AU2001225335A1 - Subsea completion annulus monitoring and bleed down system - Google Patents
Subsea completion annulus monitoring and bleed down systemInfo
- Publication number
- AU2001225335A1 AU2001225335A1 AU2001225335A AU2533501A AU2001225335A1 AU 2001225335 A1 AU2001225335 A1 AU 2001225335A1 AU 2001225335 A AU2001225335 A AU 2001225335A AU 2533501 A AU2533501 A AU 2533501A AU 2001225335 A1 AU2001225335 A1 AU 2001225335A1
- Authority
- AU
- Australia
- Prior art keywords
- down system
- bleed down
- subsea completion
- annulus monitoring
- completion annulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000012544 monitoring process Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0353—Horizontal or spool trees, i.e. without production valves in the vertical main bore
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0000876A GB2358204B (en) | 2000-01-14 | 2000-01-14 | Subsea completion annulus monitoring and bleed down system |
| GB0000876 | 2000-01-14 | ||
| PCT/GB2001/000102 WO2001051758A2 (en) | 2000-01-14 | 2001-01-11 | Subsea completion annulus monitoring and bleed down system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AU2001225335A1 true AU2001225335A1 (en) | 2001-07-24 |
Family
ID=9883717
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2001225335A Abandoned AU2001225335A1 (en) | 2000-01-14 | 2001-01-11 | Subsea completion annulus monitoring and bleed down system |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US6817418B2 (en) |
| EP (1) | EP1247000A2 (en) |
| AU (1) | AU2001225335A1 (en) |
| BR (1) | BR0107782A (en) |
| GB (1) | GB2358204B (en) |
| NO (1) | NO20023394L (en) |
| WO (1) | WO2001051758A2 (en) |
| ZA (1) | ZA200206234B (en) |
Families Citing this family (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6640902B2 (en) | 2001-04-17 | 2003-11-04 | Fmc Technologies, Inc. | Nested stack-down casing hanger system for subsea wellheads |
| GB2376485B (en) * | 2001-06-14 | 2003-08-27 | Kvaerner Oilfield Products Ltd | Annulus monitoring bleed |
| GB2408280B (en) * | 2002-09-12 | 2007-03-07 | Dril Quip Inc | A system for well workover |
| GB2398309B (en) * | 2003-02-14 | 2004-12-29 | Fmc Technologies | Subsea wellhead with sliding sleeve |
| US7565931B2 (en) * | 2004-11-22 | 2009-07-28 | Energy Equipment Corporation | Dual bore well jumper |
| US20070053629A1 (en) * | 2005-09-02 | 2007-03-08 | Schlumberger Technology Corporation | Providing a Subsea Optical Junction Assembly for Coupling Fiber Optic Cables |
| US7441599B2 (en) * | 2005-11-18 | 2008-10-28 | Chevron U.S.A. Inc. | Controlling the pressure within an annular volume of a wellbore |
| US20070114034A1 (en) * | 2005-11-18 | 2007-05-24 | Chevron U.S.A. Inc. | Controlling pressure and static charge build up within an annular volume of a wellbore |
| GB2465898B (en) | 2007-07-25 | 2012-06-27 | Cameron Int Corp | System and method to seal multiple control lines |
| GB2457888C (en) * | 2008-02-26 | 2013-08-21 | Zetechtics Ltd | Subsea test apparatus, assembly and method |
| US7967066B2 (en) * | 2008-05-09 | 2011-06-28 | Fmc Technologies, Inc. | Method and apparatus for Christmas tree condition monitoring |
| US7845404B2 (en) | 2008-09-04 | 2010-12-07 | Fmc Technologies, Inc. | Optical sensing system for wellhead equipment |
| US9359853B2 (en) * | 2009-01-15 | 2016-06-07 | Weatherford Technology Holdings, Llc | Acoustically controlled subsea latching and sealing system and method for an oilfield device |
| US8955595B2 (en) * | 2009-11-18 | 2015-02-17 | Chevron U.S.A. Inc. | Apparatus and method for providing a controllable supply of fluid to subsea well equipment |
| GB2479552B (en) * | 2010-04-14 | 2015-07-08 | Aker Subsea Ltd | Subsea wellhead providing controlled access to a casing annulus |
| US8746345B2 (en) * | 2010-12-09 | 2014-06-10 | Cameron International Corporation | BOP stack with a universal intervention interface |
| ITMI20111112A1 (en) * | 2011-06-20 | 2012-12-21 | Eni Spa | PLANT FOR THE EXPLOITATION OF FIELDS OF NATURAL FLUIDS, SUCH AS PETROLEUM, NATURAL GAS OR OTHER EXTRACTED FLUIDS BASED ON HYDROCARBONS |
| CN102278061A (en) * | 2011-07-07 | 2011-12-14 | 江苏谷登工程机械装备有限公司 | Hydraulic system for horizontal directional drilling machine power transmission device |
| CA2843127C (en) * | 2011-08-12 | 2016-10-11 | Landmark Graphics Corporation | Systems and methods for the evaluation of passive pressure containment barriers |
| US9188499B2 (en) * | 2011-10-04 | 2015-11-17 | Onesubsea Ip Uk Limited | Subsea retrievable pressure sensor |
| WO2014161070A1 (en) * | 2013-04-05 | 2014-10-09 | Car-Ber Investments Inc. | Apparatus and method for isolating a section of a pipe riser bore in the course of riser renewal |
| GB2558267B (en) | 2016-12-23 | 2021-09-15 | Equinor Energy As | Subsea wellhead monitoring and controlling |
