CN102776971B - Curtain wall - Google Patents
Curtain wall Download PDFInfo
- Publication number
- CN102776971B CN102776971B CN201210276978.1A CN201210276978A CN102776971B CN 102776971 B CN102776971 B CN 102776971B CN 201210276978 A CN201210276978 A CN 201210276978A CN 102776971 B CN102776971 B CN 102776971B
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- spur gear
- crossbeam
- groove
- glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明主要公开了一种新型幕墙,包括中空玻璃、立柱、横梁;其中立柱和横梁之间采用连接节点一连接,形成结构主体,中空玻璃和横梁之间采用连接节点二连接。中空玻璃组装于连接节点二上,形成隐框式幕墙体系。本发明中该结构的新型幕墙,对现有幕墙的结构进行了改革,开创了幕墙体系中隐框式幕墙的新式结构,结构受力合理,外观整洁大方,组装安全灵活。
The present invention primarily discloses a novel curtain wall comprising insulating glass, columns, and beams. The columns and beams are connected by a first connection node to form the main structure, while the insulating glass and beams are connected by a second connection node. The insulating glass is assembled at the second connection node to form a concealed-frame curtain wall system. This novel curtain wall structure, introduced in the present invention, reforms existing curtain wall structures and creates a new type of concealed-frame curtain wall structure within the curtain wall system. It features rational structural stress distribution, a neat and elegant appearance, and safe and flexible assembly.
Description
技术领域 technical field
本发明涉及幕墙装饰技术领域,特别与一种新型幕墙系统有关。 The invention relates to the technical field of curtain wall decoration, in particular to a novel curtain wall system.
背景技术 Background technique
原有幕墙构造节点种类繁多,几乎每个工程的型材都不一样,要不断地更新模具进行铝型材加工,浪费很大。幕墙的连接节点也是千差万别,没有统一的普遍规律,配件的规格和种类更是无章可循,不能统配通用。具体问题主要表现在以下几个方面: There are many types of nodes in the original curtain wall structure, and the profiles of almost every project are different. It is very wasteful to constantly update the molds for aluminum profile processing. The connection nodes of the curtain wall are also very different, and there is no unified general rule. The specifications and types of accessories are even more chaotic and cannot be universally configured. The specific problems are mainly manifested in the following aspects:
1、玻璃的副框一般都是在中空玻璃的外侧二次粘接完成,增加了成本,质量也难以保证。同时,由于副框有一定的宽度,使得幕墙玻璃的重心相对于立柱和横梁有较大的偏心距,受力状况不太合理。 1. The sub-frame of the glass is generally completed by secondary bonding on the outside of the insulating glass, which increases the cost and is difficult to guarantee the quality. At the same time, due to the certain width of the auxiliary frame, the center of gravity of the curtain wall glass has a large eccentricity relative to the column and beam, and the stress situation is not reasonable.
2、在幕墙的立柱与横梁的连接中,传统的连接方法是在横梁设计时考虑有闭口腔和开口腔两个部分,在开口腔内,用连接角码通过紧固件与立柱连接后再用盖板封闭,以达到横梁外形平整美观的目的。但是,由于立柱和横梁用连接角码的操作行为是在横梁的开口腔内完成的,操作空间较小,能拧入紧固件的数量和间距都受到限制,紧固件不能充分地分布到横梁的四角部位,使得连接固定的效果不太理想。例如中国专利ZL201010520015中,提出一种楔式连接结构,包括立柱、横梁、芯套、连接角码,芯套设于横梁内,连接角码固定在立柱上,然后将芯套与连接角码通过螺杆等紧固件紧定固定。尽管在该结构中连接角码与横梁直接固定,而且是通过一个芯套进行连接,但是这种连接方式仍然是在横梁的开口腔内完成,操作空间局限,固定安装方式也无法灵活调整,最终影响到横梁和立柱连接的受力稳定性。 2. In the connection between the column and the beam of the curtain wall, the traditional connection method is to consider two parts of the closed cavity and the open cavity in the design of the beam. In the open cavity, use the connecting angle code to connect the column with the fastener and then It is closed with a cover plate to achieve the purpose of smooth and beautiful appearance of the beam. However, since the operation of the connecting angle brackets for columns and beams is completed in the opening of the beam, the operating space is small, the number and spacing of the fasteners that can be screwed in are limited, and the fasteners cannot be fully distributed. The four corners of the crossbeam make the effect of connection and fixation not ideal. For example, in the Chinese patent ZL201010520015, a wedge-type connection structure is proposed, including a column, a beam, a core sleeve, and a connecting corner. The core is set in the beam, and the connecting corner is fixed on the column. Fasteners such as screws are tightly fixed. Although in this structure the connecting angle bracket is directly fixed to the beam, and is connected through a core sleeve, this connection method is still completed in the opening of the beam, the operating space is limited, and the fixed installation method cannot be adjusted flexibly. Affects the stress stability of the connection between the beam and the column.
3、在现有幕墙连接节点的设计中,承受上部幕墙水平荷载的挂钩,承受幕墙自重荷载的托板,以及承受下部幕墙水平荷载的压板等配件都是独立分开的。不单种类较多,而且不能协同作用,安装也不方便。 3. In the design of the existing curtain wall connection nodes, the hooks bearing the horizontal load of the upper curtain wall, the supporting plate bearing the self-weight load of the curtain wall, and the pressure plate bearing the horizontal load of the lower curtain wall are all separated independently. Not only are there many types, but also they cannot work together, and installation is also inconvenient.
为了解决上述问题,本发明人设计出一种全新的幕墙,适用于各种形式的幕墙。 In order to solve the above problems, the inventor has designed a brand-new curtain wall, which is applicable to various forms of curtain walls.
