Evaluation of Historical Building Economic Value To Improve Company Revenue With Value Engineering Method Suwandari, Yunita Dian; Mirnayani, Mirnayani
Jurnal Teknik Sipil dan Perencanaan Vol 23, No 1 (2021): Jurnal Teknik Sipil dan Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v23i1.25944

Abstract

Abstract: Historical buildings have high historical, cultural, and architectural values. This research aims to provide an overview of the economic benefits for building owners when utilizing the building. Case studies, the qualitative methods and Value Engineering were used in this research. This study identified three building functions to add economic value and are feasible in terms of investment value. The buildings are a budget hotel, restaurant/cafeteria, and co – working space. IRR value for budget hotels is 14.29%; the NPV value is IDR 58,375,939,253; 14 years payback; the distribution of the financing scheme 30% landowners and 70% investors; 30-year concession. Restaurant / café and co – working space; the value of IRR is 12.47%; the value of NPV is IDR 4,727,841,299.58; Payback 8 years. This research is useful for historic building owners, government, and academics to utilize their assets to have economic value.  
Evaluation of Historical Building Economic Value To Improve Company Revenue With Value Engineering Method Suwandari, Yunita Dian; Mirnayani, Mirnayani
Jurnal Teknik Sipil dan Perencanaan Vol 23, No 1 (2021)
Publisher : Universitas Negeri Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v23i1.25944

Abstract

Abstract: Historical buildings have high historical, cultural, and architectural values. This research aims to provide an overview of the economic benefits for building owners when utilizing the building. Case studies, the qualitative methods and Value Engineering were used in this research. This study identified three building functions to add economic value and are feasible in terms of investment value. The buildings are a budget hotel, restaurant/cafeteria, and co – working space. IRR value for budget hotels is 14.29%; the NPV value is IDR 58,375,939,253; 14 years payback; the distribution of the financing scheme 30% landowners and 70% investors; 30-year concession. Restaurant / café and co – working space; the value of IRR is 12.47%; the value of NPV is IDR 4,727,841,299.58; Payback 8 years. This research is useful for historic building owners, government, and academics to utilize their assets to have economic value.  
Analisa Aspek Kualitatif Pemilihan Kontraktor Untuk Pekerjaan Renovasi/Perbaikan Gedung Bersejarah Yunita Dian Suwandari; Mirnayani Mirnayani
Rekayasa Sipil Vol 10, No 2 (2021)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/jrs.2021.v10.i2.01

Abstract

Pemilihan kontraktor yang tepat menjadi salah satu penentu keberhasilan proyek kontruksi gedung baik gedung modern maupun gedung bersejarah.. Tujuan dari penelitian ini adalah untuk menganalisa kriteria pemilihan kontraktor gedung bersejarah dan kriteria dominan yang menjadi pertimbangan para pemilik gedung. Metode yang digunakan adalah kualitatif. Hasil penelitian ini terdapat 13 kriteria pemilihan kontraktor untuk pekerjaan perbaikan gedung bersejarah dan terdapat 3 variabel yang dominan.  Penelitian ini bermanfaat bagi pemilik Gedung bersejarah, pemerintah dan kalangan
Analisis Faktor-faktor Perubahan Design Terhadap Proyek Konstruksi Pelebaran Jalan Tol Jakarta-Merak (Area Cikupa) Yunita Dian Suwandari; Oties T. Tsarwan
Engineering, MAthematics and Computer Science (EMACS) Journal Vol. 2 No. 3 (2020): EMACS
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/emacsjournal.v2i3.6561

Abstract

In every project, job changes are always happening and almost unavoidable. One of the factors that influence job change is a design change. This study analyzes the design changes that have caused delays in the Jakarta-Merak toll road widening project in the Cikupa area—collecting data using literature studies and questionnaires with five Linkert scales. The analysis used SPSS version 22. The research finding is five variables of design changes and changes due to the land’s location to be used as a project, which are the leading causes of changes in this project’s design.
Analisis Keterlambatan Proyek Jalur Pejalan Kaki (Studi Kasus: Jalur Pedestrian Jalan Kandang Roda – Pakansari) Rosa Kartika Maharani; Suwandari Dian Yunita
Jurnal Teknik Sipil Vol 2, No 2 (2021)
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (177.031 KB) | DOI: 10.31284/j.jts.2021.v2i2.2473

