Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah dengan Metode CPM (Studi Kasus: Pembangunan Rumah Tinggal di Perumnas Kabupaten Karawang) Sigit, Radyta Alicia Pramestia; Al-Muqaffa, Figar Wafiq; Sutrisno, Sutrisno
Go-Integratif : Jurnal Teknik Sistem dan Industri Vol. 4 No. 02 (2023): Go-Integratif : Jurnal Teknik Sistem dan Industri
Publisher : Engineering Faculty at Universitas Singaperbangsa Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35261/gijtsi.v4i02.10876

Abstract

Project scheduling can help to show the relationship between the activities carried out by the project. This scheduling also functions to prioritize the travel process of a previous activity before the next activity is carried out. One scheduling method that can be used is CPM (Critical Path Method). This research aims to evaluate house construction projects in Perumnas Karawang Regency. In this research, the data taken is primary data and secondary data. Primary data was obtained directly from interviews between homeowners and researchers. The results of this research discussion showed that the critical path results were A-B-C-D-G-H-I-J-K with details of activities: preparing materials, installing foundations, assembling and installing metal slup, installing hebel, plastering walls, plastering walls, painting walls, installing ceilings and installing ceramics. Scheduling house construction projects in Perumnas Karawang Regency using the CPM method can be completed within 60 days.
Analisis Postur Kerja Menggunakan Metode REBA dan Kuesioner NBM Pada Operator Mesin Sizing SA-80 N1 di Industri Otomotif Yohanes, Ricky; Al-Muqaffa, Figar Wafiq; Kusnadi, Kusnadi
Industrika : Jurnal Ilmiah Teknik Industri Vol. 9 No. 1 (2025): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v9i1.1557

Abstract

This research was conducted at a company engaged in automotive manufacturing which produces motorbikes and related spare parts. Based on the results of observations on the production process, especially the sizing process, it is still done manually and has the potential for musculoskeletal disorders. This research is an observational study with a cross-sectional design that focuses on Ergonomics and OSH (Occupational Health and Safety) studies. Data obtained by using the Nordic Body Map (NBW) questionnaire as a tool to measure workers' pain at or after work and using the Rapid Entire Body Assessment (REBA) method to analyze work posture. After completing the NBW questionnaire on 4 sizing machine operators, 1 operator with the highest total individual score of 46 was included in the low category and was then selected to calculate work posture using the REBA method. Based on the results of calculating work posture using the REBA method, the final REBA score is 8. This score indicates (action level) 4 with high-risk conditions and further investigation is needed to prevent Musculoskeletal Disorders (MSDs) in operators Keywords: Ergonomics, MSDs, NBM, REBA, Work Posture.
Analisis Beban Kerja dengan Metode Work Load Analysis pada Departemen Produksi di PT. X Al-Muqaffa, Figar Wafiq; Yohanes, Ricky; Winarsih, Neneng
Industrika : Jurnal Ilmiah Teknik Industri Vol. 9 No. 1 (2025): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/indstrk.v9i1.1558

Abstract

Determination of the workload given by the company to employees must be considered. The workload analysis method is used to calculate the workload of a particular function within the company. This research was conducted at PT. X is engaged in special chemicals for various industries, ranging from paper, rubber, food, agriculture, oil mining, cosmetics and other industries. Therefore it is necessary to analyze the workload of employees in the production department because it is directly related to production activities carried out while working. The results of the identification of workload analysis based on the job description along with the hoursworked by employees and the determination of allowances (free time) show that production department employees have workloads, namely the production admin section with 1 employee by 79%, production foreman with 1 employee by 89%, and production operators with 1 employee by 82%, this shows that the workload provided is still in a safe condition. Keywords: Allowance, Ergonomics, Work Load Analysis