发明内容 Contents of the invention
本发明的主要目的是提供一种幕墙,将原来在横梁开口腔内的操作改为可以在横梁外面操作,不但操作方便,而且能使横梁的抗压弯强度和抗扭强度得到充分利用,确保立柱和横梁之间的抗压弯强度和抗扭强度,安装方式灵活方便。 The main purpose of the present invention is to provide a curtain wall, which can change the original operation inside the opening of the beam to be operated outside the beam. The compressive bending strength and torsional strength between the column and the beam, and the installation method is flexible and convenient.
本发明中提供的中空玻璃,确保满足原有中空玻璃各项性能指标的前提下,可以在后期的幕墙应用中,节省了幕墙玻璃的副框等材料,避免了由于粘接副框而造成的二次环境污染。 The insulating glass provided in the present invention can save materials such as the sub-frame of the curtain wall glass in the later application of the curtain wall under the premise of ensuring that the various performance indicators of the original insulating glass are met, and avoid the damage caused by bonding the sub-frame. Secondary environmental pollution.
另外,本发明中所提出的幕墙连接节点,实现挂钩、托板以及其他配件都结合成一体,提高了节点处的受力强度。 In addition, the curtain wall connection node proposed in the present invention realizes the integration of the hook, the supporting plate and other accessories, and improves the stress strength at the node.
为了达到上述目的,本发明通过以下技术方案来实现: In order to achieve the above object, the present invention is achieved through the following technical solutions:
一种幕墙,包括中空玻璃、立柱、横梁;其中立柱和横梁之间采用连接节点一连接,形成结构主体,中空玻璃和横梁之间采用连接节点二连接;中空玻璃组装于连接节点二上,形成隐框式幕墙体系。 A curtain wall, comprising hollow glass, columns, and beams; wherein the columns and beams are connected by connection node 1 to form a structural main body, and the hollow glass and beams are connected by connection node 2; the hollow glass is assembled on the connection node 2 to form Hidden frame curtain wall system.
本发明通过以下技术方案进一步完善: The present invention is further improved through the following technical solutions:
所述的连接节点一包括:有齿销栓、直齿圆柱齿轮、套芯;套芯设置在横梁内部,套芯内部设置有相互垂直、分别用于安装有齿销栓的销栓孔和安装直齿圆柱齿轮的齿轮孔,销栓孔和齿轮孔在相交处相通,有齿销栓、直齿圆柱齿轮安装在各自孔内,相互啮合,旋转直齿圆柱齿轮带动有齿销栓穿入立柱连接孔形成连接。 The first connection node includes: a toothed pin, a spur gear, and a sleeve core; the sleeve core is arranged inside the beam, and the inside of the sleeve core is provided with pin holes and mounting holes that are perpendicular to each other and are respectively used for installing the toothed pin. The gear hole of the spur gear, the pin hole and the gear hole are connected at the intersection, the toothed pin and the spur gear are installed in their respective holes, and mesh with each other, and the rotating spur gear drives the toothed pin to penetrate the column The connection hole forms the connection.
所述的直齿圆柱齿轮的一端为一字槽口;连接节点一还包括紧固螺钉,在直齿圆柱齿轮带动有齿销栓穿入立柱连接孔形成连接后,紧固螺钉在一字槽口中斜向旋入将直齿圆柱齿轮固定套芯上。 One end of the straight-toothed cylindrical gear is a slot; the connection node one also includes a fastening screw, and after the spur gear drives the toothed pin to penetrate the connecting hole of the column to form a connection, the fastening screw is in the slot Screw the spur gear into the fixed sleeve core obliquely in the mouth. the
所述的连接节点二包括固定件、插件、紧固件;在横梁上设置有用于钩住固定件的沟槽,固定件钩住沟槽侧部,由插件插入沟槽中间且外部扣住固定件,紧固件穿过插件与横梁连接成一体。 The second connecting node includes a fixing piece, a plug-in, and a fastener; a groove for hooking the fixing piece is arranged on the beam, the fixing piece is hooked to the side of the groove, and the plug-in is inserted into the middle of the groove and the outside is fastened and fixed The fastener passes through the insert and is connected with the beam as a whole. the
所述的固定件为对称两个,或者为一个,且横梁的沟槽一侧延伸形成L型挂钩,插件在对应L型挂钩的一侧设置有水平延伸的托板。 There are two or one fixing piece symmetrically, and one side of the groove of the crossbeam extends to form an L-shaped hook, and the plug-in is provided with a horizontally extending support plate on the side corresponding to the L-shaped hook.
所述的中空玻璃包括两片玻璃、两片玻璃之间形成的中空层、装有干燥剂的间隔框、内层密封胶、金属型材、外层密封结构胶;间隔框布置在中空层四周,且间隔框的两侧面用内层密封胶与两片玻璃粘接形成的中空层是密闭的,间隔框的外端与两片玻璃组成凹槽,在凹槽内放入金属型材,金属型材和凹槽之间填充外层密封结构胶。 The hollow glass includes two pieces of glass, a hollow layer formed between the two pieces of glass, a spacer frame with a desiccant, an inner layer sealant, a metal profile, and an outer layer sealing structure glue; the spacer frame is arranged around the hollow layer, And the hollow layer formed by bonding the two sides of the spacer frame with the inner sealant and the two pieces of glass is airtight, and the outer end of the spacer frame forms a groove with the two pieces of glass, and puts the metal profile in the groove, and the metal profile and The outer sealing structure glue is filled between the grooves. the
所述的金属型材为U形结构,其U形内端头为向外突起的圆形部,U形的开口部向外扩大,呈喇叭状。 The metal profile is a U-shaped structure, the U-shaped inner end is a circular part protruding outwards, and the opening of the U-shaped part expands outwards, forming a trumpet shape.
所述的金属型材的圆形部外侧为锯齿状结构。 The outer side of the circular part of the metal profile is a zigzag structure.
