangular parallelepiped shell; the cover plate on the front panel has no interface, the cover plate on the rear panel has interfaces for simulated injection wells, simulated production wells, thermocouples and pressure pipes; graphite pads are used between the cover plates on the front panel and the cover plate on the rear panel and the shell flange of the model body , sealed by fastening bolts; the inner side of the model body shell is surrounded by a heat insulation layer, and a heat-resistant inorganic adhesive is used to coat and bond oil-repellent and water-repellent heat insulation materials.

优选地,在长方体壳体前面板及后面板上分别设置的法兰数量为两个。Preferably, the number of flanges respectively provided on the front panel and the rear panel of the cuboid housing is two.

进一步地,边水层与模型本体的注入井位于同侧,底水层位于模型本体的下部。Further, the edge water layer is located on the same side as the injection well of the model body, and the bottom water layer is located at the lower part of the model body.

优选地,边水层与模型本体的采出井位于同侧,底水层位于模型本体的下部。Preferably, the edge water layer is located on the same side as the production well of the model body, and the bottom water layer is located at the lower part of the model body.

优选地,模拟注入井、模拟生产井为直径为6mm的不锈钢管。上面开槽模拟现场注入井、生产井的射孔井段,开槽的位置按照现场注入井、生产井的射孔井段经比例模化后确定。油层内布设热电偶和压力测点(热电偶和压力测点横向间距5cm,热电偶和压力测点纵向间距2.5cm。模型本体内部边水层、底水层之外的部分为“油层”),用于实时监测蒸汽驱物理模拟试验中的温度场、压力场发育状况。Preferably, the simulated injection well and the simulated production well are stainless steel pipes with a diameter of 6 mm. The above slots simulate the perforated well sections of injection wells and production wells on site, and the positions of the slots are determined after proportional modeling according to the perforated well sections of on-site injection wells and production wells. Arrange thermocouples and pressure measuring points in the oil layer (the horizontal distance between thermocouples and pressure measuring points is 5cm, and the longitudinal distance between thermocouples and pressure measuring points is 2.5cm. The part outside the edge water layer and bottom water layer inside the model body is "oil layer") , which is used to monitor the development of temperature field and pressure field in the steam flooding physical simulation test in real time.

温度传感器在油层内部分布9×21支,在底水层、边水层或底水层分布各1支。的压力传感器在油层内部分布5×6支,在底水层、边水层或底水层分布各1支。There are 9 × 21 temperature sensors distributed inside the oil layer, and one branch is distributed in the bottom water layer, edge water layer or bottom water layer. 5×6 pressure sensors are distributed inside the oil layer, and 1 branch is distributed in the bottom water layer, edge water layer or bottom water layer.

进一步地,注入单元包括水源、高精度流量泵(流量精度不大于1.0%)、可控干度蒸汽发生器,水源连接高精度流量泵的入口端,高精度计量泵的出口端连接可控干度蒸汽发生器的入口端,可控干度蒸汽发生器的出口端连接模型本体的模拟注入井入口端;可控干度蒸汽发生器蒸汽出口距离模拟注入井0.5米以内。Further, the injection unit includes a water source, a high-precision flow pump (flow accuracy not greater than 1.0%), and a steam generator with a controllable dryness. The inlet port of the steam generator with controllable dryness is connected to the inlet port of the simulated injection well of the model body; the steam outlet of the steam generator with controllable dryness is within 0.5 meters from the simulated injection well.

优选地,底水温度控制单元包括换热器、管路、循环水浴,换热器位于底水层(边水层位于模型本体内的一侧,底水层位于模型本体内的底部)的内部,循环水浴位于模型本体后方,循环水浴的出口端与换热器的入口段连接,换热器的出口端与循环水浴的入口端连接,循环水浴、换热器、管路构成回路,实现水循环,用于控制底水的温度。Preferably, the bottom water temperature control unit includes a heat exchanger, pipelines, and a circulating water bath, and the heat exchanger is located inside the bottom water layer (the edge water layer is located on one side of the model body, and the bottom water layer is located at the bottom of the model body) , the circulating water bath is located behind the model body, the outlet end of the circulating water bath is connected to the inlet section of the heat exchanger, the outlet end of the heat exchanger is connected to the inlet end of the circulating water bath, and the circulating water bath, heat exchanger, and pipeline form a loop to realize water circulation , used to control the temperature of the bottom water.

优选地,底水压力控制单元包括压力传感器、缓冲容器、高精度流量泵,缓冲容器和高精度计量泵(流量精度不大于1.0%)位于模型本体的右侧,底水层的入口端与缓冲容器的出口端连接,缓冲容器上端连接压力表,缓冲容器的入口端与高精度计量泵的出口端连接。Preferably, the bottom water pressure control unit includes a pressure sensor, a buffer container, and a high-precision flow pump. The outlet end of the container is connected, the upper end of the buffer container is connected with the pressure gauge, and the inlet end of the buffer container is connected with the outlet end of the high-precision metering pump.

优选地,模型保温单元包括温度传感器、加热器、保温套、温度控制器,保温套位于模型本体的外部,加热器保温套内部的相对侧面,温度控制器位于模型本体的一侧,温度传感器、加热器与温度控制器连接。Preferably, the model heat preservation unit includes a temperature sensor, a heater, a heat preservation jacket, and a temperature controller. The heater is connected with the temperature controller.

优选地,产出计量单元包括冷却器、回压阀、液体收集器(量筒),采出井的出口端与回压阀的入口端连接,回压阀上部连接气源、压力表,回压阀下部的出口端下面放置量筒,量筒收集产出流体。Preferably, the output metering unit includes a cooler, a back pressure valve, a liquid collector (measuring cylinder), the outlet end of the production well is connected to the inlet end of the back pressure valve, the upper part of the back pressure valve is connected to a gas source, a pressure gauge, and the back pressure valve A graduated cylinder is placed below the outlet end of the lower section, and the graduated cylinder collects the produced fluid.

优选地,数据采集与图像处理单元包括硬件和软件两部分,硬件包括温度传感器、压力传感器、数据采集模块、微机,温度传感器、压力传感器的信号线与数据采集模块连接,数据采集模块与微机连接。Preferably, the data acquisition and image processing unit includes hardware and software. The hardware includes a temperature sensor, a pressure sensor, a data acquisition module, and a microcomputer. The signal lines of the temperature sensor and the pressure sensor are connected to the data acquisition module, and the data acquisition module is connected to the microcomputer. .

