Found 25 Documents
Search

PEMAHAMAN SISWA SMA TENTANG ARTI MARKA JALAN DAN PERATURAN LALU LINTAS Jatiputro, Achmad Hercahyo; Setiyaningsih, Ika; Mulyono, Gotot Slamet
Eco Rekayasa Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid development of Surakarta closely impact on people mobility and transportation in the city. It can be seen from traffic volume increasing on some major roads in Surakarta. At peak hour, traffic in Surakarta is dominated by motorcycle. According to Police Traffic Unit of Surakarta data, the highest ranked accident by the type of mode of transportation is a mo-torcycle and the highest accident victims in the productive age which is 16-30 years. By education level, the highest number of traffic violations conducted by the level of high school education. Based on this condition it is necessary to do research on the characteristics of high school students who use motorcycles. The focus of this research is to determine high school student understanding of the road markings meaning and traffic regulations. This study uses a questionnaire tools that have previously been tested for validity and reliability. Research sample is high school student of Batik 2 Surakarta with a total sample of 140 respondents.The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. While the results of the discussion on the understanding of traffic regulations showed the respondents level of understanding with the three classifications which is very understand there were 121 respondents, 19 respondents are understand classification and classification do not understand as much as 0 respondents.
PEMAHAMAN SISWA SMA TENTANG ARTI MARKA JALAN DAN PERATURAN LALU LINTAS Jatiputro, Achmad Hercahyo; Setiyaningsih, Ika; Mulyono, Gotot Slamet
Eco Rekayasa: Jurnal Teknik Sipil Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid development of Surakarta closely impact on people mobility and transportation in the city. It can be seen from traffic volume increasing on some major roads in Surakarta. At peak hour, traffic in Surakarta is dominated by motorcycle. According to Police Traffic Unit of Surakarta data, the highest ranked accident by the type of mode of transportation is a mo-torcycle and the highest accident victims in the productive age which is 16-30 years. By education level, the highest number of traffic violations conducted by the level of high school education. Based on this condition it is necessary to do research on the characteristics of high school students who use motorcycles. The focus of this research is to determine high school student understanding of the road markings meaning and traffic regulations. This study uses a questionnaire tools that have previously been tested for validity and reliability. Research sample is high school student of Batik 2 Surakarta with a total sample of 140 respondents.The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. While the results of the discussion on the understanding of traffic regulations showed the respondents' level of understanding with the three classifications which is very understand there were 121 respondents, 19 respondents are understand classification and classification do not understand as much as 0 respondents.
Evaluasi Pengendalian Waktu dan Produktivitas Tenaga Kerja Pelaksanaan Proyek Pembangunan Gedung Parkir Menggunakan Metode Jaringan Kerja Critical Path Methode (CPM) (Studi Kasus : Gedung Parkir Balai Kota Semarang) Sahid, Muhammad Nur; Mulyono, Gotot Slamet; Nuryanto, Aziz Singgih Jati; Abdurrosyid, Jaji
Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil Vol. 13/No.2/Desember 2020
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (951.943 KB) | DOI: 10.23917/dts.v13i2.13057

Abstract

Seiring dengan peningkatan pertumbuhan penduduk dan perkembangan dalam dunia konstruksi membawa sebuah dampak dalam sistem perekonomian dan di berbagai sektor. Kemajuan teknologi membuat proyek berkembang dan beraneka ragam sesuai dengan kemajuan jaman. Hal ini memerlukan teknik  perencanaan yang sistematis, efisien dan efektif dalam pengelolaan pelaksanaan pembangunan bidang manajemen proyek agar tercapai hasil yang optimum. Tujuan Penelitian ini  untuk melakukan evaluasi pelaksanaan pembangunan proyek gedung parkir balai kota Semarang sudah sesuai rencana atau belum, ditinjau dari waktu serta penjadwalan ulang kegiatan dengan menggunakan metode CPM (Critical Path Methode).  Pengendalian waktu kerja digunakan dengan pedoman   sisa waktu yang ada   dengan  cara mempercepat (crashing) untuk mencari waktu paling optimum  pada  pekerjan tersebut. Waktu kritis  pada lintasan yang ada gambar CPM.. Waktu kritis  dan lintasan yang dipilih pada gambar  CPM adalah  kegiatan kritis  pekerjaan pondasi, pekerjaan bata plesteran, pekerjaan plafon, pekerjaan pasang lantai, pekerjaan kusen, pekerjaan sanitasi, pekerjaan mekanikal elektrikal   pekerjaan cat.. Selanjutnya dilakukan beberapa percobaan  percepatan sampai didapat waktu optimum menjadi 45 hari dan efisiensi biaya sebesar  Rp. 5.647.916, dari total nilai kontrak sebesar Rp 8.240.175.437.
DAMPAK FLY OVER MANAHAN TERHADAP ARUS LALU LINTAS Susi Febriana; Nurul Hidayati; Gotot Slamet; Ika Setiyaningsih
Jurnal Litbang Sukowati : Media Penelitian dan Pengembangan Vol 4 No 1 (2020): Vol. 4 No. 1, November 2020
Publisher : Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan Kabupaten Sragen