Abstract

The purpose of Kandang Roda – Pakansari Pedestrian Project is to supporting pedestrians to be more comfortable, safe and also to make the face of the capital city of Bogor Regency be more attractive for tourism. The purpose of research is to identify major factors that contribute the most on project delays. The research is using quantitative methods and questionnaire towards the employee of DINAS PUPR Bogor Regency as the owner and the employee of PT. Vanca Utama Perkasa as the main contractors. The questionnaire will be collected using SPSS software. The research is required to avoid similar fault and causing many loss. The results of research said that Environment Factor (X.6) is being the major factor that affect delays on this project according to Statistic Descriptive Analysis test. The factor had 4.00 mean bigger than others, with Availability of utilities (cables); PLN, Telkom, PDAM, Fiber Optic which are underground as the indicato (X6.11). The result is support by T Test with a probability value of 0.0000 which means that partially there is a significant influence between these variables and project delays
Risk Analysis of Heritage Building in Jakarta Yunita Dian Suwandari; Mawardi Amin; M.Agus Primatama
International Journal of Applied Business and International Management Vol 5, No 2 (2020): August 2020
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (232.009 KB) | DOI: 10.32535/ijabim.v5i2.862

Abstract

The purpose of this study is to identify risk factors that influence building safety. The damage suffered by cultural heritage building requires the owner and manager of the building to further improve the supervision of the building safety aspects. This research was conducted in Jakarta and the methods used to identify risks were interviews and questionnaires. Risk analysis uses probability and weight matrices. Finally, there are 23 high risks and the solution can be identified for reducing the risk. The results of this study are beneficial for owners of heritage buildings and the government. Furthermore, the results of this study are also beneficial for academics studying the heritage building field as a literature review.
Development of Operational Standards for Risk-Based Cultural Heritage Office Building Maintenance Procedures That The Building Safe and Comfortable to use (Study Case Heritage Office Building PT.X) Yunita Dian Suwandari; Leni Sagita Riantini
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/jicp.v2i1.505

Abstract

Maintain a sustainable heritage building is currently a crucial challenge.The heritage building is unique from its structure and values such as a historical, education, aesthetics, economy, architecture,community and it requires special handling. One of the problems of heritage buildings in the absence of operational standards (SOP) for maintenance in Indonesia. The purpose of this study to develop a standard operational model maintenance heritage building of risk-based.The research data compose literature review, questionnaires, and qualitative risk data analysis.The risk analysis identified 20 risks of 40 risks variables have the highest risk rank. The result of the study established a risk-based SOP heritage building maintenance.The conclusion it can help to build management in improving the quality of heritage building maintenance practise.
Pemodelan Probabilistik untuk Memprediksi Risiko Kerusakan Struktur Beton pada Tahap Konstruksi pada Gedung Bertingkat M Mirnayani; Yunita Dian Suwandari
Prosiding Seminar Nasional Teknik Sipil UMS 2020: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1245.717 KB)

Abstract

Kasus kegagalan bangunan sering terjadi pada saat pelaksanaan konstruksi, dari kasus kegagalan ringan sampai kasus kegagalan berat. Contoh dari kasus tersebut adalah terjadinya retakan bahkan ambruknya bangunan. Sehingga kegagalan bangunan menjadi momok besar bagi dunia konstruksi. Penyebab dari kegagalan bangunan salah satunya disebabkan oleh kerusakan struktur beton. Penyebab kerusakan beton dapat terjadi saat sebelum dan sesudah proses pengerasan beton. Kerusakan struktur beton terjadi diakibatkan oleh berbagai faktor, seperti faktor beban struktur, faktor perencanaan, faktor pelaksanaan (pengecoran dan perawatan) dan faktor lingkungan. Kerusakan pada struktur beton terjadi pada struktur kolom, balok, pelat dan dinding beton. Penelitian ini menggunakan pendekatan kuantitatif yaitu dengan menggunakan Bayesian Belief Network (BBN). BBN digunakan untuk mengakomodasi hubungan antara variabel penyebab terjadinya kerusakan struktur beton pada konstruksi gedung pada faktor dominan.. Sampel yang dipakai untuk mencari variabel penyebab terjadinya kerusakan struktur beton adalah 16 gedung bertingkat di Jakarta. Analisa hubungan antar variabel dilakukan melalui kuisioner terhadap pakar. Model BBN diperoleh dengan menggabungkan model konseptual dari hasil literatur review dengan model konseptual hasil wawancara pakar. Output dari penelitian ini adalah model yang diharapkan dapat digunakan untuk mengetahui prosentase terjadinya risiko kerusakan struktur beton pada konstuksi gedung bertingkat yang disebabkan karena variabel dari faktor dominan penyebabnya.
Analisis Faktor Supply Material Terhadap Keterlambatan Proyek Di Era Pandemi Covid-19 (Studi Kasus Jalur Pedestrian Kandang Roda – Pakansari) Nabilah Islamiati; Yunita Dian Suwandari
Jurnal Teknik Sipil Vol 2, No 2 (2021)
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (332.966 KB) | DOI: 10.31284/j.jts.2021.v2i2.2306