依据本发明第二技术方案,提供一种底水稠油油藏蒸汽驱二维比例物理模拟装置的使用方法:According to the second technical solution of the present invention, a method for using a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water is provided:

第一步,建立底水稠油油藏蒸汽驱二维比例物理模型。安装模拟注入井、模拟生产井、底水温度控制单元、底水压力控制单元,底水层位于模型本体内的底部,填装油层砂,安装模型本体前盖板,上紧螺栓密封;The first step is to establish a two-dimensional proportional physical model of steam flooding in heavy oil reservoirs with bottom water. Install simulated injection wells, simulated production wells, bottom water temperature control units, and bottom water pressure control units. The bottom water layer is located at the bottom of the model body, fill with oil layer sand, install the front cover of the model body, and tighten the bolts to seal;

第二步,流程连接。注入单元与模型本体的模拟注入井连接,产出计量单元与模型本体的模拟生产井连接,压力传感器、温度传感器、数据采集模块、依次与微机连接。模拟注入井与注入单元连接,模拟生产井与才出计量单元连接;The second step is process connection. The injection unit is connected to the simulated injection well of the model body, the output metering unit is connected to the simulated production well of the model body, and the pressure sensor, temperature sensor, and data acquisition module are connected to the microcomputer in turn. The simulated injection well is connected with the injection unit, and the simulated production well is connected with the metering unit;

第三步,建立油藏初始温度条件。启动模型保温单元,给模型本体升温并恒温控制,模拟油藏的初始温度条件;The third step is to establish the initial temperature conditions of the reservoir. Start the model insulation unit, raise the temperature of the model body and control the constant temperature, and simulate the initial temperature conditions of the reservoir;

第四步,模拟油层饱和水,测定油层的孔隙体积;The fourth step is to simulate the saturated water of the oil layer and measure the pore volume of the oil layer;

第五步,模拟油层饱和油,启动底水压力控制单元,控制底水的压力,得到模拟油层初始含油饱和度及模拟油层的初始压力条件;The fifth step is to simulate saturated oil in the oil layer, start the bottom water pressure control unit, control the pressure of the bottom water, and obtain the initial oil saturation of the simulated oil layer and the initial pressure condition of the simulated oil layer;

第六步,注蒸汽采油,注入速度为(20~100cm3/min)、温度为(120~350℃)、干度为(20~80%)的湿蒸汽,产出计量单元收集产出流体。底水压力控制依据油田现场生产压力的变化情况进行;The sixth step is steam injection for oil recovery. Wet steam is injected at a rate of (20-100cm 3 /min), at a temperature of (120-350°C) and at a dryness of (20-80%), and the output metering unit is used to collect the output fluid . Bottom water pressure control is carried out according to the change of oil field production pressure;

第七步,产出流体分离。计量产出油量、产出水量、产出液量、油汽比、采出程度;In the seventh step, the output fluid is separated. Measure oil output, water output, liquid output, oil-steam ratio, recovery degree;

第八步,分析注蒸汽采油的生产动态特征。即产油量、产液量、含水率、油汽比、采出程度与时间的关系曲线规律。The eighth step is to analyze the production dynamic characteristics of steam injection recovery. That is, the relationship curve law of oil production, liquid production, water cut, oil-steam ratio, recovery degree and time.

本发明的底水稠油油藏蒸汽驱二维比例物理模拟装置及使用方法,用于探索底水油藏蒸汽驱油机理,认识油藏的边水、底水或底水对蒸汽驱开采效果影响,边水、底水或底水稠油油藏蒸汽驱的温度场发育特征、生产特征,指导边水、底水或底水稠油油藏蒸汽驱开发。本发明与现有技术相比,具有以下的优点:The two-dimensional proportional physical simulation device and application method for steam flooding of heavy oil reservoirs with bottom water according to the present invention are used to explore the mechanism of steam flooding in bottom water reservoirs, and to understand the effect of edge water, bottom water or bottom water on steam flooding in oil reservoirs Influence, temperature field development characteristics and production characteristics of steam flooding in edge water, bottom water or bottom water heavy oil reservoirs, guide the development of steam flooding in edge water, bottom water or bottom water heavy oil reservoirs. Compared with the prior art, the present invention has the following advantages:

(1)实现了边水、底水或底水稠油油藏蒸汽驱物理模拟;(1) Physical simulation of steam flooding in heavy oil reservoirs with edge water, bottom water or bottom water;

(2)可模拟五点、七点、九点、行列井网,直井-水平井组合,模型本体可径向360°,轴向45°翻转,可模拟地层倾角。(2) It can simulate five-point, seven-point, nine-point, row-column well pattern, vertical well-horizontal well combination, the model body can be rotated 360° radially and 45° axially, and can simulate formation dip.

(3)模型本体隔热、注采井保温隔热结构独创。在温度高达350℃条件下,油层向盖、底层传热传质模拟准确。(3) The thermal insulation structure of the model body and the thermal insulation structure of the injection-production well are original. Under the condition that the temperature is as high as 350°C, the simulation of heat and mass transfer from the oil layer to the cap and bottom layer is accurate.

(4)实现了蒸汽吞吐、蒸汽驱联动物理模拟,同时可开展分层注汽、分层采油及合注分采、分注合采的物理模拟实验。(4) The physical simulation of steam huff and puff and steam drive linkage has been realized, and physical simulation experiments of layered steam injection, layered oil recovery, combined injection and separate production, and separate injection and combined production can be carried out at the same time.

(5)底水压力、温度可控;(5) Bottom water pressure and temperature are controllable;

(6)注入蒸汽干度可控;(6) The dryness of injected steam is controllable;

(7)依据相似理论计算和模拟油藏弹性能大小,客观描述蒸汽吞吐动态特征、采出程度及剩余油分布特征。(7) Calculate and simulate the elastic energy of the reservoir based on the similarity theory, and objectively describe the dynamic characteristics of steam huff and puff, recovery degree and distribution characteristics of remaining oil.

附图说明Description of drawings

图1是依据本发明的边底水稠油油藏蒸汽驱二维比例物理模拟装置示意图;Fig. 1 is a schematic diagram of a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with edge and bottom water according to the present invention;

图2是五点井网布置示意图;Figure 2 is a schematic diagram of five-point well pattern layout;

图3是七点井网布置示意图;Figure 3 is a schematic diagram of a seven-point well pattern;

图4是九点井网布置示意图;Figure 4 is a schematic diagram of the layout of the nine-point well pattern;

图5是行列井网布置示意图;Fig. 5 is a schematic diagram of row and column well pattern layout;

图6是直井-水平井井网布置示意图;Fig. 6 is a schematic diagram of vertical well-horizontal well pattern layout;

图7是注入单元示意图;Fig. 7 is a schematic diagram of the injection unit;

图8是模型本体示意图;Fig. 8 is a schematic diagram of the model body;

图9是边底水温度控制单元示意图;Fig. 9 is a schematic diagram of the edge and bottom water temperature control unit;

图10是边底水压力控制单元示意图;Fig. 10 is a schematic diagram of the edge and bottom water pressure control unit;

图11是模型保温控制单元示意图;Fig. 11 is a schematic diagram of a model heat preservation control unit;

图12是产出计量单元示意图;Fig. 12 is a schematic diagram of the output metering unit;

图13是数据采集与图像处理单元示意图。Fig. 13 is a schematic diagram of the data acquisition and image processing unit.