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (465.072 KB) | DOI: 10.32630/sukowati.v4i1.120

Abstract

Surakarta has several locations prone to congestion due to at grade highway-railway crossing, one of which is in the Manahan area. The solution made by the government to overcome this problem was to build the Fly Over. Nevertheless, this condition affects the surrounding traffic condition, such as on Slamet Riyadi Street. This study aims to determine the characteristics of the traffic, and the existing performance of the road, then to compare it with the previous road performance. The primary data used are the existing condition of geometric, side frictions, volume and travel time which is then analyzed using IHCM 1997. The results show that ??during morning peak hour is obtained a volume of 1827.7 pcu per hour with the averages speed is 38.25 km per hour. The road performance expressed by the degree of saturation is obtained at 0.38. This value is smaller than before the change. This shows that the performance after the Fly Over is better than before. Nevertheless, both performances are still categorized in good condition.
Evaluasi Pengendalian Waktu dan Produktivitas Tenaga Kerja Pelaksanaan Proyek Pembangunan Gedung Parkir Menggunakan Metode Jaringan Kerja Critical Path Methode (CPM) (Studi Kasus : Gedung Parkir Balai Kota Semarang) Muhammad Nur Sahid; Gotot Slamet Mulyono; Aziz Singgih Jati Nuryanto; Jaji Abdurrosyid
Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil Vol. 13/No.2/Desember 2020
Publisher : Departement of Civil Engineering, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (951.943 KB) | DOI: 10.23917/dts.v13i2.13057

Abstract

Seiring dengan peningkatan pertumbuhan penduduk dan perkembangan dalam dunia konstruksi membawa sebuah dampak dalam sistem perekonomian dan di berbagai sektor. Kemajuan teknologi membuat proyek berkembang dan beraneka ragam sesuai dengan kemajuan jaman. Hal ini memerlukan teknik  perencanaan yang sistematis, efisien dan efektif dalam pengelolaan pelaksanaan pembangunan bidang manajemen proyek agar tercapai hasil yang optimum. Tujuan Penelitian ini  untuk melakukan evaluasi pelaksanaan pembangunan proyek gedung parkir balai kota Semarang sudah sesuai rencana atau belum, ditinjau dari waktu serta penjadwalan ulang kegiatan dengan menggunakan metode CPM (Critical Path Methode).  Pengendalian waktu kerja digunakan dengan pedoman   sisa waktu yang ada   dengan  cara mempercepat (crashing) untuk mencari waktu paling optimum  pada  pekerjan tersebut. Waktu kritis  pada lintasan yang ada gambar CPM.. Waktu kritis  dan lintasan yang dipilih pada gambar  CPM adalah  kegiatan kritis  pekerjaan pondasi, pekerjaan bata plesteran, pekerjaan plafon, pekerjaan pasang lantai, pekerjaan kusen, pekerjaan sanitasi, pekerjaan mekanikal elektrikal   pekerjaan cat.. Selanjutnya dilakukan beberapa percobaan  percepatan sampai didapat waktu optimum menjadi 45 hari dan efisiensi biaya sebesar  Rp. 5.647.916, dari total nilai kontrak sebesar Rp 8.240.175.437.
Analisis Produktivitas Alat Berat Dan Biaya Pekerjaan Pemindahan Tanah Pada Pembangunan RSUD Pondok Aren Tangerang Selatan Anto Budi Listyawan; Muhammad Nur Sahid; Gotot Slamet Mulyono; Hanry Khairurizal Fadhlullah
Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil Vol. 14/No.1/Juli 2021
Publisher : Departement of Civil Engineering, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (203.865 KB) | DOI: 10.23917/dts.v14i1.15272