Abstract

Adanya Pandemik Covid-19 mempengaruhi konstruksi di Indonesia.  Permasalahan pengadaan material menjadi salah satu hambatan dalam kelancaran penyelesaian pembangunan proyek Jalur Pedestrian Kandang Roda – Pakansari. Tujuan dari penelitian adalah memberikan gambaran dampak Covid-19 terhadap supply material di proyek Jalur Pedestrian. Penelitian ini bermanfaat bagi pemerintah, kontraktor dan pemilik proyek dalam upaya memitigasi risiko agar proyek tetap berjalan lancar sesuai dengan rencana. Pengumpulan data menggunakan kuisioner berdasarkan 30 responden yang terlibat secara langsung maupun tidak langsung dalam proyek. Metode yang digunakan adalah deskriptif kuantitatif dengan SPSS versi 25.0 sebagai pengolah data kuesioner. Hasil analisis penelitian ini adalah teridentifikasinya Faktor Fluktuasi Harga Material (X1) dan Faktor Penumpukan Material (X6) merupakan faktor dominan yang mempengaruhi penyediaan material dalam Proyek Jalur Pedestrian Kandang Roda – Pakansari. Artinya, pihak kontraktor maupun pemilik proyek bisa menghindari terjadinya faktor tersebut dengan melakukan percepatan pembelian material yang sudah disepakati dalam kontrak demi menghindari terjadinya fluktuasi harga material yang semakin tinggi, serta melakukan koordinasi serta pengawasan lapangan secara berkala dan menjaga komunikasi antara anggota tim proyek dengan penyedia material dalam memantau ketersediaan bahan yang digunakan dalam proyek agar tidak terjadinya penumpukan material di proyek.
ANALISIS FAKTOR-FAKTOR PENYEBAB PEKERJAAN ULANG ATAU REWORK PADA PROYEK KONSTRUKSI (Studi Kasus : Proyek Apartemen Sky House BSD+ Phase 2): Analysis of Factors Causing Rework on Construction Projects (Case Study: Sky House BSD+ Phase 2 Apartment Project) Mey Sillvia Afrianti,; Yunita Dian Suwandari; Mohamad Ferdaus Noor Aulady
Spektrum Sipil Vol 10 No 2 (2023): SPEKTRUM SIPIL
Publisher : Jurusan Teknik Sipil Fakultas Teknik Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29303/spektrum.v10i2.327

Abstract

Dalam proses pelaksanaan sebuah proyek seringkali mengalami kendala yang membuat terhambatnya penyelesaian proyek konstruksi. Salah satu yang dapat menghambat suatu proyek konstruksi adalah disebabkan oleh adanya pekerjaan ulang atau rework. Rework dapat terjadi pada setiap proyek konstruksi, hal ini juga terjadi pada proyek Apartemen Sky House BSD+ Phase 2. Proyek ini mengalami penambahan waktu karena terjadinya pekerjaan yang kualitasnya tidak memenuhi standar kriteria yang telah ditentukan sehingga diperlukan pekerjaan rework untuk memperbaiki mutu dan kualitas dari pekerjaan tersebut. Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor yang menyebabkan terjadinya pekerjaan rework, mengetahui faktor dominan pekerjaan rework serta mengetahui solusi pencegahan terhadap faktor yang menyebabkan terjadinya pekerjaan rework pada proyek Apartemen Sky House BSD+ Phase 2. Penelitian ini menggunakan metode analisis kuantitatif dengan instrumen penelitian kuesioner, kemudian dianalisis menggunakan Microsoft Excel dan program computer SPSS. Hasil penelitian ini menunjukkan bahwa ada 6 faktor utama penyebab terjadinya pekerjaan ulang atau rework, yaitu faktor desain dan dokumentasi, faktor manajerial, faktor sumber daya, faktor manajerial dan peralatan dan faktor site conditions. Faktor yang paling dominan penyebab pekerjaan ulang atau rework pada proyek Apartemen Sky House BSD+ Phase 2 adalah faktor desain dan dokumentasi dengan sub variabel perubahan desain (X1.1), tidak ada shop drawing yang matang dari segi detail (X1.6), faktor manajerial dengan sub variabel kurangnya kontrol di lapangan (X2.1), dan faktor sumber daya dengan sub variabel prosedur kerja yang salah (X3.3). Solusi pencegahan pekerjaan rework adalah untuk desain gambar harus diperhatikan perencanaannya, shop drawing harus dibuat dengan tingkat detail yang jelas, melakukan pengawasan extra pada tenaga kerja agar kesalahan kerja dapat diminimalisir dan sering melakukan rapat koordinasi lapangan untuk mengetahui apakah pekerjaan di lapangan sudah berjalan sesuai dengan prosedur pekerjaan.