具体实施方式detailed description

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在附图中,附图标记指示如下:101注入单元、102模型本体、103底水温度控制单元、104底水压力控制单元、105数据采集与图像处理单元、106产出计量单元、107模型保温控制单元、701水源、702高压计量泵、703蒸汽发生器、801模拟注入井、802边水、803边水渗透层、804模型本体隔热层、805底水、806螺栓、807模拟生产井、808压力监测点(导压管)、809温度监测点(热电偶)、810底水渗透层901循环水浴、902底水、903第一温度传感器、904换热器、1001压力传感器、1002第一压力表、1003缓冲容器、1004边水、1005高压计量泵、1101第二温度传感器、1102第三温度控制器、1103中心旋转轴、1104保温套、1105模型本体、1106加热器、1201模型本体、1202模拟生产井、1203回压阀、1204第二压力表、1205气源、1206冷却器、1207量筒、1301微机、1302数据采集模块、1303压力传感器、1304第四温度传感器。在图2-5中,“△”表示注入井、“○”表示生产井。图6中,“-”表示水平井“○”表示直井。In the accompanying drawings, reference numerals indicate as follows: 101 injection unit, 102 model body, 103 bottom water temperature control unit, 104 bottom water pressure control unit, 105 data acquisition and image processing unit, 106 output metering unit, 107 model insulation Control unit, 701 water source, 702 high-pressure metering pump, 703 steam generator, 801 simulated injection well, 802 edge water, 803 edge water seepage layer, 804 model body insulation layer, 805 bottom water, 806 bolt, 807 simulated production well, 808 Pressure monitoring point (pressure guiding tube), 809 Temperature monitoring point (thermocouple), 810 Bottom water infiltration layer 901 Circulating water bath, 902 Bottom water, 903 First temperature sensor, 904 Heat exchanger, 1001 Pressure sensor, 1002 First Pressure gauge, 1003 buffer container, 1004 edge water, 1005 high-pressure metering pump, 1101 second temperature sensor, 1102 third temperature controller, 1103 central rotating shaft, 1104 insulation cover, 1105 model body, 1106 heater, 1201 model body, 1202 simulated production well, 1203 back pressure valve, 1204 second pressure gauge, 1205 gas source, 1206 cooler, 1207 measuring cylinder, 1301 microcomputer, 1302 data acquisition module, 1303 pressure sensor, 1304 fourth temperature sensor. In Figures 2-5, "△" indicates injection wells, and "○" indicates production wells. In Fig. 6, "-" indicates a horizontal well and "○" indicates a vertical well.

更详细地,参考并结合附图进一步说明,在图1为依据本发明的底水稠油油藏蒸汽驱二维比例物理模拟装置中,底水层和边水层的位置关系可以为:第一种位置关系是边水层与模型本体的注入井位于同侧,底水层位于模型本体的下部;第二种位置关系是边水层与模型本体的采出井位于同侧,底水层位于模型本体的下部。第二种位置关系相对于第一种位置关系的改变点在于注入井与采出井互换位置。In more detail, referring to and further explaining in conjunction with the accompanying drawings, in Fig. 1, in the two-dimensional proportional physical simulation device for steam flooding of heavy oil reservoirs with bottom water according to the present invention, the positional relationship between the bottom water layer and the edge water layer can be: One position relationship is that the injection well of the edge water layer and the model body are located on the same side, and the bottom water layer is located at the lower part of the model body; the second position relationship is that the edge water layer and the production well of the model body are located on the same side, and the bottom water layer is located at The lower part of the model body. The change point of the second positional relationship relative to the first positional relationship is that the injection well and the production well exchange positions.

如图1-图13所示,图1为依据本发明的底水稠油油藏蒸汽驱二维比例物理模拟装置,本发明的底水稠油油藏蒸汽驱二维比例物理模拟装置,包括注入单元、模型本体、底水温度控制单元、底水压力控制单元、模型保温单元、产出计量单元、数据采集与图像处理单元等7个部分。As shown in Figures 1 to 13, Fig. 1 is a two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water according to the present invention. The two-dimensional proportional physical simulation device for steam flooding in heavy oil reservoirs with bottom water of the present invention includes There are 7 parts including injection unit, model body, bottom water temperature control unit, bottom water pressure control unit, model heat preservation unit, output measurement unit, data acquisition and image processing unit.

注入单元,用于向模型本体内注入速度为(20~100cm3/min)、温度为(120~350℃)、干度为(20~80%)的湿蒸汽,注入速度、温度、干度可调。The injection unit is used to inject wet steam into the model body with a speed of (20-100cm 3 /min), a temperature of (120-350°C) and a dryness of (20-80%), and the injection speed, temperature, and dryness adjustable.

模型本体,用于模拟实际油藏,模型本体可径向360°、轴向45°翻转,可模拟任意角度地层倾角。图2-6为井网布置示意图,其井网布置方式有五点、七点、九点、行列井网和直井-水平井组合(如图2-6所示)。五点井网的注、采井均匀分布,相邻井点位置构成正方形,注汽井在生产井正方形的中心,构成一个注采单元,注采井数比例为1:1;七点井网按正三角形井网布置的每个井排上相邻两口采油井之间夹两口注汽井,由三口采油井组成的正三角形的中心为一口注汽井。每口注汽井与周围三口采油井相关,每口采油井受六口注汽井影响。其注采井数比为2:1;九点井网的每一个单元为一个正方形,中间有一口生产井和周边八口注汽井。四口注汽井在正方形的四个角上,四口注汽井在正方形的四个边上。注采井数之比为3:1;行列井网的注、采井排列关系为一排生产井,一排注汽井,注汽井与生产井构成长方形,注采井比例为1:1;直井-水平井组合方式为水平井打在两行直井的中间,且位于油层的下部,采用两行直井注汽,水平井生产。The model body is used to simulate the actual reservoir. The model body can be flipped 360° in the radial direction and 45° in the axial direction, and can simulate formation dip angles at any angle. Figure 2-6 is a schematic diagram of the well pattern layout. The well pattern layout includes five-point, seven-point, nine-point, row-column well pattern and vertical well-horizontal well combination (as shown in Figure 2-6). The injection and production wells of the five-point well pattern are evenly distributed, and the positions of adjacent well points form a square. The steam injection well is in the center of the square of the production well, forming an injection-production unit. The ratio of the number of injection-production wells is 1:1; the seven-point well pattern Two steam injection wells are sandwiched between two adjacent oil production wells in each well row arranged according to the equilateral triangle well pattern, and the center of the equilateral triangle composed of three oil production wells is a steam injection well. Each steam injection well is related to three surrounding oil production wells, and each oil production well is affected by six steam injection wells. The injection-production well ratio is 2:1; each unit of the nine-point well pattern is a square, with a production well in the middle and eight steam injection wells around it. Four steam injection wells are on the four corners of the square, and four steam injection wells are on the four sides of the square. The ratio of the number of injection and production wells is 3:1; the arrangement of injection and production wells in the well pattern is a row of production wells and a row of steam injection wells, steam injection wells and production wells form a rectangle, and the ratio of injection and production wells is 1:1 ; The vertical well-horizontal well combination mode is that the horizontal well is drilled in the middle of two rows of vertical wells, and is located in the lower part of the oil layer, and the two rows of vertical wells are used for steam injection, and the horizontal wells are produced.

底水温度控制单元,用于控制底水体的温度,具有升温、恒温、降温功能。The bottom water temperature control unit is used to control the temperature of the bottom water body, and has the functions of heating, constant temperature and cooling.