Abstract

Proyek pembangunan RSUD Pondok Aren menggunakan alat-alat berat pada dalam pekerjaan tanahnya. Untuk mengetahui kemampuan alat berat dalam setiap pekerjaan perlu dilakukan analisis alat berat excavator Komatsu PC50, excavator Hitachi Zx 210-5, three wheel roller Sakai KD7610 dan dump truck Colt FE SHD yang digunakan sehingga dapat mengetahui jumlah produktivitas dan biaya alat berat. Dalam penelitian ini dilakukan analisis untuk mendapatkan besarnya produktivitas, waktu, dan biaya alat berat berdasarkan data rencana dan data saat pelaksanaan untuk dilakukan perbandingan antara saat perencanaan dan pelaksanaan. Berdasarkan hasil analisis didapatkan produktivitas alat berat berdasarkan data pabrikasi lebih besar dibandingkan dengan saat pelaksanaan sehingga pada pelaksanaan dibutuhkan waktu 95 hari lebih lama dibandingkan waktu rencana. Besarnya biaya yang dikeluarkan pada pelaksanaan sebesar Rp 205.800.000 sedangkan pada perencanaan sebesar Rp.559.397.556 dengan selisih biaya pelaksanaan dan biaya perencanaan sebesar Rp 353.597.556 dimana biaya pada pelaksanaan lebih murah dibandingkan dengan perencanaan.
Evaluasi Kinerja Simpang Tiga Bersinyal (Studi Kasus Simpang Universitas Muhammadiyah Surakarta) Nurul Hidayati; Muhammad Rizki Agung Nugroho; Gotot Slamet Mulyono; Alfia Magfirona
Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil Vol. 14/No.2/Desember 2021
Publisher : Departement of Civil Engineering, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (295.743 KB) | DOI: 10.23917/dts.v14i2.16970

Abstract

Kemacetan lalu lintas sering terjadi di simpang karena merupakan tempat bertemunya berbagai pergerakan yang tidak sama arahnya. Perbedaan tersebut dapat menimbulkan kecelakaan lalu lintas, seperti yang terjadi di simpang bersinyal sekitar gerbang utama Universitas Muhammadiyah Surakarta. Simpang ini berada pada pusat tarikan pergerakan karena berdekatan dengan pusat perbelanjaan modern, perkantoran, dealer kendaraan, kampus dan rumah sakit. Adanya halte Batik Solo Trans di sekitar simpang tersebut juga menyebabkan adanya aktivitas bus yang berhenti untuk menaikkan dan menurunkan penumpang. Penelitian ini bertujuan untuk mengevaluasi kondisi simpang bersinyal yang terjadi pada saat peak hour pagi dan siang. Evaluasi yang dilakukan menggunakan metode Manual Kapasitas Jalan Indonesia 1997, dengan parameter utama penilaian kinerja adalah derajat kejenuhan, antrian dan tundaan. Berdasarkan hasil analisis dapat disimpulkan bahwa arus simpang tertinggi adalah 3123,7 smp/jam yang terjadi pukul 13.30-14.30, dengan volume pendekat tertinggi ada di Barat sebesar 1572,9 smp/jam. Kapasitas pada pendekat ini adalah sebesar 879,8 smp/jam, sehingga diperoleh derajat kejenuhan sebesar 1,71. Nilai ini sudah melebihi standar yang ditentukan yaitu sebesar 0,85. Selain Barat, pendekat lain yang tidak memenuhi adalah Utara dan Timur fase 1. Oleh karena itu simpang dianggap sudah tidak layak lagi. Berdasarkan hasil tersebut, maka simpang perlu dilakukan perbaikan, diantaranya melalui pengaturan ulang sinyal (baik fase maupun waktu sinyal), maupun dengan memperbaiki kondisi lingkungan sekitarnya termasuk geometriknya.
PEMAHAMAN SISWA SMA TENTANG ARTI MARKA JALAN DAN PERATURAN LALU LINTAS Achmad Hercahyo Jatiputro; Ika Setiyaningsih; Gotot Slamet Mulyono
Eco Rekayasa: Jurnal Teknik Sipil Vol. 11. No.1, Maret 2015
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid development of Surakarta closely impact on people mobility and transportation in the city. It can be seen from traffic volume increasing on some major roads in Surakarta. At peak hour, traffic in Surakarta is dominated by motorcycle. According to Police Traffic Unit of Surakarta data, the highest ranked accident by the type of mode of transportation is a mo-torcycle and the highest accident victims in the productive age which is 16-30 years. By education level, the highest number of traffic violations conducted by the level of high school education. Based on this condition it is necessary to do research on the characteristics of high school students who use motorcycles. The focus of this research is to determine high school student understanding of the road markings meaning and traffic regulations. This study uses a questionnaire tools that have previously been tested for validity and reliability. Research sample is high school student of Batik 2 Surakarta with a total sample of 140 respondents.The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. The results showed that the level understanding to road markings obtained 78 respondents are very understand, 51 respondents including category of understand and as many as 11 respondents do not understand. While the results of the discussion on the understanding of traffic regulations showed the respondents' level of understanding with the three classifications which is very understand there were 121 respondents, 19 respondents are understand classification and classification do not understand as much as 0 respondents.
Analisis Karakteristik dan Kebutuhan Parkir Kendaraan Pada Rumah Sakit Karima Utama Surakarta Gotot Slamet Mulyono; Dwi Eko Saputra; Ika Setiyaningsih
Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil Vol. 15/No.1/Juli 2022
Publisher : Departement of Civil Engineering, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (655.405 KB) | DOI: 10.23917/dts.v1i1.18440