| NO20170180A1 (en) | 2017-02-06 | 2018-08-07 | New Subsea Tech As | An apparatus for performing at least one operation to construct a well subsea, and a method for constructing a well |
| US20180313187A1 (en) * | 2017-05-01 | 2018-11-01 | Schlumberger Technology Corporation | Single body choke line and kill line valves |
| GB201715585D0 (en) | 2017-09-26 | 2017-11-08 | Metrol Tech Ltd | A well in a geological structure |
| NO345669B1 (en) * | 2019-07-03 | 2021-06-07 | Petroleum Technology Co As | A valve arrangement |
| US11970933B2 (en) * | 2021-12-15 | 2024-04-30 | Helmerich & Payne Technologies, Llc | Transducer assembly for oil and gas wells |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4116044A (en) * | 1977-04-28 | 1978-09-26 | Fmc Corporation | Packoff leak detector |
| US4210208A (en) * | 1978-12-04 | 1980-07-01 | Sedco, Inc. | Subsea choke and riser pressure equalization system |
| US4519263A (en) * | 1979-07-21 | 1985-05-28 | Fmc Corporation | Matrix switching control of subsea production systems |
| US4887672A (en) * | 1988-12-16 | 1989-12-19 | Cameron Iron Works Usa, Inc. | Subsea wellhead with annulus communicating system |
| US5366017A (en) * | 1993-09-17 | 1994-11-22 | Abb Vetco Gray Inc. | Intermediate casing annulus monitor |
| GB9514510D0 (en) * | 1995-07-15 | 1995-09-13 | Expro North Sea Ltd | Lightweight intervention system |
| US6050339A (en) * | 1996-12-06 | 2000-04-18 | Abb Vetco Gray Inc. | Annulus porting of horizontal tree |
| GB2326430B (en) * | 1997-06-17 | 2001-07-11 | Plexus Ocean Syst Ltd | Wellhead |
| AU9791898A (en) * | 1997-10-07 | 1999-04-27 | Fmc Corporation | Slimbore subsea completion system and method |
| WO1999031426A1 (en) * | 1997-12-15 | 1999-06-24 | Hellesoe Bernt H | Remotely operable underwater connector assembly and method |
| EP1255912B1 (en) * | 2000-02-02 | 2006-06-07 | FMC Technologies, Inc. | Non-intrusive pressure measurement device for subsea well casing annuli |
-
2000
- 2000-01-14 GB GB0000876A patent/GB2358204B/en not_active Expired - Fee Related
-
2001
- 2001-01-11 EP EP01900508A patent/EP1247000A2/en not_active Withdrawn
- 2001-01-11 BR BR0107782-1A patent/BR0107782A/en not_active IP Right Cessation
- 2001-01-11 WO PCT/GB2001/000102 patent/WO2001051758A2/en not_active Ceased
- 2001-01-11 AU AU2001225335A patent/AU2001225335A1/en not_active Abandoned
- 2001-01-11 US US10/169,809 patent/US6817418B2/en not_active Expired - Fee Related
-
2002
- 2002-07-12 NO NO20023394A patent/NO20023394L/en not_active Application Discontinuation
- 2002-08-05 ZA ZA200206234A patent/ZA200206234B/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| US20030145999A1 (en) | 2003-08-07 |
| ZA200206234B (en) | 2003-12-03 |
| WO2001051758A3 (en) | 2001-12-06 |
| EP1247000A2 (en) | 2002-10-09 |
| WO2001051758A2 (en) | 2001-07-19 |
| BR0107782A (en) | 2002-12-03 |
| GB0000876D0 (en) | 2000-03-08 |
| US6817418B2 (en) | 2004-11-16 |
| NO20023394D0 (en) | 2002-07-12 |
| GB2358204A (en) | 2001-07-18 |
| NO20023394L (en) | 2002-09-10 |
| GB2358204B (en) | 2002-09-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2001225335A1 (en) | Subsea completion annulus monitoring and bleed down system | |
| AU2001291125A1 (en) | Well drilling method and system | |
| AU2001253825A1 (en) | System and method for remotely monitoring functional activities | |
| AU2003284012A1 (en) | Systems and methods for securitizing a commodity | |
| AU2001263887A1 (en) | Monitoring method | |
| AU2001277895A1 (en) | System and method for communicating information associated with a drilling component | |
| AU2003237996A1 (en) | Manufacturing information and troubleshooting system and method | |
| AU2003280405A1 (en) | Employment salary information system and method | |
| AU2002232579A1 (en) | Wellbore fluid recovery system and method | |
| AU5613800A (en) | Well packer and method | |
| AU2003244825A1 (en) | Subsea and landing string distributed temperature sensor system | |
| AUPR558501A0 (en) | System and method for monitoring and displaying athlete char acteristics | |
| AU2002216714A1 (en) | Wellhead assembly for accessing an annulus in a well and a method for its use | |
| AU2003234483A1 (en) | Coupling assembly and method | |
| GB2395736B (en) | Annulus monitoring system | |
| AU2001258647A1 (en) | Subsea pipeline touchdown monitoring | |
| AU2001246492A1 (en) | Combined logging and drilling system | |
| AU2003290305A1 (en) | System and method for rig state detection | |
| AU2001230408A1 (en) | Packer system | |
| AU2001292710A1 (en) | Well packer and method | |
| AU2001251601A1 (en) | Human-natural string compare for filesystems | |
| GB2376485B (en) | Annulus monitoring bleed | |
| AU2003262958A1 (en) | Poly-operative remote sensing system and method | |
| AU2001271813A1 (en) | System and method for remotely monitoring | |
| AU2003206484A1 (en) | Data visualisation system and method |