所述的中空玻璃之间加装装饰框,装饰框包括隔热垫块、密封橡胶条、压板、紧固件、装饰线条;隔热垫块嵌在两个中空玻璃之间的缝隙中,内侧凹槽中嵌入有密封橡胶条的压板压住隔热垫块,通过紧固件将隔热垫块和压板穿过连接节点二的插件,一起固定在横梁上,装饰线条扣在压板外部的卡口上。 A decorative frame is installed between the hollow glasses, and the decorative frame includes a heat insulation pad, a sealing rubber strip, a pressure plate, a fastener, and a decorative line; the heat insulation pad is embedded in the gap between the two hollow glasses, and the inner side The pressure plate with the sealing rubber strip embedded in the groove presses the heat insulation pad, and the heat insulation pad and the pressure plate pass through the plug-in connecting node 2 through fasteners, and are fixed on the beam together, and the decorative lines are buckled on the outside of the pressure plate. verbal.
所述的装饰框为横向装饰框或者竖向装饰框。 The decorative frame is a horizontal decorative frame or a vertical decorative frame.
采用上述方案后,本发明具有诸多有益效果: After adopting the above scheme, the present invention has many beneficial effects:
首先利用立柱与横梁连接节点一将幕墙的立柱和横梁组装成幕墙的结构主体,再利用幕墙连接节点二将中空玻璃和立柱与横梁连接节点装配组合成新型的隐框幕墙体系。另外,本发明中可根据需要,增加横向装饰框则变成了横明竖隐幕墙体系;增加竖向装饰框则变成了竖明横隐幕墙体系;同时增加横向装饰框和竖向装饰框则变成了全明框的幕墙体系。该结构的新型幕墙,对现有幕墙的结构进行了改革,开创了幕墙体系中隐框式幕墙的新式结构,结构受力合理,外观整洁大方,组装安全灵活。 Firstly, the columns and beams of the curtain wall are assembled into the structural main body of the curtain wall by using the connection node 1 of the column and the beam, and then the hollow glass and the connection node of the column and the beam are assembled and combined by the connection node 2 of the curtain wall to form a new hidden frame curtain wall system. In addition, in the present invention, the horizontal decorative frame can be added to form a horizontally exposed and vertically hidden curtain wall system; the vertical decorative frame can be added to form a vertically exposed, horizontally hidden curtain wall system; Then it becomes a curtain wall system with full bright frame. The new curtain wall of this structure reforms the structure of the existing curtain wall and creates a new structure of hidden frame curtain wall in the curtain wall system. The structure has reasonable force, neat and elegant appearance, and safe and flexible assembly. the
另外,在本发明中提出的有关立柱和横梁的连接节点一,克服了现有立柱横梁中存在的操作空间小,能拧入紧固件的数量和间距都受到限制的问题。使得立柱与横梁装配操作通过直齿圆柱齿轮来实现,操作空间大,而且装配方便简单,受力稳定。 In addition, the connection node 1 between the column and the beam proposed in the present invention overcomes the problems in the existing column and beam that the operating space is small, and the number and spacing of fasteners that can be screwed in are limited. The assembly operation of the column and the beam is realized through the spur gear, the operation space is large, the assembly is convenient and simple, and the force is stable.
还有,本发明中提出的中空玻璃和横梁的连接节点二,确保连接节点二中各个组成配件形成一体式结构,提高了整体协同作用效果,增加了整个构件的抗压弯和抗扭强度。 In addition, the connection node 2 between the hollow glass and the beam proposed in the present invention ensures that each component in the connection node 2 forms an integrated structure, which improves the overall synergistic effect and increases the bending and torsional strength of the entire component.
同时,本发明中的中空玻璃,确保满足原有中空玻璃各项性能指标的前提下,可以在后期的幕墙应用中,节省了幕墙玻璃的副框等材料,避免了由于粘接副框而造成的二次环境污染。 At the same time, the insulating glass in the present invention can save materials such as the sub-frame of the curtain wall glass in the later application of the curtain wall under the premise of ensuring that the performance indicators of the original insulating glass are met, and avoid the damage caused by bonding the sub-frame. secondary environmental pollution.
附图说明 Description of drawings
图1为本发明较佳实施例中横明竖隐幕墙体系示意图; Fig. 1 is a schematic diagram of the horizontal, bright and vertical hidden curtain wall system in a preferred embodiment of the present invention;
图2为本发明较佳实施例中竖明横隐幕墙体系示意图; Fig. 2 is a schematic diagram of the vertically visible and horizontally concealed curtain wall system in a preferred embodiment of the present invention;
图3为图1中横向装饰框装配示意图; Fig. 3 is a schematic diagram of assembling the horizontal decorative frame in Fig. 1;
图4为图1中连接节点二组装示意图; Fig. 4 is a schematic diagram of connecting node 2 assembly in Fig. 1;
图5为图1中连接节点一外部示意图; Fig. 5 is a schematic diagram of an external connection node in Fig. 1;
图6为图5中1-1剖面示意图; Fig. 6 is a schematic sectional view of 1-1 in Fig. 5;
图7为图6中2-2剖面示意图; Fig. 7 is a schematic sectional view of 2-2 in Fig. 6;
图8为图7中A部放大示意图; Fig. 8 is an enlarged schematic diagram of part A in Fig. 7;
图9为本发明较佳实施例中连接节点一的有齿销栓示意图; Fig. 9 is a schematic diagram of a toothed pin connecting node 1 in a preferred embodiment of the present invention;
图10为本发明较佳实施例中连接节点一的直齿圆柱齿轮剖面图; Fig. 10 is a sectional view of a spur gear connected to node 1 in a preferred embodiment of the present invention;
图11为本发明较佳实施例中连接节点一的直齿圆柱齿轮端面图; Fig. 11 is the end view of the spur gear connecting node 1 in the preferred embodiment of the present invention;
图12为本发明较佳实施例中连接节点一的套芯剖面示意图; Fig. 12 is a schematic cross-sectional view of the sleeve core connecting node 1 in a preferred embodiment of the present invention;
图13为图12中3-3剖面示意图; Fig. 13 is a schematic sectional view of 3-3 in Fig. 12;
图14为本发明中横梁截面示意图二; Fig. 14 is the cross-sectional schematic diagram II of the beam in the present invention;
图15为本发明中套芯安装示意图二; Fig. 15 is the second schematic diagram of sleeve core installation in the present invention;
图16为图15中的套芯放大示意图; Fig. 16 is an enlarged schematic view of the sleeve core in Fig. 15;
图17为本发明中套芯安装示意图三; Fig. 17 is the third schematic diagram of sleeve core installation in the present invention;
图18为图17中的套芯放大示意图; Fig. 18 is an enlarged schematic view of the sleeve core in Fig. 17;
图19为图3中竖向装饰框装配示意图; Fig. 19 is a schematic diagram of assembling the vertical decorative frame in Fig. 3;
图20为图3中连接节点二组装示意图; Fig. 20 is a schematic diagram of connecting node 2 assembly in Fig. 3;
图21为本发明较佳实施例中的中空玻璃结构示意图; Fig. 21 is a schematic diagram of the structure of insulating glass in a preferred embodiment of the present invention;
图22为中空玻璃中金属构件的结构示意图二; Fig. 22 is a structural schematic diagram II of metal components in insulating glass;
图23为中空玻璃中金属构件的结构示意图三; Figure 23 is a structural schematic diagram three of the metal components in the insulating glass;
图24为中空玻璃中金属构件的结构示意图四。 Figure 24 is a structural schematic diagram IV of metal components in insulating glass.