底水压力控制单元,用于控制底水的压力,底水压力反映底水体能量的大小,具有恒定压力、压力递减的功能。The bottom water pressure control unit is used to control the pressure of the bottom water. The bottom water pressure reflects the energy of the bottom water body and has the functions of constant pressure and decreasing pressure.

模型保温单元,用于给模型本体升温并恒温控制,模拟油藏的初始温度条件,即油藏未开采前的温度。The model insulation unit is used to raise the temperature of the model body and control the constant temperature to simulate the initial temperature condition of the reservoir, that is, the temperature before the reservoir is exploited.

产出计量单元,用于产出流体冷却,并进行生产压力控制,收集产出流体,计量产出油、水量,分析注蒸汽采油的生产动态特征,即产油量、产液量、含水率、油汽比、采出程度与时间的关系。其中油汽比为注蒸汽开发油藏时,注入多少吨蒸汽才能开采一吨原油的比值;采出程度为一个油藏开发至任一时间内累积采油量占原始地质储量的百分数。The output metering unit is used to cool the output fluid, control the production pressure, collect the output fluid, measure the output oil and water, and analyze the production dynamic characteristics of steam injection oil recovery, that is, oil production, liquid production, and water content , oil-steam ratio, recovery degree and time. Among them, the oil-steam ratio is the ratio of how many tons of steam can be injected to extract one ton of crude oil when steam injection is used to develop the reservoir; the recovery degree is the percentage of the cumulative oil production to the original geological reserves during the development of a reservoir at any time.

数据采集与图像处理单元,用于模型本体内温度、压力监测,并在计算机实时生成温度场、压力场图,控制底水压力、注采压差变化。The data acquisition and image processing unit is used to monitor the temperature and pressure inside the model body, and generate temperature field and pressure field maps in real time on the computer to control the bottom water pressure and the pressure difference between injection and production.

进一步地,如图7所示的注入单元,注入单元包括水源701、高压计量泵702、蒸汽发生器水源703。所述高压计量泵702可以是高精度流量泵、蒸汽发生器水源703可以是可控干度蒸汽发生器,水源连接高精度流量泵的入口端,高精度计量泵的出口端连接可控干度蒸汽发生器的入口端,可控干度蒸汽发生器的出口端连接模型本体的注入井入口端;可控干度蒸汽发生器蒸汽出口距离注入井0.5米以内。Further, as the injection unit shown in FIG. 7 , the injection unit includes a water source 701 , a high-pressure metering pump 702 , and a steam generator water source 703 . The high-pressure metering pump 702 can be a high-precision flow pump, and the steam generator water source 703 can be a steam generator with a controllable dryness. The inlet port of the steam generator and the outlet port of the controllable dryness steam generator are connected to the inlet port of the injection well of the model body; the steam outlet of the controllable dryness steam generator is within 0.5 meters from the injection well.

如图8所示的模型本体,该模型本体外壳为不锈钢板焊接而成的长方体壳体且在长方体壳体前面板及后面板上分别设置法兰及盖板;前面板上的盖板上无接口,后面板上的盖板上有模拟注入井、模拟生产井、热线偶和引压管接口;前面板上的盖板及后面板上的盖板与模型本体外壳法兰之间采用石墨垫,通过紧固螺栓进行密封;模型本体外壳的内侧四周为隔热层,采用了耐高温无机粘结剂进行涂敷与粘结憎油水的绝热材料。The model body shown in Figure 8, the model body shell is a cuboid shell welded by stainless steel plates and flanges and cover plates are respectively arranged on the front panel and the rear panel of the cuboid shell; interface, the cover plate on the rear panel has interfaces for simulated injection wells, simulated production wells, thermocouples and pressure pipes; graphite pads are used between the cover plates on the front panel and the cover plate on the rear panel and the shell flange of the model body , sealed by fastening bolts; the inner side of the model body shell is surrounded by a heat insulation layer, and a heat-resistant inorganic adhesive is used to coat and bond oil-repellent and water-repellent heat insulation materials.

模拟注入井、模拟生产井均为直径为6mm的不锈钢管。上面开槽模拟现场注入井、生产井的射孔井段,开槽的位置按照现场注入井、生产井的射孔井段经比例模化后确定。油层内布设热电偶和压力测点,热电偶和压力测点横向间距5cm,热电偶和压力测点纵向间距3.5cm或2.5cm。模型本体内部边水层、底水层之外的部分为“油层”,用于实时监测蒸汽驱物理模拟试验中的温度场、压力场发育状况。The simulated injection well and simulated production well are all stainless steel pipes with a diameter of 6mm. The above slots simulate the perforated well sections of injection wells and production wells on site, and the positions of the slots are determined after proportional modeling according to the perforated well sections of on-site injection wells and production wells. Thermocouples and pressure measuring points are arranged in the oil layer, the transverse distance between thermocouples and pressure measuring points is 5cm, and the longitudinal distance between thermocouples and pressure measuring points is 3.5cm or 2.5cm. The part outside the edge water layer and bottom water layer inside the model body is the "oil layer", which is used to monitor the development of temperature field and pressure field in the steam flooding physical simulation test in real time.

温度传感器在油层内部分布9×21支,在底水层、边水层或底水层分布各1支。的压力传感器在油层内部分布5×6支,在底水层、边水层或底水层分布各1支。There are 9 × 21 temperature sensors distributed inside the oil layer, and one branch is distributed in the bottom water layer, edge water layer or bottom water layer. 5×6 pressure sensors are distributed inside the oil layer, and 1 branch is distributed in the bottom water layer, edge water layer or bottom water layer.

如图9所示的底水温度控制单元,底水温度控制单元包括换热器、管路、循环水浴,换热器位于底水层的内部,循环水浴位于模型本体一侧,循环水浴的出口端与换热器的入口段连接,换热器的出口端与循环水浴的入口端连接,构成回路。The bottom water temperature control unit shown in Figure 9, the bottom water temperature control unit includes a heat exchanger, pipelines, and a circulating water bath, the heat exchanger is located inside the bottom water layer, the circulating water bath is located on the side of the model body, and the outlet of the circulating water bath The end is connected to the inlet section of the heat exchanger, and the outlet end of the heat exchanger is connected to the inlet end of the circulating water bath to form a loop.

如图10所示的底水压力控制单元,底水压力控制单元包括压力传感器、缓冲容器、高精度流量泵,缓冲容器和高精度计量泵位于模型本体的一侧,底水层的入口端与缓冲容器的出口端连接,缓冲容器上端连接压力表,缓冲容器的入口端与高精度计量泵的出口端连接。The bottom water pressure control unit shown in Figure 10, the bottom water pressure control unit includes a pressure sensor, a buffer container, a high-precision flow pump, the buffer container and a high-precision metering pump are located on one side of the model body, and the inlet port of the bottom water layer is connected to the The outlet port of the buffer container is connected, the upper end of the buffer container is connected with a pressure gauge, and the inlet port of the buffer container is connected with the outlet port of the high-precision metering pump.

