Claim Missing Document
Check
Articles

Found 6 Documents
Search

PENERAPAN KONSTRUKSI HIJAU PADA PROYEK APARTEMEN X DI JAKARTA PUSAT Adistianti, Narisa; Sucita, I Ketut
Construction and Material Journal Vol 2, No 2 (2020): CONSTRUCTION AND MATERIAL JOURNAL VOL. 2 NO. 2 JULI 2020
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACTAlong with the Jakarta Governor rules no. 38/2012 about green building, The Contractors in the capital has been practicing to implement green construction in building construction. This is done by a contractor state-owned or private contractor. The purpose of this research is analyzing the application of green construction by state owned contractors who is not a member of green building council Indonesia. Collecting data which used in this research was questionnaire, observation, and documentation. The reference of indicators are from regulations, rating tools GBCI and models assessment green construction developed by Wulfram Ervianto. The Indicators are health program and occupational safety, environmental health work, air quality construction phase, election and operational construction phase, planning and scheduling construction equipment, documentation construction project, building & enviroment management, training for subcontractor, waste management, the source and cycle construction, material storage and protection, appropriate site development, reduction ecological footprint the project, protection plan, water conservation, and efficiency & energy conservation. The method of analysis data questionnare are descriptive analysis. The result of research is average value of the implementation of green construction by 85,08 % which means that green construction points of the indicators as a whole has taken and implemented by contractor.Keywords: green construction; construction phase; GBCIABSTRAKSeiring dengan diberlakukannya Peraturan Gubernur DKI Jakarta No. 38 Tahun 2012 mengenai Bangunan Gedung Hijau, kontraktor-kontraktor di Ibukota mulai menerapkan konstruksi hijau dalam proses pembangunan gedung. Hal itu dilakukan oleh kontraktor milik negara ataupun kontraktor milik swasta. Tujuan penelitian ini adalah menganalisis penerapan konstruksi hijau oleh kontraktor milik Negara yang bukan anggota Green Building Council Indonesia. Pengumpulan data yang digunakan dalam penelitian ini adalah kuisioner, observasi dan dokumentasi. Acuan indikator konstruksi hijau dari peraturan perundangan- undangan, rating tools GBCI dan model assessment green construction yang dikembangkan oleh Ervianto. Indikator tersebut antara lain program kesehatan dan keselamatan kerja, kesehatan lingkungan kerja tahap konstruksi, kualitas udara tahap konstruksi ,pemilihan dan operasional peralatan konstruksi, perencanaan dan penjadwalan, dokumentasi, ,manajemen lingkungan proyek konstruksi, pelatihan bagi subkontraktor, manajemen limbah konstruksi, sumber dan siklus material, penyimpanan dan perlindungan material, tepat guna lahan, pengurangan jejak ekologis, rencana perlindungan lokasi pekerjaan, konservasi air, dan efisiensi dan konservasi energi. Metode analisis data kuisioner ialah dengan analisa deskriptif. Hasil dari penelitian didapatkan nilai rata-rata penerapan green construction sebesar 85,08% yang artinya bahwa poin poin dari indikator konstruksi hijau secara keseluruhan telah diperhatikan dan diimplementasikan oleh kontraktor.Kata Kunci: konstruksi hijau; fase konstruksi; GBCI
BOND STRENGTH OF BAR USING GROUTING FOR PRECAST CONCRETE CONNECTION Rosyidah, Anis; Sucita, I Ketut; Sukarno, Praganif; Sari, S. R. Permita; Sari, Chintya
Applied Research on Civil Engineering and Environment (ARCEE) Vol 1, No 01 (2019): Civil and Environment Development
Publisher : POLITEKNIK NEGERI JAKARTA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32722/arcee.v1i01.2311