具体实施方式 Detailed ways
结合附图,对本发明较佳实施例做进一步详细说明。 The preferred embodiments of the present invention will be described in further detail in conjunction with the accompanying drawings.
本发明为一种幕墙,主要涉及到的大部件有中空玻璃1、连接节点一2、连接节点二3、横向装饰框4、竖向装饰框5、立柱21、横梁22。 The present invention is a curtain wall, and mainly involves large parts including hollow glass 1 , connection node 1 , connection node 2 3 , horizontal decorative frame 4 , vertical decorative frame 5 , column 21 , and beam 22 .
首先利用连接节点一2将幕墙的立柱21和横梁22组装成幕墙的结构主体,再将中空玻璃1和连接节点二3装配组合成新型的隐框幕墙体系。根据需要,增加横向装饰框4则变成了横明竖隐幕墙体系,如图1、图3;增加竖向装饰框5则变成了竖明横隐幕墙体系,如图2、图19。同时增加横向装饰框4和竖向装饰框5则变成了全明框的幕墙体系。 First, the columns 21 and beams 22 of the curtain wall are assembled into the structural main body of the curtain wall by using the connection node 1 2, and then the insulating glass 1 and the connection node 2 3 are assembled to form a new type of hidden frame curtain wall system. According to needs, adding the horizontal decorative frame 4 becomes a horizontally visible and vertically hidden curtain wall system, as shown in Figure 1 and Figure 3; adding a vertical decorative frame 5 becomes a vertically bright, horizontally hidden curtain wall system, as shown in Figure 2 and Figure 19. Adding the horizontal decorative frame 4 and the vertical decorative frame 5 at the same time becomes a curtain wall system with full bright frames.
下面对各个大部件进行详细描述: The following is a detailed description of each major component:
中空玻璃1,参见图21至图24,主要包括两片玻璃11、玻璃之间形成的中空层12、装有干燥剂的间隔框13、内层密封胶14、金属型材15、外层密封结构胶16。 Insulating glass 1, see Figure 21 to Figure 24, mainly includes two pieces of glass 11, a hollow layer 12 formed between the glass, a spacer frame 13 filled with desiccant, inner sealant 14, metal profiles 15, outer sealing structure glue16.
在两片玻璃11之间的四周布置装有干燥剂的间隔框13,并在间隔框13的两侧面打上内层密封胶14进行密封固定。间隔框13与两片玻璃11粘接形成的密闭空间就是中空层12。在内层密封胶14凝固定型后,间隔框13的外侧与两片玻璃11之间就形成凹槽17,在凹槽17内放入金属型材15,然后凹槽17和金属型材15之间的空隙内打上外层密封结构胶16。 A spacer frame 13 equipped with a desiccant is arranged around the two pieces of glass 11, and an inner sealant 14 is applied on both sides of the spacer frame 13 for sealing and fixing. The airtight space formed by bonding the spacer frame 13 and the two pieces of glass 11 is the hollow layer 12 . After the inner layer sealant 14 is solidified and fixed, a groove 17 is formed between the outer side of the spacer frame 13 and the two pieces of glass 11, and the metal profile 15 is placed in the groove 17, and then the groove 17 and the metal profile 15 are formed. Put the outer layer sealing structure glue 16 in the gap.
在此,金属型材15呈一个U形结构,其U形内端设计成圆形部151,增大与外层密封结构胶16的接触面积,使外层密封结构胶16不会由于金属型材15有尖角而局部出现应力疲劳破坏。该圆形部151还可以增加金属型材15的U型口弹性,使其能与外层密封结构胶16同步协同作用,一起承担作用于玻璃11上的外力。为进一步增加金属型材15与外层密封结构胶16的接触面积,在金属型材的圆形底部的外侧还可以设计成锯齿状结构,如图21和图22。同时为方便安装,在金属型材15的U型开口部152向外扩大,呈喇叭状。可以是局部扩大,如图21和图23,也可以是整个开口部152向外扩大,如图22和图24。 Here, the metal profile 15 is in a U-shaped structure, and its U-shaped inner end is designed as a circular part 151, which increases the contact area with the outer sealing structural adhesive 16, so that the outer sealing structural adhesive 16 will not be damaged by the metal profile 15. There are sharp corners and local stress fatigue damage occurs. The circular portion 151 can also increase the elasticity of the U-shaped opening of the metal profile 15 , so that it can synchronously and synergistically cooperate with the outer sealing structure glue 16 to bear the external force acting on the glass 11 together. In order to further increase the contact area between the metal profile 15 and the outer sealant 16, the outside of the circular bottom of the metal profile can also be designed as a zigzag structure, as shown in Figure 21 and Figure 22. At the same time, for the convenience of installation, the U-shaped opening 152 of the metal profile 15 expands outwards and is in the shape of a trumpet. It can be partially expanded, as shown in Figure 21 and Figure 23 , or the entire opening 152 can be expanded outward, as shown in Figure 22 and Figure 24 .