如图11所示的模型保温单元,模型保温单元包括温度传感器、加热器、保温套、温度控制器,保温套位于模型本体的外部,加热器保温套内部的相对侧面,温度控制器位于模型本体的一侧,温度传感器、加热器与温度控制器连接。The model heat preservation unit shown in Figure 11, the model heat preservation unit includes a temperature sensor, a heater, a heat preservation jacket, and a temperature controller. On one side, the temperature sensor, heater and temperature controller are connected.

如图12所示的产出计量单元,产出计量单元包括冷却器、回压阀、液体收集器(量筒),模拟生产井的出口端与回压阀的入口端连接,回压阀上部连接气源、压力表,回压阀下部的出口端下面放置量筒。The output metering unit shown in Figure 12, the output metering unit includes a cooler, a back pressure valve, a liquid collector (graduating cylinder), the outlet of the simulated production well is connected to the inlet of the back pressure valve, and the upper part of the back pressure valve is connected to Place the graduated cylinder under the outlet of the air source, pressure gauge and the lower part of the back pressure valve.

如图13所示的数据采集与图像处理单元,数据采集与图像处理单元包括硬件和软件两部分,硬件包括温度传感器、压力传感器、数据采集模块、微机,温度传感器、压力传感器的信号线与数据采集模块连接,数据采集模块与微机连接。The data acquisition and image processing unit shown in Figure 13, the data acquisition and image processing unit includes hardware and software two parts, hardware includes temperature sensor, pressure sensor, data acquisition module, microcomputer, signal line and data of temperature sensor, pressure sensor The acquisition module is connected, and the data acquisition module is connected with the microcomputer.

使用本发明的底水稠油油藏蒸汽驱二维比例物理模拟装置的具体实验步骤如下:The specific experimental steps of using the steam flooding two-dimensional proportional physical simulation device for heavy oil reservoirs with bottom water of the present invention are as follows:

第一步,建立底水稠油油藏蒸汽驱二维比例物理模型:安装模拟注入井、模拟生产井、底水温度控制单元、底水压力控制单元,底水层位于模型本体内的底部,填装油层砂,安装模型本体前盖板,上紧螺栓密封;The first step is to establish a two-dimensional proportional physical model of steam flooding in heavy oil reservoirs with bottom water: install simulated injection wells, simulated production wells, bottom water temperature control units, and bottom water pressure control units. The bottom water layer is located at the bottom of the model body. Fill the sand in the oil layer, install the front cover of the model body, and tighten the bolts to seal;

第二步,流程连接:注入单元与模型本体的模拟注入井连接,产出计量单元与模型本体的模拟生产井连接,压力传感器、温度传感器、数据采集模块依次与微机连接。模拟注入井与注入单元连接,模拟生产井与才出计量单元连接;The second step is process connection: the injection unit is connected to the simulated injection well of the model body, the output metering unit is connected to the simulated production well of the model body, and the pressure sensor, temperature sensor, and data acquisition module are connected to the microcomputer in turn. The simulated injection well is connected with the injection unit, and the simulated production well is connected with the metering unit;

第三步,建立油藏初始温度条件。启动模型保温单元,给模型本体升温并恒温控制,模拟油藏的初始温度条件;The third step is to establish the initial temperature conditions of the reservoir. Start the model insulation unit, raise the temperature of the model body and control the constant temperature, and simulate the initial temperature conditions of the reservoir;

第四步,模拟油层饱和水,测定油层的孔隙体积;The fourth step is to simulate the saturated water of the oil layer and measure the pore volume of the oil layer;

第五步,模拟油层饱和油,启动底水压力控制单元,控制底水的压力,得到模拟油层初始含油饱和度及模拟油层的初始压力条件;The fifth step is to simulate saturated oil in the oil layer, start the bottom water pressure control unit, control the pressure of the bottom water, and obtain the initial oil saturation of the simulated oil layer and the initial pressure condition of the simulated oil layer;

第六步,注蒸汽采油,注入速度为(20~100cm3/min)、温度为(120~350℃)、干度为(20~80%)的湿蒸汽,产出计量单元收集产出流体。底水压力控制依据油田现场生产压力的变化情况进行;The sixth step is steam injection for oil recovery. Wet steam is injected at a rate of (20-100cm 3 /min), at a temperature of (120-350°C) and at a dryness of (20-80%), and the output metering unit is used to collect the output fluid . Bottom water pressure control is carried out according to the change of oil field production pressure;

第七步,产出流体分离。计量产出油量、产出水量、产出液量、油汽比、采出程度;In the seventh step, the output fluid is separated. Measure oil output, water output, liquid output, oil-steam ratio, recovery degree;

第八步,分析注蒸汽采油的生产动态特征。即产油量、产液量、含水率、油汽比、采出程度与时间的关系曲线规律。The eighth step is to analyze the production dynamic characteristics of steam injection recovery. That is, the relationship curve law of oil production, liquid production, water cut, oil-steam ratio, recovery degree and time.

上述发明的技术方案基于以下本申请发明人的以下研究基础来实现的,本发明下面所述的研究基础与上面所述的发明技术方案有机地结合在一起:在仅仅研究底水侵入时,将边水关闭或消除即可。The technical scheme of the above-mentioned invention is realized based on the following research basis of the inventor of the present application below, and the research basis described below of the present invention is organically combined with the technical scheme of the invention described above: when only studying bottom water intrusion, the Edge water can be closed or eliminated.

一、底水油藏蒸汽驱二维比例物理模拟的工作原理1. Working principle of two-dimensional proportional physical simulation of steam flooding in bottom water reservoirs

比例物理模拟的依据是相似准则,依据蒸汽驱比例物理模拟相似准则,将油藏原型参数进行转换,得到一套模型控制参数,在此基础上设计建立与油藏原型相似的底水油藏蒸汽驱二维比例物理模型。依据边水、底水油藏累计水侵量计算公式,计算边水、底水油藏累计水侵量。将模型参数带入到边水、底水累计水侵量计算公式,得到模型边水、底水累计水侵量。The basis of the proportional physical simulation is the similarity criterion. According to the similarity criterion of the proportional physical simulation of steam flooding, the parameters of the reservoir prototype are converted to obtain a set of model control parameters. Drive two-dimensional scale physical model. According to the calculation formula of cumulative water influx of edge water and bottom water reservoirs, the cumulative water influx of edge water and bottom water reservoirs is calculated. Bring the model parameters into the calculation formula of the cumulative water intrusion of the edge water and bottom water to obtain the cumulative water influx of the model edge water and bottom water.

L-井距;L-well spacing;

R-相似比;R-similarity ratio;

m-物理模型;m - physical model;

f-油田原型;f - oil field prototype;

Δρ-油汽密度差;Δρ-oil-vapor density difference;

ΔP-生产压差;ΔP-production differential pressure;

t-时间;t - time;

α-热扩散系数;α - thermal diffusivity;

q-注入速度;q - injection speed;

K-渗透率;K-permeability;

P-压力;P - pressure;

T-温度。T - temperature.