Abstract

In precast concrete, a connection is needed to unite the components so that they become a whole unified structure. This study aims to determine the reinforcement strength and length of reinforcement in precast concrete connections. To paste reinforcement into precast concrete, giving additional material in the form of grouting which is called sika grout 215 and functions as an adhesive is necessary. Pullout testing is carried out in the laboratory, and its simulation by modeling uses the finite element method based software. This research is divided into 2 phases. The first phase is making specimen to examine the bond strength between the concrete and reinforcement that has been given sika grout 215. So monolithic specimen is made as a comparison. The result of the bond strength of the monolithic test specimen is 6.24 MPa, and the sika grout 215 category is 6.52 MPa. From the experimental results in the laboratory with modeling, it is obtained the bond strength ratio of 0.94. The length of development (ld) based on the results of the testing phase I of 200 mm. The second phase is examining the damage pattern due to the stress that occurred. Specimens are made into 4 categories, namely modeling developments with the length of 120 mm (<40% ld), with the length of 160 mm (<20% ld), with length of 200 mm (= ld), and with the length of 260 mm(> 30% ld) both for monoliths and sika grout 215. The damage pattern, which is in the form of yielding and breaking reinforcement as the result of the pullout experiment in the laboratory shows not much different from the result of simulation using the software.
Pembudidayaan Maggot untuk Olah Sampah Rumah di Desa Pasir Angin Kecamatan Mega Mendung, Bogor Oktivasari, Prihatin; Sucita, I ketut; Kurniawan, Asep; Rosyidah, Anis
Presisi Jurnal Pengabdian Masyarakat Vol. 3 No. 1 (2024): 2024
Publisher : PT. Lancar Media Komunikasi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The potential for waste in West Java is very large. The average amount of waste production in 27 districts/cities of West Java in 2023 will be 2200 tons per day. The largest waste composition based on type of waste is food waste, and the largest waste composition based on source is household waste. Therefore, household waste processing is increasingly being encouraged in Bogor Regency through community empowerment. Household waste can be managed using maggots. Maggot cultivation training by resource persons was carried out offline and was attended by 20 participants consisting of residents and village stakeholders. Maggot cultivation being developed is dry maggots, live maggots and maggot eggs. The PNJ Lecturer Team, which collaborates between ICT KBK IoT-network and KBK Civil Engineering construction management, is making efforts to develop knowledge of waste management by providing facilities to manage household waste using Maggot cultivation.
Investigation of seismic resistant structures with various moment-resisting frame systems and pushover analysis Putra, Oky Bima; Ramadhan, Ilham Dwiputra; Rosyidah, Anis; Saputra, Jonathan; Sucita, I Ketut
SINERGI Vol 28, No 3 (2024)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/sinergi.2024.3.010

Abstract

Earthquakes are a serious threat in the construction of multi-storey buildings in Indonesia, which are divided into several seismic design categories. The design of seismic-resistant buildings requires the management of plastic hinges to reduce seismic loads. The aspects of seismic-resistant structural design in Indonesia are regulated by SNI 1726:2019, SNI 1727:2020, and SNI 2847:2019. Intermediate Moment Resisting Frame System (IMRFS) and Special Moment Resisting Frame System (SMRFS) are used based on seismic category and earthquake intensity. Pushover analysis is used to analyze the structures behavior when exposed to seismic loads. This research designs seismic resistant structures with IMRFS and SMRFS at different locations with the aim of assessing structural performance and gaining reinforcement to the concrete ratio, which is relevant for the design and construction of multi-storey buildings in Indonesia. The results of this research are the structural performance levels, reinforcement volume, concrete volume, and the reinforcement to concrete volume ratio. Both IMRFS and SMRFS reached Immediate Occupancy to Life Safe performance levels after the earthquake because their monitored displacement was not significantly different. The structural failure modes of both systems meet the Strong Column–Weak Beam requirements. The distribution of plastic hinges also remains in the Immediate Occupancy category. 
Anomaly Response Spectrum of Various Cities in Indonesia Based on SNI 1726:2019 Rosyidah, Anis; Albab, Ulil; Rinawati; Sucita, I Ketut; Latha M. S
Recent in Engineering Science and Technology Vol. 1 No. 03 (2023): RiESTech Volume 01 No. 03 Years 2023
Publisher : MBI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59511/riestech.v1i03.25