连接节点一2主要是将立柱21和横梁22进行连接的节点,参见图5至图13,主要包括有齿销栓23、紧固螺钉24、直齿圆柱齿轮25、套芯26。 Connection node one 2 is mainly the node that connects the column 21 and the beam 22, referring to Fig. 5 to Fig. 13 , it mainly includes a toothed pin 23, a fastening screw 24, a spur gear 25, and a sleeve core 26.
在本发明中,横梁22可以设计成为完整的闭合腔,提高横梁22的抗压弯强度和抗扭强度。在横梁22的腔内设计一个能套入套芯26的空间,套芯26可以根据横梁22的截面尺寸进行切割或定制。 In the present invention, the crossbeam 22 can be designed as a complete closed cavity to improve the compressive bending strength and torsional strength of the crossbeam 22 . In the cavity of the crossbeam 22, a space that can be inserted into the sleeve core 26 is designed, and the sleeve core 26 can be cut or customized according to the cross-sectional size of the crossbeam 22.
在套芯26的内部设有一个圆形的通腔,作为安装直齿圆柱齿轮25的齿轮孔262,直齿圆柱齿轮的一端设有一字槽口251。在垂直于套芯26的齿轮孔262方向上,根据横梁22的截面尺寸在套芯上钻有销栓孔261,销栓孔261的数量一般至少为两个,这样使得横梁22确保稳定固定在立柱21中。在两个销栓孔261中分别放入两个有齿销栓23。销栓孔261和齿轮孔262相交处相通。同时,有齿销栓23的齿距和直齿圆柱齿轮25的齿距是相互匹配啮合的。这样当两者各自安装后,确保有齿销栓23和直齿圆柱齿轮25相互啮合。 A circular cavity is provided inside the sleeve core 26 as a gear hole 262 for installing the spur gear 25 , and one end of the spur gear is provided with a slot 251 . In the direction perpendicular to the gear hole 262 of the sleeve core 26, a pin hole 261 is drilled on the sleeve core according to the cross-sectional size of the crossbeam 22. The number of the pinholes 261 is generally at least two, so that the crossbeam 22 is guaranteed to be stably fixed on the sleeve core. Column 21. Two toothed pins 23 are placed in the two pin holes 261 respectively. The intersection of the pin hole 261 and the gear hole 262 communicates. At the same time, the tooth pitch of the toothed pin 23 and the tooth pitch of the spur gear 25 are matched and meshed with each other. After the two are installed separately like this, ensure that the toothed pin 23 and the spur gear 25 are meshed with each other.
在面向室外的横梁22外侧,对应直齿圆柱齿轮25的中心开设一个圆孔221,该圆孔221小于直齿圆柱齿轮25的内切圆。在立柱上对应有齿销栓23的位置开设两个圆孔211。安装时,用一字螺丝刀穿过横梁的圆孔221插入到直齿圆柱齿轮25一端的一字槽口251中,进行扭转直齿圆柱齿轮25工作,直齿圆柱齿轮25则带动两个有齿销栓23进行水平移动,直到有齿销栓23插入立柱上的两个圆孔211并且完全啮合为止。 On the outside of the beam 22 facing outdoors, a circular hole 221 is opened corresponding to the center of the spur gear 25 , and the circular hole 221 is smaller than the inscribed circle of the spur gear 25 . Two circular holes 211 are provided at positions corresponding to the toothed pins 23 on the column. During installation, use a flat-blade screwdriver to pass through the round hole 221 of the beam and insert it into the slot 251 at one end of the spur gear 25 to rotate the spur gear 25, and the spur gear 25 drives two gears with teeth. The pin bolt 23 moves horizontally until the toothed pin bolt 23 is inserted into the two circular holes 211 on the column and fully engaged. the
为防止直齿圆柱齿轮25的松动,紧固螺钉24通过横梁22的圆孔221插入到直齿圆柱齿轮25一端的一字槽口251中,继续拧入直到紧固螺钉24拧入横梁22的侧壁固定,同时卡紧在直齿圆柱齿轮的一字槽口251中,使得直齿圆柱齿轮25不再能够旋转,有效防止直齿圆柱齿轮25回旋退出,从而使得有齿销栓23固定不动,达到与立柱21有效连接的目的,连接完毕后用密封胶将221孔密封。如果需要横梁22位置变动或替换时,只要将紧固螺钉24拧出后,反方向旋转直齿圆柱齿轮25带动有齿销栓23退出立柱上的两个圆孔211即可。 In order to prevent the spur gear 25 from loosening, the fastening screw 24 is inserted into the slot 251 at one end of the spur gear 25 through the round hole 221 of the cross beam 22, and continues to be screwed in until the fastening screw 24 is screwed into the cross beam 22. The side wall is fixed, and at the same time, it is clamped in the slot 251 of the spur gear, so that the spur gear 25 can no longer rotate, effectively preventing the spur gear 25 from turning and withdrawing, so that the toothed pin 23 is not fixed. Move, reach the purpose that is effectively connected with column 21, after connection finishes, 221 holes are sealed with sealant. If the position of crossbeam 22 needs to be changed or replaced, as long as fastening screw 24 is unscrewed, reverse direction rotation of spur gear 25 drives toothed pin bolt 23 to withdraw from two circular holes 211 on the column. the
另外,这里需要说明的是,根据实际横梁22的内部结构,套芯26的固定方式也可以根据实际情况而定,如图6中,横梁22的内部具有凸筋,可有效卡住套芯26。又如图14,横梁22的截面发生变化成为截面28时,没有凸筋可依,则可以采用紧定螺钉27的方式将套芯26和横梁28固定。 In addition, what needs to be explained here is that, according to the internal structure of the actual beam 22, the fixing method of the sleeve core 26 can also be determined according to the actual situation. As shown in FIG. . As shown in Fig. 14 again, when the cross-section of the cross-beam 22 changes into a cross-section 28, there is no rib to rely on, so the set screw 27 can be used to fix the core 26 and the cross-beam 28.