二、边水、底水油藏累计水侵量计算方法如下:2. The calculation method of cumulative water influx in edge water and bottom water reservoirs is as follows:

1、边水油藏1. Edge water reservoirs

WW ee == BB ΣΣ 00 tt ΔPΔP ·· QQ (( tt DD. ))

B=φbhLCe B=φbhLC e

tt DD. == 0.010.01 KK ww φφ μμ ww CC ee LL 22

(1)无穷线性供水区(1) Infinite linear water supply area

QQ (( tt DD. )) == tt DD. ππ

(2)有限线性供水区,封边外边界(2) Limited linear water supply area, sealed outer boundary

QQ (( tt DD. )) == 11 -- 88 ππ 22 ΣΣ nno == 11 ∞∞ (( 11 nno 22 )) expexp (( -- nno 22 ππ 22 tt DD. 44 ))

(3)有限线性供水区,外边界压降为常数(3) Limited linear water supply area, the outer boundary pressure drop is constant

QQ (( tt DD. )) == (( tt DD. ++ 11 33 )) -- 22 ππ 22 ΣΣ nno == 11 ∞∞ (( 11 nno 22 )) expexp (( -- nno 22 ππ 22 tt DD. ))

边水位于油藏含油(气)外边界以外,侵入油藏的方向主要为水平方向。边水入侵与油井工作制度、储层展布、平面非均质、边水水体大小等因素有关。The edge water is located outside the oil (gas) outer boundary of the reservoir, and the direction of intrusion into the reservoir is mainly horizontal. Edge water invasion is related to factors such as oil well working system, reservoir distribution, plane heterogeneity, and edge water body size.

2、底水油藏2. Bottom water reservoir

WW ee == BB ΣΣ 00 tt ΔPΔP ·&Center Dot; QQ (( tt DD. ,, rr DD. ))

BB == 22 ππ rr wrwr 22 φhφh CC ee

tt DD. == KK ww ·&Center Dot; tt φφ μμ ww CC ee rr wrwr 22

Ce=Cw+Cf C e =C w +C f

底水位于油藏含油(气)外边界以内,直接从底部托着油(气),侵入方向为垂向,即底水锥进。随着油井的投产,油水界面的形状将发生变化,逐渐形成锥状体。锥体的上升速度取决于该点处势梯度值的大小以及该处岩石的垂向渗透率,锥体的上升高度取决于因水油密度差引起的重力与垂向压力梯度的平衡。Bottom water is located within the outer boundary of oil (gas) in the reservoir, directly supporting oil (gas) from the bottom, and the invasion direction is vertical, that is, bottom water coning. As the oil well is put into production, the shape of the oil-water contact will change and gradually form a cone. The rising speed of the cone depends on the value of the potential gradient at the point and the vertical permeability of the rock at that point, and the rising height of the cone depends on the balance between the gravity and the vertical pressure gradient caused by the difference in the density of water and oil.

式中:In the formula:

We——累计水侵量,104m3W e —— cumulative water intrusion, 10 4 m 3 ;

Q(tD)——无因次水侵量;Q(t D )—dimensionless water intrusion;

ΔP——油藏总压降,MPa;ΔP—total pressure drop of reservoir, MPa;

L——井距,m;L——well spacing, m;

B——水侵系数;B——water intrusion coefficient;

tD——无因次时间;t D ——dimensionless time;

rD——无因次半径;r D ——dimensionless radius;

Ce——水区综合压缩系数,MPa-1C e ——comprehensive compressibility coefficient of water area, MPa -1 ;

Cw——水压缩系数,MPa-1C w ——Water compressibility coefficient, MPa -1 ;

Cf——岩石压缩系数,MPa-1C f —rock compressibility coefficient, MPa -1 ;

rwr——底水半径,m;r wr —— radius of bottom water, m;

h——油层厚度,m;h—thickness of oil layer, m;

φ——水区岩石孔隙度;φ—rock porosity in water area;

Kw——水区有效渗透率,10-3μm2K w — effective permeability of water area, 10 -3 μm 2 ;

μw——水粘度,mPa·s。μ w ——water viscosity, mPa·s.

三、物理模拟实验边水、底水、底水的控制方法3. Control method of edge water, bottom water and bottom water in physical simulation experiment

1、边水油藏1. Edge water reservoirs

(1)无穷线性供水区(1) Infinite linear water supply area

由于边水为无穷线性供水区,边水的压力不会降低。因此,边水区的压力与油藏初始压力相同,并采用计算机控制高精度流量泵,保持边水区压力恒定。Since the edge water is an infinite linear water supply area, the pressure of the edge water will not decrease. Therefore, the pressure in the edge water area is the same as the initial pressure of the reservoir, and a computer-controlled high-precision flow pump is used to keep the pressure in the edge water area constant.

(2)有限线性供水区,封边外边界(2) Limited linear water supply area, sealed outer boundary

由于边水为有限线性供水区,封边外边界,没有补给,边水的压力自然递减。因此,边水区的压力与油藏初始压力相同,高精度流量泵不供水,边水区压力随着模拟油层的注采压差的变化而变化。Since the edge water is a limited linear water supply area, the outer boundary of the edge is sealed and there is no recharge, so the pressure of the edge water naturally decreases. Therefore, the pressure in the edge water area is the same as the initial pressure of the reservoir, and the high-precision flow pump does not supply water, and the pressure in the edge water area changes with the change of the injection-production pressure difference of the simulated oil layer.

(3)有限线性供水区,外边界压降为常数(3) Limited linear water supply area, the outer boundary pressure drop is constant

由于边水为有限线性供水区,外边界压降为常数。因此,边水区的压力与油藏初始压力相同,采用计算机控制高精度流量泵,边水区的压降为常数。Since the edge water is a finite linear water supply area, the pressure drop at the outer boundary is constant. Therefore, the pressure in the edge water area is the same as the initial pressure of the reservoir, and the pressure drop in the edge water area is constant by using a computer-controlled high-precision flow pump.

2、底水油藏2. Bottom water reservoir

计算出模型的生产压差、生产时间和底水的累计水侵量,采用计算机控制生产压差变化速率和底水的水侵量速率。Calculate the production pressure difference of the model, the production time and the cumulative water intrusion of the bottom water, and use the computer to control the change rate of the production pressure difference and the water intrusion rate of the bottom water.

3、底水油藏3. Bottom water reservoir

计算出模型的生产压差、生产时间和底水的累计水侵量,采用计算机控制生产压差变化速率和底水的水侵量速率。Calculate the production pressure difference of the model, the production time and the cumulative water intrusion of the bottom water, and use the computer to control the change rate of the production pressure difference and the water intrusion rate of the bottom water.

四、物理模拟实验针对边水、底水、底水的温度、压力监测点布置4. The physical simulation experiment is arranged for the temperature and pressure monitoring points of edge water, bottom water and bottom water

1、边水油藏1. Edge water reservoirs

对应注采井射孔位置的水平方向温度监测点加密,通过温度变化速率和压力场变化识别边水侵入半径。The temperature monitoring points in the horizontal direction corresponding to the perforation positions of the injection and production wells are intensified, and the edge water invasion radius is identified through the temperature change rate and pressure field change.