Abstract

Rumah Sakit Karima Utama Surakarta adalah Rumah Sakit Khusus Bedah yang termasuk dalam Rumah Sakit dengan Tipe C untuk melayani kebutuhan medis masyarakat setempat. Fasilitas tersebut harus  memiliki fasilitas parkir yang cukup luas. Karena rumah sakit umumnya memiliki tempat parkir yang terbatas, sebagian bahu jalan diubah menjadi tempat parkir. Tujuan dari penelitian ini adalah untuk mengetahui karakteristik parkir dan perlu diperhatikan dalam pengelolaan ruang parkir. Data yang digunakan adalah data sekunder berupa waktu masuk/keluar masing-masing kendaraan, diperoleh dalam format tabel dari server parkir rumah sakit mulai pukul 07.00 sd 19 18 dan  20 Januari 2020, 12 jam sehari. 00 WIB. Analisis didasarkan pada pedoman Direktur Perhubungan Darat 1998, termasuk akumulasi tempat parkir, pengindeksan tempat parkir, jam parkir, volume tempat parkir, roaming tempat parkir, dan permintaan tempat parkir. Menurut analisis hari Senin, kumulatif harian tertinggi adalah 132/15 menit dengan mobil dan 253/15 menit dengan sepeda motor. Rata-rata jumlah mobil per hari adalah 239/12 jam dengan mobil dan 540,5/12 jam dengan sepeda motor.. Indeks parkir tertinggi mobil penumpang sebesar 110.00% dan sepeda motor 110,48% dengan rata rata durasi  parkir harian untuk mobil penumpang adalah 197,86 menit dan untuk sepeda motor 156,84 menit. Tingkat turnover parkir mobil penumpang dan sepeda motor  tertinggi terjadi sebesar 2,45 dan sepeda motor sebesar 3,14.
Analisis Kinerja Ruas Jalan Solo – Purwodadi KM. 2 – KM. 5 Nurul Hidayati; Annas Adhi Winata; Gotot Slamet Mulyono; Alfia Magfirona
Prosiding Seminar Nasional Teknik Sipil UMS 2022: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (346.025 KB)

Abstract

Jalan Solo-Purwodadi merupakan Jalan Kolektor yang menjadi penghubung dua kota besar. Jalan tersebut memiliki lalu lintas yang komplit pada jam sibuk. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis kondisi arus lalu lintas, kinerja ruas dan tingkat pelayanan Jalan Solo – Purwodadi KM. 2 – KM. 5. Data yang digunakan adalah data geometrik, hambatan samping, volume lalu lintas, peta lokasi, sistem jaringan jalan, dan kondisi guna lahan. Survei dilaksanakan pada 19 dan 21 Desember 2021 pada pagi dan sore hari. Analisis didasarkan pada Pedoman Kapasitas Jalan Indonesia 2014 dengan parameternya adalah hambatan samping, volume lalu lintas, kapasitas, derajat kejenuhan, kecepatan arus, dan tingkat pelayanan jalan. Hasil analisis diketahui hambatan samping sebagian besar berada diklasifikasi sangat tinggi, dengan nilai tertinggi sebesar 1852 frekuensi berbobot/jam. Volume jam puncak terbesar terjadi pada Selasa 21 pukul 06.35-07.35 WIB yaitu sebesar 1744,4 skr/jam dari arah Purwodadi dengan kapasitas ruasnya 1080,56 skr/jam. Berdasarkan kedua nilai tersebut didapat derajat kejenuhan sebesar 1,61 dari arah Purwodadi dengan kecepatan arus 8,76 km/jam. Tingkat pelayanan ratarata hari libur masih dalam batas kelayakan yaitu nilai derajat kejenuhannya tidak melebihi 0,75 (Level C), sedangkan hari kerja arah Solo pagi dan Purwodadi sore menunjukan Level E.