当然,套芯26内部的销栓孔261的结构方式也可以做适当调整。在图5至图14中,销栓孔261为全封闭在套芯26的内部,而如图15、图16所示,该结构的销栓孔261可以是一种半封闭状态,有齿销栓23安装至销栓孔261后,局部可裸露在套芯26表面。且套芯26也可视情况而设计成填充于整个横梁22的内腔中,如图17和图18中,也可以如前面所示,只布设于横梁22的局部空间。 Of course, the structure of the pin hole 261 inside the sleeve core 26 can also be properly adjusted. In Fig. 5 to Fig. 14, the pin hole 261 is fully enclosed inside the sleeve core 26, and as shown in Fig. After the bolt 23 is installed in the pin hole 261 , a part may be exposed on the surface of the sleeve core 26 . And the sleeve core 26 can also be designed to be filled in the inner cavity of the entire crossbeam 22 depending on the situation, as shown in Fig. 17 and Fig. 18, and can also be arranged only in a partial space of the crossbeam 22 as shown above. the
连接节点二3参见图4,主要是形成在横梁22上,用于连接装配中空玻璃。主要包括插件32、紧固件33、固定件34。在横梁22的表面上设置有一个沟槽31,沟槽31的一侧设计有向外延伸而出的L型挂钩35,用来承担上部中空玻璃1的水平荷载。固定件34呈 “ㄇ”形,其两端在同一平面上形成弯钩,前端的弯钩可以嵌进到横梁22的沟槽31中钩住凹进部位,固定件34后端的弯钩用来压紧下部中空玻璃1,用来承担下部中空玻璃的水平荷载。 The connection node 2 3 is shown in FIG. 4 , which is mainly formed on the beam 22 and is used for connecting and assembling insulating glass. It mainly includes a plug-in 32 , a fastener 33 and a fixing piece 34 . A groove 31 is provided on the surface of the beam 22 , and one side of the groove 31 is designed with an L-shaped hook 35 extending outwards to bear the horizontal load of the upper insulating glass 1 . The fixing part 34 is in the shape of "ㄇ", and its two ends form a crotch on the same plane. The crotch at the front end can be embedded in the groove 31 of the beam 22 to hook the recessed part. The crotch at the rear end of the fixing part 34 is used to Compress the lower insulating glass 1 to bear the horizontal load of the lower insulating glass.
插件32可以插入横梁22上的沟槽31中间,上下侧部抵住L型挂钩35和固定件34。插件32上对应L型挂钩35的一侧设置有水平突出的托板36,用于承担上部中空玻璃1的自重。插件32的后端倒钩321可以将L型挂钩35和固定件34钩住,使得三者啮合在一起,最后紧固件33穿过插件32,将其和横梁22进行连接。这样,横梁22上的L型挂钩35、插件32和固定件34共同作用,加强了插件32上托板36的强度,提高了整体协同作用效果,增加了整个构件的抗压弯和抗扭强度。 The insert 32 can be inserted into the middle of the groove 31 on the beam 22 , and the upper and lower sides are against the L-shaped hook 35 and the fixing piece 34 . A side of the insert 32 corresponding to the L-shaped hook 35 is provided with a horizontally protruding supporting plate 36 for bearing the weight of the upper insulating glass 1 . The rear barb 321 of the inserter 32 can hook the L-shaped hook 35 and the fixing member 34 so that the three are engaged together, and finally the fastener 33 passes through the inserter 32 to connect it with the beam 22 . In this way, the L-shaped hook 35 on the beam 22, the plug-in 32 and the fixing piece 34 work together to strengthen the strength of the supporting plate 36 on the plug-in 32, improve the overall synergistic effect, and increase the bending resistance and torsional strength of the entire component. .
上述的连接节点二3针对横向装饰幕墙结构,又如图2、图19、图20中的竖向装饰幕墙结构,其连接节点二3可以包括两个固定件34,而在立柱21上取消L型挂钩35,由此立柱21上的沟槽31需要两端对称,两侧都安装有固定件34,分别用于固定左右两侧中空玻璃1。然后插件32夹在固定件34中间,插入沟槽31中部,且插件32的外端同样方式钩住固定件34,再由紧固件33穿过插件32与立柱21连接成一体。 The above connection node 2 3 is aimed at the horizontal decorative curtain wall structure, and the vertical decorative curtain wall structure in Fig. 2, Fig. 19 and Fig. 20, its connection node 2 3 can include two fixing parts 34, and cancel the L on the column 21 type hook 35, thus the groove 31 on the column 21 needs to be symmetrical at both ends, and both sides are equipped with fixing parts 34, which are respectively used to fix the insulating glass 1 on the left and right sides. Then the inserter 32 is clamped in the middle of the fixture 34, inserted into the middle of the groove 31, and the outer end of the inserter 32 hooks the fixture 34 in the same way, and then the fastener 33 passes through the inserter 32 and is connected to the column 21 as a whole.
在该结构中,沟槽31竖向布置,为防止安装时上述配件沿着沟槽31向下滑落,还设置有角码37,角码37通过角码紧固件38固定在立柱21上,角码37的水平部就做为其余部件的水平基托。在安装时首先将角码37通过角码紧固件38和立柱21连接后,即可以防止其他后装配件下滑。 In this structure, the groove 31 is arranged vertically. In order to prevent the above-mentioned accessories from sliding down along the groove 31 during installation, a corner bracket 37 is also provided. The corner bracket 37 is fixed on the column 21 through a corner bracket fastener 38. The horizontal portion of angle sign indicating number 37 is just used as the horizontal base of all the other parts. After first connecting the angle code 37 with the column 21 through the angle code fastener 38 during installation, other rear assembly parts can be prevented from sliding down.