2、底水油藏2. Bottom water reservoir

油层纵向温度监测点加密,通过温度变化速率和压力场变化识别底水侵入高度。The longitudinal temperature monitoring points of the oil layer are dense, and the bottom water invasion height is identified through the temperature change rate and pressure field change.

3、底水油藏3. Bottom water reservoir

对应注采井射孔位置的水平方向、纵向温度监测点均加密,通过温度变化速率和压力场变化识别底水侵入半径和高度。The horizontal and vertical temperature monitoring points corresponding to the perforation positions of injection and production wells are intensified, and the radius and height of bottom water invasion are identified by temperature change rate and pressure field change.

显然上述实施例仅为清楚的说明本发明所做的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上,还可以做出其他不同形式的变化或变动,这里无需也无法对所有实施方式予以穷举。由此所引申的显而易见的变化或变动仍处于本发明创造的保护范围之中。Apparently, the above-mentioned embodiments are only examples for clearly illustrating the present invention, rather than limiting the implementation. For those of ordinary skill in the art, on the basis of the above description, other changes or changes in different forms can also be made, and it is not necessary and impossible to exhaustively enumerate all implementation modes here. The obvious changes or variations derived therefrom are still within the scope of protection of the present invention.

Claims (6)

1. an oriented perforating steam flooding two-dimensional proportion physical simulation device, it comprises injection unit, model ontology, end coolant-temperature gage control unit, end water pressure control unit, model heat-insulation unit, output metering units and data acquisition and graphics processing unit;
Injection unit, for injecting the moist steam of adjustable injection rate, temperature and mass dryness fraction in model ontology, injection rate scope is 20cm 3/ min ~ 100cm 3/ min, temperature range are 120 DEG C ~ 350 DEG C, mass dryness fraction scope is 20% ~ 80%;
Model ontology, for simulating actual oil reservoir, model ontology can radial 360 °, axially 45 ° of upsets, can simulate arbitrarily angled stratigraphic dip;
End coolant-temperature gage control unit, for controlling the temperature of end water body, has heating, cooling, temperature incubation function;
End water pressure control unit, for controlling the pressure of the end water of end water body, the size of end water pressure reflection end water energy, has the function of constant pressure and pressure decline;
Model heat-insulation unit, for model ontology heat up and thermostatic control, the initial temperature condition of simulating oil deposit, namely oil reservoir unmind before temperature;
Output metering units, is collected in graduated cylinder by model ontology produced fluid after cooling, and metering oil production, Liquid output, for the Stress control of simulated production well; Be used for analyzing the characteristic of production dynamic of steam injection recovery, i.e. oil production, Liquid output, moisture content, gas oil ratio, recovery percent of reserves and the relation of time; When wherein gas oil ratio is steam injection development oil reservoir, inject the ratio that how many tons of steam could exploit one ton of crude oil; Recovery percent of reserves is the percentage that in an oil reservoir development to arbitrary time, cumulative recovery accounts for original oil in place;
Data acquisition and graphics processing unit, for controlling end water pressure, injection production pressure difference change, temperature, pressure monitoring in model ontology, and generate thermal field, pressure field pattern in real time at computer;
Wherein, described model ontology comprises model ontology shell, isolation layer, bottom aquifer and limit water layer, front and rear cover plate, graphite pads, fastening bolt, simulated injection well, simulated production well, temperature pick up, pressure sensor and temperature sensor interface and pressure sensor interface; This model ontology shell is the cuboid housing that is welded of corrosion resistant plate and arranges flange and cover plate respectively on cuboid housing front panel and rear board; Without interface on cover plate on front panel, the cover plate on rear board there are simulated injection well, simulated production well, hot line even summation pressure guiding pipe interface; Cover plate on front panel and the cover plate on rear board and adopt graphite pads between model ontology housing flange, sealed by fastening bolt; The inner side surrounding of model ontology shell is isolation layer, have employed refractory inorganic binder and carries out applying and hate the thermal insulation material of profit with boning;
Simulated injection well, simulated production well are the stainless steel tube that diameter is 6mm; At the perforated interval of simulated injection well and aboveground of simulated production fluting simulated field Injection Well, producing well, the position of fluting is determined after ratio modelling according to the perforated interval of on-the-spot Injection Well, producing well; Thermocouple and pressure-measuring-point is laid, thermocouple and pressure-measuring-point horizontal spacing 5cm, thermocouple and pressure-measuring-point longitudinal pitch 2.5cm in oil reservoir; Part outside model ontology internal edges water layer, bottom aquifer is " oil reservoir ", for the thermal field in Real-Time Monitoring steam flooding physical simulation experiment, pressure field development condition; Temperature pick up, oil reservoir inside distribution 9 × 21, distributes each 1 at bottom aquifer, limit water layer; Described pressure sensor, oil reservoir inside distribution 5 × 6, distributes each 1 at bottom aquifer, limit water layer;
Described injection unit comprises water source, flow accuracy is not more than the high-precision flow pump of 1.0%, controlled mass dryness fraction steam generator, water source connects the arrival end of high-precision flow pump, high-precision measuring delivery side of pump end connects the arrival end of controlled mass dryness fraction steam generator, the simulated injection well arrival end of the port of export link model body of controlled mass dryness fraction steam generator; Within controlled mass dryness fraction steam generator steam (vapor) outlet distance Injection Well 0.5 meter.
2. oriented perforating steam flooding two-dimensional proportion physical simulation device according to claim 1, is characterized in that, the flange quantity that cuboid housing front panel and rear board are arranged respectively is two.
3. oriented perforating steam flooding two-dimensional proportion physical simulation device according to claim 1, is characterized in that, the simulated injection well location of limit water layer and model ontology is in homonymy, and bottom aquifer is positioned at the bottom of model ontology.
4. oriented perforating steam flooding two-dimensional proportion physical simulation device according to claim 1, it is characterized in that, the simulated production of limit water layer and model ontology is positioned at homonymy, and bottom aquifer is positioned at the bottom of model ontology.
5. oriented perforating steam flooding two-dimensional proportion physical simulation device according to claim 1, it is characterized in that, coolant-temperature gage control unit of the described end comprises heat exchanger, pipeline, circulator bath, heat exchanger is positioned at the inside of bottom aquifer, limit water layer is positioned at the side of model ontology, bottom aquifer is positioned at the bottom of model ontology, circulator bath is positioned at model ontology rear, the port of export of circulator bath is connected with the entrance of heat exchanger, the port of export of heat exchanger is connected with the arrival end of circulator bath, circulator bath, heat exchanger, pipeline forms loop, realize water circulation, for controlling the temperature of end water.
6. use a method for arbitrary described oriented perforating steam flooding two-dimensional proportion physical simulation device of claim 1-5, it comprises the steps:
The first step, set up oriented perforating steam flooding dimensional proportions physical model: simulated injection well, simulated production well, end coolant-temperature gage control unit, end water pressure control unit are installed, bottom aquifer is positioned at the bottom of model ontology, load oil reservoir sand, model ontology front shroud is installed, sealing of bolting on;
Second step, flow process connects: injection unit is connected with the simulated injection well of model ontology, and output metering units is connected with the simulated production well of model ontology, pressure sensor, temperature pick up, data acquisition module, is connected with microcomputer successively; Simulated injection well is connected with injection unit, and simulated production well is connected with output metering units;
3rd step, sets up initial temperature of reservoir condition: Boot Model heat-insulation unit, heats up and thermostatic control to model ontology, the initial temperature condition of simulating oil deposit;
4th step, simulation oil reservoir saturation water, measures the voids volume of oil reservoir;
5th step, simulation oil reservoir saturated oils, starts end water pressure control unit, controls the pressure of end water, obtains the initial pressure condition simulating the initial oil saturation of oil reservoir and simulation oil reservoir;
6th step, steam injection recovery, injection rate is 20 ~ 100cm 3/ min, temperature are 120 ~ 350 DEG C, mass dryness fraction is the moist steam of 20 ~ 80%, and output metering units collects produced fluid; The situation of change that end water pressure controls to produce according to Oil Field pressure is carried out;
7th step, produced fluid is separated, metering output oil mass, the output water yield, output liquid measure, gas oil ratio, recovery percent of reserves;
8th step, analyzes the characteristic of production dynamic of steam injection recovery, i.e. oil production, Liquid output, moisture content, gas oil ratio, recovery percent of reserves and the relation curve rule of time.
CN201310431975.5A 2013-09-18 2013-09-18 Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof Expired - Fee Related CN103485753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310431975.5A CN103485753B (en) 2013-09-18 2013-09-18 Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310431975.5A CN103485753B (en) 2013-09-18 2013-09-18 Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof

Publications (2)

Publication Number Publication Date
CN103485753A CN103485753A (en) 2014-01-01
CN103485753B true CN103485753B (en) 2016-04-06

Family

ID=49826300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310431975.5A Expired - Fee Related CN103485753B (en) 2013-09-18 2013-09-18 Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof

Country Status (1)

Country Link
CN (1) CN103485753B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625992A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 Reasonable liquid extracting method specific to roof ridge fault block oil reservoir
CN105672993B (en) * 2015-12-29 2019-04-09 中国石油大学(北京) Detection method, system and application of bottom water flooding in heavy oil reservoir with bottom water
CN111155987B (en) * 2019-12-30 2021-06-25 中国地质大学(武汉) A method for simulating the edge and bottom water-driven oil recovery of collapsed accumulation reservoirs
CN111119876B (en) * 2019-12-30 2021-05-28 中国地质大学(武汉) An experimental device for simulating the edge and bottom water-driven oil recovery of collapsed accumulation reservoirs
CN112796745B (en) * 2021-02-18 2022-10-11 中海油田服务股份有限公司 Method and device for determining production dynamic data of steam flooding oil reservoir

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998040605A1 (en) * 1997-03-13 1998-09-17 Texaco Development Corporation Combination production of shallow heavy crude
CN101476458A (en) * 2008-12-03 2009-07-08 刘其成 Oil pool development simulation system, oil pool model body and its data processing method
CN202273662U (en) * 2011-08-06 2012-06-13 中国石油化工股份有限公司 Superheated steam generating device and oil displacement physical simulation experimental device with same
CN202381062U (en) * 2011-09-29 2012-08-15 中国石油化工股份有限公司 Three-dimensional physical simulation system for heavy oil horizontal well steam drive
CN102748018A (en) * 2012-07-23 2012-10-24 中国石油天然气股份有限公司 A physical simulation experiment device and method for gas injection huff and puff recovery in heavy oil reservoirs
CN103032057A (en) * 2011-09-29 2013-04-10 中国石油化工股份有限公司 Steam-driven three-dimensional physical simulation system for thick oil horizontal well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998040605A1 (en) * 1997-03-13 1998-09-17 Texaco Development Corporation Combination production of shallow heavy crude
CN101476458A (en) * 2008-12-03 2009-07-08 刘其成 Oil pool development simulation system, oil pool model body and its data processing method
CN202273662U (en) * 2011-08-06 2012-06-13 中国石油化工股份有限公司 Superheated steam generating device and oil displacement physical simulation experimental device with same
CN202381062U (en) * 2011-09-29 2012-08-15 中国石油化工股份有限公司 Three-dimensional physical simulation system for heavy oil horizontal well steam drive
CN103032057A (en) * 2011-09-29 2013-04-10 中国石油化工股份有限公司 Steam-driven three-dimensional physical simulation system for thick oil horizontal well
CN102748018A (en) * 2012-07-23 2012-10-24 中国石油天然气股份有限公司 A physical simulation experiment device and method for gas injection huff and puff recovery in heavy oil reservoirs

Also Published As

Publication number Publication date
CN103485753A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103452540B (en) Limit water viscous oil field operated by steam two-dimensional proportion physical simulation device and using method thereof
CN103452541B (en) Heavy oil reservoir with edge and bottom water steam flooding dimensional proportions physical simulating device and using method thereof
CN201396129Y (en) Oil deposit steam-injection thermal-recovery multi-way interlock three-dimensional ratio simulation system
CN101476458B (en) Oil pool development simulation system, oil pool model body and its data processing method
CN102590456B (en) Device and method for simulating volume fracturing of horizontal well on shale reservoir stratum
CN103032057B (en) Steam-driven three-dimensional physical simulation system for thick oil horizontal well
CN105571647B (en) Exploitation of gas hydrates multiple physical field Evolution Simulation test device and method
CN105156102B (en) Bottom water reservoir water energy three-dimensional physical simulation device and method
CN103048431B (en) Hydrofracture propping agent settlement and permeability testing device
CN206339523U (en) The experimental rig of concrete three-dimensional stress thermal chemical damage coupling
CN100594288C (en) A reservoir development simulation system, overlying pressure system and data processing method thereof
CN103485753B (en) Oriented perforating steam flooding two-dimensional proportion physical simulation device and using method thereof
CN103091358B (en) Indoor model test apparatus for ground source heat pump rock soil thermal response testing and application thereof
CN109344547B (en) Freezing method model design method and device under combined stratum seepage effect
CN102720476A (en) O-shaped well physical simulation experiment device
CN104405356A (en) Horizontal well steam drive two-dimensional physical simulation experimental device for thin bed heavy oil reservoir
CN101344515A (en) Permeability tester
CN202381062U (en) Three-dimensional physical simulation system for heavy oil horizontal well steam drive
CN103527182B (en) Viscous crude gravity water drainage assisted steam flooding vertical point of different experimental facilities
CN205063944U (en) Three -dimensional physical simulation device of bottom water oil reservoir water energy
CN204267011U (en) Thin heavy oil horizontal well steam flooding two-dimensional physical analogue experiment installation
CN102373918B (en) Intermittent Production Simulation Experimental Device for Low Permeability Reservoir Oil Wells
CN105954459A (en) Device for detecting influence of coal mine goaf gas drainage on coal spontaneous combustion
CN106401577A (en) Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well
CN115596433A (en) A Heterogeneous Reservoir Seepage Simulation System

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201201

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: PetroChina Company Limited

Address before: 124010 No. 95, oil street, Xinglongtai District, Liaoning, Panjin

Patentee before: Zhang Fangli

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

CF01 Termination of patent right due to non-payment of annual fee