Susiyo, Johnsen
Bina Nusantara University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perbandingan Metode Konstruksi Plat Lantai Sistem Double Wire Mesh Dengan Sistem Half Slab Tedja, Michael; Prisilla, Anastasia; Carolina, Carolina; Wiharyanto, Dimas E. J.; Susiyo, Johnsen
ComTech: Computer, Mathematics and Engineering Applications Vol 4, No 2 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i2.2527

Abstract

Floor plate is a structure on two-story buildings or more. Like other structures, floor plate also develops over time. Demands a shorter time jobs at a cheaper cost are some reasons for structures development of house construction. Floor plate can be constructed with two different way: conventional which uses double wire meshand modern uses half slab. The purpose of this study is to determine which floor plate construction methods of double wire mesh and half slab is more efficient in terms of cost and time. The study is conducted using survey, comparative analysis and literature study. The results of this study indicate that both methods have advantages and disadvantages. Double wire mesh method takes cheaper construction costs while half slab method takes faster construction time.