横向装饰框4、竖向装饰框5可以针对不同要求的幕墙结构进行外部装饰。横向装饰框4包括隔热垫块41、密封橡胶条42、压板43、紧固件44、装饰线条45。而竖向装饰框5也同样包括隔热垫块51、密封橡胶条52、压板53、紧固件54、装饰线条55。两者结构和原理相同,本发明就其中一处进行展开说明。 The horizontal decorative frame 4 and the vertical decorative frame 5 can be externally decorated according to different requirements of the curtain wall structure. The horizontal decorative frame 4 includes a heat insulating pad 41 , a sealing rubber strip 42 , a pressing plate 43 , a fastener 44 , and a decorative line 45 . The vertical decorative frame 5 also includes a heat insulating pad 51 , a sealing rubber strip 52 , a pressing plate 53 , a fastener 54 , and a decorative line 55 . Both structures and principles are the same, and the present invention will be described on one of them.
隔热垫块41嵌在上下中空玻璃1之间的缝隙中,密封橡胶条42嵌入压板43内侧设置的凹槽内。将已嵌入密封橡胶条42的压板43压紧隔热垫块41,然后用紧固件44将隔热垫块41和压板43固定在横梁22上。再将装饰线条45卡扣在压板43的卡口上,完成了整个横向装饰框4的组装。 The heat insulation block 41 is embedded in the gap between the upper and lower insulating glass 1 , and the sealing rubber strip 42 is embedded in the groove provided on the inner side of the pressing plate 43 . The pressure plate 43 embedded in the sealing rubber strip 42 is pressed against the heat insulation pad 41 , and then the heat insulation pad 41 and the pressure plate 43 are fixed on the beam 22 with fasteners 44 . Then, the decorative line 45 is fastened on the bayonet of the pressing plate 43 to complete the assembly of the entire horizontal decorative frame 4 .
上述实施例仅用于解释说明本发明的发明构思,而非对本发明权利保护的限定,凡利用此构思对本发明进行非实质性的改动,均应落入本发明的保护范围。 The above-mentioned embodiments are only used to explain the inventive concept of the present invention, but not to limit the protection of the rights of the present invention. Any insubstantial changes made to the present invention by using this concept should fall within the scope of protection of the present invention.
Claims (9)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310096942.XA CN103174244B (en) | 2012-08-06 | 2012-08-06 | Curtain wall connecting node |
| CN201210276978.1A CN102776971B (en) | 2012-08-06 | 2012-08-06 | Curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210276978.1A CN102776971B (en) | 2012-08-06 | 2012-08-06 | Curtain wall |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310096942.XA Division CN103174244B (en) | 2012-08-06 | 2012-08-06 | Curtain wall connecting node |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102776971A CN102776971A (en) | 2012-11-14 |
| CN102776971B true CN102776971B (en) | 2014-10-29 |
Family
ID=47122067
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210276978.1A Expired - Fee Related CN102776971B (en) | 2012-08-06 | 2012-08-06 | Curtain wall |
| CN201310096942.XA Expired - Fee Related CN103174244B (en) | 2012-08-06 | 2012-08-06 | Curtain wall connecting node |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310096942.XA Expired - Fee Related CN103174244B (en) | 2012-08-06 | 2012-08-06 | Curtain wall connecting node |
Country Status (1)
| Country | Link |
|---|---|
| CN (2) | CN102776971B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102995798A (en) * | 2012-11-30 | 2013-03-27 | 上海玻机智能幕墙股份有限公司 | Safety hook system with integral structure of hidden framing glass curtain wall |
| CN103437471A (en) * | 2013-09-04 | 2013-12-11 | 苏州长玖节能科技服务有限公司 | Double-layer vacuum glass plate curtain wall fixing structure |
| CN104164930B (en) * | 2014-09-03 | 2017-02-15 | 苏州承志装饰有限公司 | Curtain wall connecting structure and mounting and dismounting method |
| CN106677391B (en) * | 2016-12-29 | 2019-01-18 | 安徽科蓝特铝业有限公司 | A kind of compound complete hidden frame heat-insulating curtain wall |
| CN109162388A (en) * | 2018-10-25 | 2019-01-08 | 宁波建工建乐工程有限公司 | Curtain wall cross beam column sliding pin type connects system |
| CN110094147A (en) * | 2019-05-31 | 2019-08-06 | 浙江建设职业技术学院 | A kind of single-curved surface imitates modular curtain wall door and window structure |
| CN113802733A (en) * | 2021-03-05 | 2021-12-17 | 赣州海发中空玻璃工程有限公司 | Assembled toughened glass curtain wall |
| CN114351910A (en) * | 2021-12-24 | 2022-04-15 | 广东鑫铭格节能科技有限公司 | Curtain wall for ultralow-energy-consumption building and construction method |
| CN116220258B (en) * | 2023-03-09 | 2023-10-27 | 中建八局第一建设有限公司 | Vertical-bright horizontal-hidden hyperboloid glass plate system |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2176217B (en) * | 1985-03-30 | 1988-10-05 | James Alan Macey | Curtain walls |
| CN1952280A (en) * | 2006-11-10 | 2007-04-25 | 浙江中南建设集团有限公司 | Hollow glass curtain wall with invisible frame and hollow glass plate for use in curtain wall |
| CN201151960Y (en) * | 2008-01-22 | 2008-11-19 | 宁波建工集团有限公司 | Glass curtain wall crossbeam and column connection structure |
| CN201620500U (en) * | 2010-03-31 | 2010-11-03 | 北京江河幕墙股份有限公司 | Framed built-in hidden frame curtain wall glass structure |
| CN101929211A (en) * | 2010-08-23 | 2010-12-29 | 浙江亚厦幕墙有限公司 | Connecting structure for upright posts and cross beams of glass curtain wall |
| CN201687108U (en) * | 2009-12-31 | 2010-12-29 | 深圳市方大装饰工程有限公司 | Exposed frame curtain wall adapter and exposed frame curtain wall connection structure |