Abstract

Response spectra that happened anomaly is seen after SNI 1726:2012 dan SNI 1726:2019 published, this condition has happened because the value of response spectrum design is SE < SD < SC, SD < SE < SC, or SD < SC < SE, if this in normal condition, the value of response spectrum is SC < SD < SE. With applied methods and procedures found by Kircher & Associates (2015) they adjust the formula SMS & SM1 wished response spectrum becomes normal. In this research, comparing spectrum response, with spectrum response with treatment, and comparing the value SDS dan SD1. From this research, it was found that there was a decrease in seismic loading on hard soil (SC) and an increase in medium soil (SD) and soft soil (SE).
Analisis Produktivitas Tenaga Kerja Terhadap Pekerjaan Keramik Pada Pandemi Covid-19 Safri; Putri, Azzahra Nursantyendo; Sucita, I Ketut
KERN : Jurnal Ilmiah Teknik Sipil Vol. 8 No. 1: April 2022
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Pembangunan Nasional "Veteran" Jawa Timur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33005/kern.v8i1.55

Abstract

Pekerjaan keramik adalah salah satu pekerjaan finishing dalam proyek konstruksi. Dalam masa pandemi Covid-19, proyek konstruksi di Indonesia mengalami dampak berupa perlambatan pekerjaan bahkan hingga penghentian sementara pekerjaan termasuk pekerjaan keramik. Walaupun pekerjaan keramik merupakan pekerjaan indoor, tapi Covid-19 berpengaruh dalam produktivitas tenaga kerja yang menjadi bagian dari keterlambatan proyek konstruksi. Dalam proyek konstruksi, produktivitas tenaga kerja akan berdampak pada kesesuaian antara jadwal pelaksanaan yang sudah direncanakan dengan progres pekerjaan aktual di lapangan. Produktivitas tenaga kerja yang kurang pengawasan dapat menghambat pekerjaan. Produktivitas dari tenaga kerja dapat dipengaruhi oleh beberapa faktor, seperti faktor sumber daya manusia, cuaca, metode kerja, manajerial, dan protokol kesehatan covid-19. Hanya sedikit artikel yang membahas tentang pengaruh Covid-19 terhadap pekerjaan produktivitas tenaga kerja pekerjaan finishing khususnya pekerjaan keramik. Tujuan dari penelitian ini adalah untuk mengetahui tingkat produktivitas tenaga kerja pekerjaan keramik pada masa pandemi Covid-19 beserta mencari tahu perbandingan pengaruh dari faktor-faktor yang mempengaruhinya. Penelitian ini menggunakan metode Work Sampling untuk mengukur tingkat produktivitas tenaga kerja sebab tidak perlu dilakukan pengamatan terus-menerus, tidak membutuhkan biaya besar, dan tidak memberi banyak gangguan terhadap pekerja. Penelitian dilakukan dengan melakukan pengamatan pekerjaan secara langsung di lapangan, penyebaran kuesioner, serta wawancara. Hasil penelitian menunjukkan produktivitas tenaga kerja pekerjaan keramik di masa pandemi memiliki LUR rata-rata 70,65% dengan faktor yang paling berpengaruh adalah faktor sumber daya manusia. Hal ini ditunjukkan oleh nilai rata-rata yang didapatkan pada variabel sumber daya manusia yaitu sebesar 24,85. Terdapat perbedaan rata-rata yang signifikan di antara faktor sumber daya manusia dengan faktor lainnya, ditunjukkan oleh nilai signifikansi yang didapatkan dari uji hipotesis bernilai kurang dari 0,05.