| CN202073219U (en) * | 2011-03-23 | 2011-12-14 | 南京金中建幕墙装饰有限公司 | Component type curtain wall general for exposed, hidden frames |
| CN202755497U (en) * | 2012-08-06 | 2013-02-27 | 浙江宝业幕墙装饰有限公司 | Curtain wall |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH584339A5 (en) * | 1974-02-05 | 1977-01-31 | Alusuisse | |
| DE3714629C2 (en) * | 1987-05-02 | 1997-08-21 | Johann Henkenjohann | Facade wall of a building |
| CN2367735Y (en) * | 1999-04-28 | 2000-03-08 | 谢增厚 | Aluminium alloy curtain wall |
| CN2658254Y (en) * | 2003-06-30 | 2004-11-24 | 珠海市晶艺玻璃工程有限公司 | Device for fastening curtain wall and roof glass |
| CN201169850Y (en) * | 2007-12-30 | 2008-12-24 | 浙江中南建设集团有限公司 | Hollow glass curtain wall, hollow glass plate block and accessory frame section bar of hollow glass plate block |
| CN201339261Y (en) * | 2008-12-25 | 2009-11-04 | 金螳螂建筑装饰股份有限公司 | Hidden frame curtain wall |
| CN202039486U (en) * | 2011-03-31 | 2011-11-16 | 上海瑞那斯幕墙装饰有限公司 | Photovoltaic glass curtain wall column, auxiliary frame, batten and glass curtain wall structure |
-
2012
- 2012-08-06 CN CN201210276978.1A patent/CN102776971B/en not_active Expired - Fee Related
- 2012-08-06 CN CN201310096942.XA patent/CN103174244B/en not_active Expired - Fee Related
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2176217B (en) * | 1985-03-30 | 1988-10-05 | James Alan Macey | Curtain walls |
| CN1952280A (en) * | 2006-11-10 | 2007-04-25 | 浙江中南建设集团有限公司 | Hollow glass curtain wall with invisible frame and hollow glass plate for use in curtain wall |
| CN201151960Y (en) * | 2008-01-22 | 2008-11-19 | 宁波建工集团有限公司 | Glass curtain wall crossbeam and column connection structure |
| CN201687108U (en) * | 2009-12-31 | 2010-12-29 | 深圳市方大装饰工程有限公司 | Exposed frame curtain wall adapter and exposed frame curtain wall connection structure |
| CN201620500U (en) * | 2010-03-31 | 2010-11-03 | 北京江河幕墙股份有限公司 | Framed built-in hidden frame curtain wall glass structure |
| CN101929211A (en) * | 2010-08-23 | 2010-12-29 | 浙江亚厦幕墙有限公司 | Connecting structure for upright posts and cross beams of glass curtain wall |
| CN202073219U (en) * | 2011-03-23 | 2011-12-14 | 南京金中建幕墙装饰有限公司 | Component type curtain wall general for exposed, hidden frames |
| CN202755497U (en) * | 2012-08-06 | 2013-02-27 | 浙江宝业幕墙装饰有限公司 | Curtain wall |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102776971A (en) | 2012-11-14 |
| CN103174244A (en) | 2013-06-26 |
| CN103174244B (en) | 2015-07-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102776971B (en) | Curtain wall | |
| CN106014131B (en) | A kind of aluminum alloy doorframe, door-plate and its application method using the aluminum alloy doorframe | |
| CN202755497U (en) | Curtain wall | |
| CN205012519U (en) | Horizontal moulding braced system of curtain | |
| CN103255863B (en) | Curtain wall | |
| CN209958579U (en) | A prefabricated curtain wall installation structure | |
| CN101963026B (en) | Combined door frame | |
| CN204739752U (en) | Broken cold bridge box structure | |
| CN208633740U (en) | A kind of ornamental strip core plate modularization sliding door package assembly | |
| CN220655093U (en) | Fast-assembling type aluminum cabinet | |
| CN202596126U (en) | Installation structure of exposed frame decorative strips of building curtain wall | |
| CN102864856A (en) | Improved visibility-and-concealment-combined multifunctional curtain wall system | |
| CN214461601U (en) | Glass curtain wall beam structure and glass curtain wall | |
| CN207048237U (en) | A kind of assembled panel structure | |
| CN201447787U (en) | Connecting piece for corner of wallboards of integral toilet and bathroom | |
| CN201507102U (en) | Aluminium alloy section bar subassembly | |
| CN203531181U (en) | Unit combined type decoration wall | |
| CN210459881U (en) | Aluminum alloy decorative line system | |
| CN217379423U (en) | Hidden frame glass curtain wall structure with decorative grille | |
| CN206971635U (en) | A kind of dismantled and assembled connecting elements of decoration panel | |
| CN205480569U (en) | Decorative lighting integrated configuration of outdoor building curtain | |
| CN215926425U (en) | Hidden frame glass curtain wall connecting structure | |
| CN220469186U (en) | Integrated partition wall | |
| CN223482184U (en) | Dry hanging structure for building decoration wallboard | |
| CN214614817U (en) | Profile curtain wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C53 | Correction of patent of invention or patent application | ||
| CB02 | Change of applicant information |
Address after: 312030 Zhejiang city of Shaoxing province Shaoxing County Shanyin Road No. 567 Keqiao Baoye Industrial Park Applicant after: Zhejiang Baoye Curtain Wall Decoration Co., Ltd. Address before: 312000 Zhejiang city of Shaoxing province Keqiao Shanyin Road No. 567 Po industry Industrial Park Applicant before: Zhejiang Baoye Curtain Wall Decoration Co., Ltd. |
|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141029 Termination date: 20190806 |